ITD - Highways Home Page Home Page 
 













Roadway Design

Guardrail End Treatments (Current)

    ET-PLUS

    SS-409

    ET-PLUS Concrete Pavement Installation - 50' (Arizona) With 12'-6" Panels, 7 SYTP Posts in Tube Sleeves & 1 HBA Post on Concrete With "Leaveouts" (Current Drawing 09/20/07).
    ET-PLUS Asphaltic Concrete Installation - 50' With 12'-6" Rail Panels & HBA Posts 1 & 2: Plan, Elevation & Section (Current Drawing 05/16/11). (Supercedes 06/30/06 and 01/23/03 drawings)

    SRT

    SRT-350, (12.5' Panels, HBA  Posts)
    Slotted Rail Terminal SRT-350 Erection Details (12.5' Panels, HBA  Posts) - Arizona (Current Drawing 05/16/11). (Supercedes 01/10/03 drawing)

    FLEAT

    FLEAT-350, Flared Energy Absorbing Terminal, (FLT-US, 1-1)

    Assembly (6'-3" Post Spacing) for Wood Breakaway Post System (Current Drawing 06/04/11). (Supercedes 11-26-02 drawing)

    SKT

    SKT-350, Sequential Kinking Terminal

    Concrete Pavement Application, Plug-weld Steel Posts in Foundation Tubes (Current Drawing 9/20/07).
    Asphaltic Concrete Pavement Application, Assembly, 2 Foundation Tube Option, Wood Posts (Current Drawing 06-04-11). (Supercedes 11-26-02 drawing)

 

Superceded Guardrail End Treatments

    Arizona Department of Transportation    