This part of the Safe Routes to Schools (SRTS) project addresses its overall design from initial concepts and project scoping to final bid documents including plans, estimates, and bid manual with technical specifications. Project development also covers activities affecting the design of the SRTS project, which includes surveying and mapping; utility and right-of-way activities and clearances; the environmental determination; geotechnical and materials investigations including reports and recommendations; and drainage analysis, studies and recommendations. Project development is typically done by design and environmental consultants or the project sponsor in-house.
Evaluation Forms
- Student Arrival and Departure Tally Sheet (1 page)
- Parent Survey About Walking and Biking to School (1 form)
- Evaluation Forms (2 forms)
- Evaluation (Data) Form (3 pages)
Right of Way
- The Uniform Act Web Page (The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970)
- Federal Register 49 CFR 24 (Uniform Relocation Assistance and Real Property Acquisition for Federal and Federally-Assisted Programs; Final Rule) (50 pages)
- Right of Way Process Overview (3 pages)
- Right of Way Certification Memo (2 pages)
- Right of Way Checklist (1 page)
Post Construction Evaluation Forms
- Project Close-Out Evaluation Report (3 pages)
- Student Arrival and Departure Tally Sheet (1 page)
Adobe Reader Download
Documents are posted as they become available in PDF format, which requires Adobe Reader to view.

