260 AP 360 H788101C 260-C-(207)T SHOW LOW-MCNARY-EAGER HWY (MCNARY TO SUNRISE TURNOFF)
Globe District    Item #13713
Engineering Specialist: Howard Sara    Pre-Qualification: YES    Bid Opening: 12/7/2012 11:00:00 AM

SYSTEM PRESERVATION-RESTORATION/REHAB/RESURFACE

**The proposed pavement rehabilitation project is located in Apache County on State Route 260, from McNary to Sunrise Turnoff. The project begins at milepost 360.78 and extends easterly to milepost 378.72. The work consists of milling existing asphalt, paving asphaltic concrete, chip seal (precoated with PG 64-28 TR+), guardrail, striping and other related work.

 