Media Center

 

ADOT News Release

Arizona and Nevada announce opportunity to provide feedback on the Interstate 11 and Intermountain West Corridor Study

Public can comment online in February about Level 2 Analysis
February 11, 2014

PHOENIX – The Arizona and Nevada departments of transportation are hosting an online opportunity through the month of February for anyone interested in providing feedback on the latest Interstate 11 and Intermountain West Corridor Study results.

Today a public feedback period is being launched at www.i11study.com to provide an opportunity to comment on the Level 2 Analysis, which was recently completed by the study team. Those interested in providing input will be able to view a narrated presentation about the current status of the study and then submit comments online.

The two transportation departments have been working together since the summer of 2012 on the Interstate 11 and Intermountain West Corridor Study, which includes detailed corridor planning of a possible interstate link between the Phoenix and Las Vegas metropolitan areas, along with high-level visioning for potentially extending the corridor north to Canada and south to Mexico. Congress designated the future I-11 corridor between Phoenix and Las Vegas as part of the latest surface transportation bill, Moving Ahead for Progress in the 21st Century Act (MAP-21). 

Since last fall, the study team has explored the universe of alternatives for potential routes from Mexico to northern Nevada. That broad range of possible corridor alternatives underwent an initial evaluation and screening process by the study team in October. An additional level of analysis — the Level 2 Analysis — was recently conducted for the congressionally designated portion of the corridor that would connect Phoenix and Las Vegas. This month’s online feedback opportunity will allow the public to view the results of this recent analysis and provide feedback prior to the study moving forward. Those interested in participating should visit the project website at www.i11study.com.  

Online feedback for this phase of the study is being accepted through the end of February. However, comments about the I-11 study can be submitted at any time via the project website on the “Get Involved” page.

The Interstate 11 and Intermountain West Corridor Study is a two‐year, multiphase, high‐level study examining the feasibility, benefits, opportunities and constraints of a proposed new interstate highway corridor. This initial study is expected to be completed later this year. Funding to construct a potential corridor has not been identified. In addition to the Arizona and Nevada departments of transportation, the Maricopa Association of Governments, Regional Transportation Commission of Southern Nevada, Federal Highway Administration and Federal Railroad Administration are partners in this study.

For more information about the I‐11 and Intermountain West Corridor Study and to sign up for updates, visit www.i11study.com.
Civil RightsTitle VI of the Civil Rights Act of 1964, and the Americans with Disabilities Act (ADA)

Pursuant to Title VI of the Civil Rights Act of 1964, and the Americans with Disabilities Act (ADA), ADOT does not discriminate on the basis of race, color, national origin, age, sex or disability. Persons that require a reasonable accommodation based on language or disability should contact ADOT’s Civil Rights Office at 602.712.8946 or at [email protected]. Requests should be made as early as possible to ensure the State has an opportunity to address the accommodation.

De acuerdo con el título VI de la Ley de Derechos Civiles de 1964 y la Ley de Estadounidenses con Discapacidades (ADA por sus siglas en inglés), el Departamento de Transporte de Arizona (ADOT por sus siglas en inglés) no discrimina por raza, color, nacionalidad, edad, género o discapacidad.  Personas que requieren asistencia (dentro de lo razonable) ya sea por el idioma o por discapacidad deben ponerse en contacto con la Oficina de Derechos Civiles al 602.712.8946 o en [email protected]. Las solicitudes deben hacerse lo más pronto posible para asegurar que el equipo encargado del proyecto tenga la oportunidad de hacer los arreglos necesarios.