SOQ Received List

Contract Number:   2011-010.01
Contract Description:   Programs & Projects Specialist II - ADA Data Collection - in various locations statewide
Contract Tracs #:   H809601D

Consultant (Count:5)
Sub Consultant
AECOM Technical Services, Inc.
Steven Fowler
2777 E. Camelback Rd Ste 200
Phoenix AZ85016
Ph: 602.337.2777
Fax: 602.337.2620
Email: [email protected]


CEI - Consultant Engineering, Inc.
Sandy Schepis
10625 N. 25th Ave. Ste. 200
Phoenix AZ85029
Ph: 602.866.5090
Fax: 602.866.5085
Email: [email protected]


Horrocks Engineers
Trent Thatcher
7776 S. Pointe Pkwy West Ste. 101
Phoenix AZ85044
Ph: 602.454.1800
Fax: 602.454.1801
Email: [email protected]


Transportation Consultant Engineers, LLC
Barb Skelton
5426 West Misty Willow Ln
Glendale AZ85310 3733
Ph: 602.882.3111
Fax: 602.866.7387
Email: [email protected]


United Civil Group Corporation
Sarah Simpson
2803 N. 7th Ave. Ste. 16
Phoenix AZ85007
Ph: 602.265.6155
Fax: 602.265.6171
Email: [email protected]


Civil RightsTitle VI of the Civil Rights Act of 1964, and the Americans with Disabilities Act (ADA)

Pursuant to Title VI of the Civil Rights Act of 1964, and the Americans with Disabilities Act (ADA), ADOT does not discriminate on the basis of race, color, national origin, age, sex or disability. Persons that require a reasonable accommodation based on language or disability should contact ADOT’s Civil Rights Office at 602.712.8946 or at [email protected]. Requests should be made as early as possible to ensure the State has an opportunity to address the accommodation.

De acuerdo con el título VI de la Ley de Derechos Civiles de 1964 y la Ley de Estadounidenses con Discapacidades (ADA por sus siglas en inglés), el Departamento de Transporte de Arizona (ADOT por sus siglas en inglés) no discrimina por raza, color, nacionalidad, edad, género o discapacidad.  Personas que requieren asistencia (dentro de lo razonable) ya sea por el idioma o por discapacidad deben ponerse en contacto con la Oficina de Derechos Civiles al 602.712.8946 o en [email protected]. Las solicitudes deben hacerse lo más pronto posible para asegurar que el equipo encargado del proyecto tenga la oportunidad de hacer los arreglos necesarios.