Media Center

 

ADOT News Release

For additional information:

ADOT Media Relations

news@azdot.gov

800.949.8057

 

Slow down! Digital signs alerting motorists to their speed on Pecos Road

Realignment for South Mountain Freeway work means reduced speed limit
April 17, 2017

SMF Pecos Speed LimitPHOENIX – Slow down.

The Arizona Department of Transportation is sending that message to motorists traveling on a stretch of Pecos Road reconfigured for Loop 202 South Mountain Freeway construction.

ADOT and Connect 202 Partners, the developer building the South Mountain Freeway, have installed speed-monitoring equipment and signs showing motorists both how fast they are going and the reduced speed limit of 40 mph. The digital signs flash repeatedly when motorists travel more than 5 mph above the speed limit.

“Pecos Road is a local road, not a freeway, and construction is occurring on the other side of the concrete barricades,” said Rob Samour, ADOT’s senior deputy state engineer for major projects. “Motorists have a responsibility to slow down and obey the reduced speed limit.”

ADOT and Connect 202 Partners continue to monitor Pecos Road traffic and make refinements to ensure the safety of workers and motorists, including applying a new thermal reflective paint on the lane stripes and additional raised pavement markers to enhance visibility, along with additional signage and installing lane separator posts as needed to guide traffic.

On April 3, Pecos Road traffic between 24th and 40th streets shifted to an alignment that maintains two travel lanes in each direction with construction underway in Ahwatukee. The former eastbound lanes have been widened to accommodate traffic in both directions, with a double yellow line between.

By late May, Pecos Road between Desert Foothills Parkway and 24th Street will shift to this alignment.

Scheduled to open in late 2019, the South Mountain Freeway will provide a long-planned direct link between the East Valley and West Valley and a much-needed alternative to Interstate 10 through downtown Phoenix. Approved by Maricopa County voters in 1985 and again in 2004 as part of a comprehensive regional transportation plan, it will complete the Loop 202 and Loop 101 freeway system.

To stay informed about the South Mountain Freeway project and sign up for updates and weekly traffic alerts, please visit SouthMountainFreeway.com.

The Arizona Ombudsman – Citizens Aide helps citizens to resolve ongoing issues with State Agencies.

Civil RightsTitle VI of the Civil Rights Act of 1964, and the Americans with Disabilities Act (ADA)

Pursuant to Title VI of the Civil Rights Act of 1964, and the Americans with Disabilities Act (ADA), ADOT does not discriminate on the basis of race, color, national origin, age, sex or disability. Persons that require a reasonable accommodation based on language or disability should contact ADOT’s Civil Rights Office at civilrightsoffice@azdot.gov. Requests should be made as early as possible to ensure the State has an opportunity to address the accommodation.

De acuerdo con el título VI de la Ley de Derechos Civiles de 1964 y la Ley de Estadounidenses con Discapacidades (ADA por sus siglas en inglés), el Departamento de Transporte de Arizona (ADOT por sus siglas en inglés) no discrimina por raza, color, nacionalidad, edad, género o discapacidad.  Personas que requieren asistencia (dentro de lo razonable) ya sea por el idioma o por discapacidad deben ponerse en contacto con la Oficina de Derechos Civiles en civilrightsoffice@azdot.gov. Las solicitudes deben hacerse lo más pronto posible para asegurar que el equipo encargado del proyecto tenga la oportunidad de hacer los arreglos necesarios.