State Route 79 and 79B Intersection Improvement Project

PLEASE PARTICIPATE!

We need your input on design alternatives for the intersection of State Routes 79 and 79B, south of Florence.

We Need Your Input

The Arizona Department of Transportation (ADOT) is evaluating the intersection in order to recommend improvements and safety enhancements. Two alternatives have been developed. These alternatives are being evaluated based on design and safety elements, construction cost, constructability and public input. We need your input on these alternatives.

Please review the alternatives below and then fill out and return the comment card to:

ADOT
c/o Community Relations
2540 N. Tucson Blvd.
Tucson, AZ 85716
angie@gordleydesign.com

This project is a Traffic Safety Section spot improvement project and will be funded with Federal safety funds. It is not currently listed in the Tentative 2011-2015 Five-Year Transportation Facilities Construction Program; however, it is expected to progress to design and construction when this evaluation phase is complete. No new right-of-way will be required.

Town Council Presentation

The project team is scheduled to present information about the project to the Town of Florence at the Town Council Meeting in July. You are welcome stop by to meet the project team and ask any questions you may have.

July 19, 2010, 6 p.m.
775 N. Main street
Florence, AZ 85132

Alternatives

NO-BUILD ALTERNATIVE – CURRENT CONFIGURATION
The intersection is currently a four-leg configuration, with two one-way approaches. In addition to the two alternatives, the project team will evaluate a “no-build” alternative, which would leave the intersection as it is today.

Existing Configuration

ALTERNATIVE 1 ROUNDABOUT
Alternative 1 would change the intersection to a roundabout configuration.

Alternative 1 - Roundabout

ALTERNATIVE 2 T-INTERSECTION

Alternative 2 would change the intersection to a T-intersection.

Alternative 2 - T-Intersection

At a Glance

 

No-Build Alternative

Alternative 1
Roundabout

Alternative 2
T-Intersection

Design Elements

  • Three points for potential vehicle conflict.
  • Potential remains for right-angle collisions.
  • Driver confusion is not removed.
  • No improvements made.

 

  • Three points for potential vehicle conflict.
  • Minimal potential for right-angle collisions.
  • Right turns only.
  • Lower speeds reduce crash severity.
  • Eliminates vehicle-to-vehicle crossing conflicts.
  • Six points for potential vehicle conflict.
  • Driver confusion is removed.

 

Construction Cost

  • $0
  • $1,914,000
  • $1,839,000

Constructability

  • No restrictions or impacts to traffic.
  • Construct new alternate roadways.
  • Maintain traffic on existing roadways during construction.
  • Construct new alternate roadways.
  • Maintain traffic on existing roadways during construction.
  • SR 79 traffic restrictions during construction.
For More Information

FOR MORE INFORMATION

For more information, or to submit comments regarding the alternatives, please contact Angie Brown, ADOT Consultant for Community Relations, at:

ADOT
c/o Community Relations
2540 N. Tucson Blvd.
Tucson, AZ 85716
520.327.6077 (phone)
520.327.4687 (fax)
angie@gordleydesign.com

 


Contact Information
Public Involvement Coordinator
Angie Brown
Gordley Design Group

520.327.6077

Privacy Statement | Contact ADOT
© Copyright Arizona Department of Transportation. All Rights Reserved