The purpose of this project is to add capacity to and improve operations of I-17 from Milepost (MP) 232 to MP 262.
The purpose of this study is to prepare a design concept report and environmental documentation for improvements to the segment of Interstate 17 between the New River Traffic Interchange (TI) (MP 232) and the Cordes Junction TI (MP 262+), a length of approximately 30 miles. This section of I-17, designated the "Arizona Veteran's Highway" in 2004, currently consists of two lanes in each direction, traversing rolling terrain in the southern and northern segments and mountainous terrain in the middle of the project.
I-17 is part of the National Highway System and connects I-10 with I-40, two of the nation's principal east-west interstate highways. I-17 also provides the major connection between Phoenix and communities in northern Arizona. This project will explore various means of adding capacity to I-17.
The study segment is located in a rural area of Maricopa and Yavapai counties. The Agua Fria National Monument, administered by the Bureau of Land Management, is located immediately east of the I-17 right-of-way from approximately MP 245 to MP 260.
ADOT had hoped to have public meetings this year, but those may be delayed until 2009.
Because of the Statewide Transportation Investment Strategy adopted by the State Transportation Board, the uncertainty of transportation funding in the future, and transportation planning efforts currently underway, ADOT needs to look closely at how this project fits within long range plans before we present it to the public.
If you would like to be invited to a public meeting, please send us an email with your name and address.
| Study Timeline - July 2008 |
| Winter 2007/Summer 2008 |
| |
Prepare preliminary engineering and environmental documents |
| |
|
| Fall 2008 |
| |
The study teams continue research and evaluation
|
| |
|
| Spring 2009 |
| |
Public Hearing |
| |
|
| Summer/Fall 2009 |
| |
Finalize documents; agency acceptance |
|
|