Archives

Filtered on: HOV-Lanes

  • Red Mountain Freeway improvement project update

    December 8, 2015
    It has been a while since we last updated you on the Loop 202 (Red Mountain Freeway) improvement project, but if you’re an East Valley driver, you’ve probably noticed the progress.

  • Work continues on Loop 202 improvement project

    April 30, 2015
    It has been a while since we last updated you on the Loop 202 widening project, but if you’re an East Valley driver, you’ve probably noticed the progress.

  • Work begins on Loop 202 improvement project

    October 23, 2014
    ADOT’s newest freeway widening project in the Phoenix area has started this week along Loop 202 in Mesa.

  • ADOT takes a look back at 2011

    January 3, 2012
    The new year officially is here, but before we dive into 2012 we’re going to take a quick look back. ADOT’s Public Information/Media Relations team came up with a great list of the state’s major transportation accomplishments from 2011 and we thought we’d share it here on the blog!

  • HOV lanes open up in Chandler and the West Valley

    October 13, 2011
    Several miles of new HOV lanes opened earlier this week in Chandler and the West Valley … just in time for the Monday morning commute!

  • Westbound HOV lanes on Loop 101 aren't open yet, but they will be soon

    August 25, 2011
    If you live and drive the Loop 101 in the West and North Valley you probably noticed the first stretch of HOV lanes on the eastbound Loop 101 recently opened. These new lanes already have helped to ease congestion in the North Valley, especially during the morning commute. You may have also noticed that the westbound HOV lanes appear to be done as well, but are not opened. ADOT has not decided to taunt you – these lanes aren’t open yet for a reason.

  • Design-build projects satisfy the need for speed (and save money, too)

    July 7, 2011
    In less than a year, spectacular ramps and bridges have risen from bare ground in the southeast Valley. By this fall, they’ll link 12 miles of new high occupancy vehicle lanes on the Loop 202 (Santan Freeway) with Interstate 10 and the Loop 101 (Price Freeway) in Chandler -- see the project's progress in the slide show above.

  • HOV Lanes: Why we build them when we do

    June 2, 2011
    Crews are busy adding more than 80 lane miles of high occupancy vehicle (HOV) lanes to two Valley freeways – 30 miles in both directions on Loop 101 in the west Valley and 12 miles on east- and westbound Loop 202 in Chandler that will link directly to HOV lanes on the Loop 101 (Price Freeway) and Interstate 10.

Civil RightsTitle VI of the Civil Rights Act of 1964, and the Americans with Disabilities Act (ADA)

Pursuant to Title VI of the Civil Rights Act of 1964, and the Americans with Disabilities Act (ADA), ADOT does not discriminate on the basis of race, color, national origin, age, sex or disability. Persons that require a reasonable accommodation based on language or disability should contact ADOT’s Civil Rights Office at 602.712.8946 or at [email protected]. Requests should be made as early as possible to ensure the State has an opportunity to address the accommodation.

De acuerdo con el título VI de la Ley de Derechos Civiles de 1964 y la Ley de Estadounidenses con Discapacidades (ADA por sus siglas en inglés), el Departamento de Transporte de Arizona (ADOT por sus siglas en inglés) no discrimina por raza, color, nacionalidad, edad, género o discapacidad.  Personas que requieren asistencia (dentro de lo razonable) ya sea por el idioma o por discapacidad deben ponerse en contacto con la Oficina de Derechos Civiles al 602.712.8946 o en [email protected]. Las solicitudes deben hacerse lo más pronto posible para asegurar que el equipo encargado del proyecto tenga la oportunidad de hacer los arreglos necesarios.