SOQ Received List

Contract Number:   2011-029.01
Contract Description:   Supplemental Services Positions for the Transportation Enhancment and Scenic Roads Section
Contract Tracs #:   VARIOUS

Consultant (Count:5)
Sub Consultant
AECOM Technical Services Inc.
Natalya Hyland, PE
7720 N. 16th St. Ste. 100
Phoenix AZ85020
Ph: 602.648.2401
Fax: 602.371.1615
Email: [email protected]


Aztec Engineering Group, Inc.
Karim Dada
4561 E. McDowell Rd.
Phoenix AZ85008
Ph: 602.454.0402
Fax: 602.454.0403
Email: [email protected]


Corral Design Group, Inc.
Edward C. Corral
4632 S. 36th St.
Phoenix AZ85040
Ph: 602.222.9822
Fax: 602.222.9079
Email: [email protected]


Logan Simpson Design Inc.
Kristopher Gray
51 W. Third St. Ste. 450
Tempe AZ85281
Ph: 480.967.1343
Fax: 480.966.9232
Email: [email protected]


Transportation Consultant Engineers, LLC
Steve Bruflat
5426 West Misty Willow Ln
Glendale AZ85310 3733
Ph: 602.882.3111
Fax: 602.866.7387
Email: [email protected]


Civil RightsTitle VI of the Civil Rights Act of 1964, and the Americans with Disabilities Act (ADA)

Pursuant to Title VI of the Civil Rights Act of 1964, and the Americans with Disabilities Act (ADA), ADOT does not discriminate on the basis of race, color, national origin, age, sex or disability. Persons that require a reasonable accommodation based on language or disability should contact ADOT’s Civil Rights Office at 602.712.8946 or at [email protected]. Requests should be made as early as possible to ensure the State has an opportunity to address the accommodation.

De acuerdo con el título VI de la Ley de Derechos Civiles de 1964 y la Ley de Estadounidenses con Discapacidades (ADA por sus siglas en inglés), el Departamento de Transporte de Arizona (ADOT por sus siglas en inglés) no discrimina por raza, color, nacionalidad, edad, género o discapacidad.  Personas que requieren asistencia (dentro de lo razonable) ya sea por el idioma o por discapacidad deben ponerse en contacto con la Oficina de Derechos Civiles al 602.712.8946 o en [email protected]. Las solicitudes deben hacerse lo más pronto posible para asegurar que el equipo encargado del proyecto tenga la oportunidad de hacer los arreglos necesarios.