Permits Flow Procedures - Process

In order to process the request for approval, several items need to be prepared.  This includes:  Compose specs & cover letter, Prepare supporting documentation, Copy drawings and specs cited in permit specs, Detail copy of as-built showing new work if available, Red line permittee's plans, if necessary, and Stamp supporting documentation with permit number.  Once the documents are gathered into a package, it is routed for approval to appropriate signature authority. During this step it is the responsibility of the requestor to remedy any deficiency identified or make any changes deemed necessary.  Distribution includes as needed to: Permanent file (Phoenix), Inspector (construction or maintenance), Permittee/owner Applicant (if different from owner), Landscaping Supervisor, Traffic Engineering, Enforcement agency, Others, and Retain original documents except cover letter. Approved drawings as noted become the Permit Record Drawings. If the request is denied or the requestor fails to respond in a timely manner, the file will be closed.  Written notification of request status and may instruct the requestor to resubmit a request or correct the deficiency identified by ADOT.

<Back | Next>

 

    Arizona Department of Transportation    
   Disclaimer & Privacy Statement  |   Contact ADOT