Interstate 17 to Fain Road Connector Corridor Study

   

The Arizona Department of Transportation and the Federal Highway Administration recently conducted a corridor location study to evaluate and identify a potential corridor for a future facility between Interstate 17 and State Route 89A.

Study Timeline
Spring 2011
Evaluation of options for corridors and connections; evaluation of environmental impacts

Fall 2011
Public meetings to share progress of the study and receive input on alternatives that have been developed to date.

Spring 2012
Final public meetings to present preferred alternative

Completion of final report and environmental overview

Project Information Contact: