| |
Privately Funded Projects:
Guidance for Conducting Environmental Compliance Analysis
Categorical Exclusions
Environmental Assessments (EAs)
Biology
Section 404-401 Procedures Applications and Permits
Section 4(f)
Noise Policy
Air Quality
Hazardous Materials
Environmental Justice
Cultural Resources
Public Meetings Guidance
Contractor-Furnished Material Sources
Geotechnical Clearance Process
NOTE: All of the following may not be required for every project.
The location, level of complexity and level of potential controversy
all serve to determine which analyses are required for any given
project. However, even if a full scale analysis is not required,
an initial assessment is needed to document why more investigation
is not warranted.
| |
| Categorical
Exclusions
(estimated review time required*: 15 working days) |
Categorical Exclusion (CE) Documentation:
Effective July 25, 2006, the practitioner will have
the option to choose between two formats of CE documentation
for ADOT highway projects. They are:
1. Categorical Exclusion Checklist
This checklist is the preferred format for environmental documentation
to help streamline the CE reporting process. The downloads
consist of the actual checklist working document (the Word
file), checklist introduction, guidelines to assist with the
completion of the checklist document, and clearance
memo templates. The clearance memo templates include a Group
One Categorical Exclusion and a Group Two Categorical Exclusion.
Please use the appropriate template and submit it with the
Categorical Exclusion Checklist. Categorical
Exclusion Checklist (file size: 624KB) Checklist
Guidelines Introduction (file size: 22KB)
Checklist
Guidelines (file size: 1.3MB)
Clearance
Memo Templates (file size: 340KB)
2. Completion Guidelines and Format / Clearance
Memo Templates
If the above Categorical Exclusion Checklist does not appear
to adequately support the level of environmental investigation
due to more complex or sensitive projects, these guidelines
provide an alternative format. The first link includes guidelines
that will the planning practitioner in preparing environmental
documentation for ADOT highway projects that are classified
as Categorical Exclusions. The second link includes clearance
memos that are presented in two templates: a Group One Categorical
Exclusion and a Group Two Categorical Exclusion. Please use
the appropriate template and submit it with the Categorical
Exclusion. Categorical
Exclusion and Environmental Determination: Completion Guidelines
and Format for ADOT Projects (file size: 1.1MB) Clearance
Memo Templates (file size: 340KB)
Guidance for Categorical Exclusion Groups One and
Two Projects
This guidance lists the type of projects and required documentation
for Group One and Group Two projects that are processed as
Categorical Exclusions. Guidance
for Categorical Exclusion Group One and Two Projects (file
size: 23KB) Guidance for Programmatic Categorical
Exclusion Approval
This guidance list conditions that apply to those actions
which qualify under 23 CFR 77.117(d) that are processed by
ADOT under programmatic approval. Guidance
for Programmatic Categorical Exclusion (file size: 120KB)
Categorical Exclusion Scoping Guidance
This guidance (updated May 2007) explains objectives, purpose,
techniques and point of contacts for sending scoping letters
during the initial phase of categorical exclusion documentation.
Categorical
Exclusion Scoping Guidance (file size: 11KB)
* All estimated times shown are for ADOT EPG staff review
only. Some reviews may occur concurrently. Timeframes do not
include timeframes for legally required reviews by other agencies
and/or jurisdictions. |
| |
| Environmental
Assessments (EAs)
(estimated review time required*: 32 working days) |
Environmental Assessment Format
There is no download describing content and format
for environmental assessments. To obtain this information,
please call Environmental Planning Group at 602-712-7767,
and ask to speak with a NEPA planner.
Council of Environmental Quality Regulations
This document consists of regulations for implementing the
National Environmental Policy Act (NEPA). Also included in
this document is the actual NEPA legislation.
Council
of Environmental Quality Regulations (file size: 6.9MB) Federal Highway Administration
NEPA Regulations
This document consists of regulations for implementing the
NEPA legislation for projects funded by the Federal Highway
Administration.
Federal
Highway Administration NEPA Regulations (file size: 7.6MB) Federal Highway Administration
NEPA Guidance
These documents provide guidance for the practitioner in preparing
Categorical Exclusions, Environmental Assessments, and Environmental
Impact Statements for highway projects funded by the Federal
Highway Administration.
Federal
Highway Administration NEPA Guidance (file size: 6.0MB) Environmental Overview
Outline
This outline will guide the practitioner in preparing environmental
overviews, which often precede the preparation of Environmental
Assessments.
Environmental
Overview Outline (file size: 45KB)
* All estimated times shown are for ADOT EPG staff review
only. Some reviews may occur concurrently. Timeframes do not
include timeframes for legally required reviews by other agencies
and/or jurisdictions. |
| |
| Biology
(estimated review time required*: 10 working days) |
ADOT EPG Biology Support Regions
This map delineates the geographical regions in the state
that are under the responsibility of the biologists within
the ADOT Environmental Planning Group. Biology
Support Regions (file size: 817KB) Biological
Procedures
These procedures will assist practitioners on preparing Biological
Evaluations. They include specific protocols within the ADOT
Environmental Planning Group, various land resource agencies,
and Tribal Nations. Biological
Procedures (file size: 68KB) Outline
for Biological Evaluations
This outline will assist practitioners in preparing Biological
Evaluations. Included is the format for the cover page, headers
for each topic, and instructions on completing each header.
Outline
for Biological Evaluations (file size: 58KB)
Biological Review Form
This form will assist practitioners in preparing Biological
Reviews for projects that do not require a Biological Evaluation
or Biological Assessment and Evaluation. Included are instructions
and checklist. Biological
Review Form (file size: 45KB)
Qualifications for Biologists
These qualification requirements are for on-call
consultants, or project consultants working on biological
resource
components of ADOT projects in development, maintenance or
construction.
Qualifications
for Biologists (file size: 17KB)
Biology Process Flowchart
This comprehensive flowchart illustrates the various steps
that are involved in addressing biological impacts within
the environmental process for ADOT's highway improvement projects.
Biology
Process Flowchart (file size: 319KB)
* All estimated times shown are for ADOT EPG staff review
only. Some reviews may occur concurrently. Timeframes do not
include timeframes for legally required reviews by other agencies
and/or jurisdictions. |
| |
| Section
404-401 Procedures Applications and Permits
(estimated review time required*: 10
working days) |
Section 404 Procedures Manual
This manual provides guidance on the preparation of jurisdictional
delineations, Nationwide Permit preconstruction notification
submittals, and Individual Permit applications. This manual
is divided into 5 easy-to-follow steps beginning with jurisdictional
delineations and ending with Section 401 certification. This
is a must resource for all practitioners involved with Section
404 permitting.
Notification Forms
These three forms consist of Certification of Compliance,
Notification of Commencement of Work, and Notification of
Completion of Work. Certification
of Compliance with Department of the Army Nationwide Permit
(file size: 53KB) Notification
of Commencement of Work (file size: 55KB) Notification
of Completion of Work (file size: 53KB) Environmental
Protection on ADOT Projects - Instruction to Contractors
These one page document emphasizes the need for contractor
to follow mitigation measures on ADOT projects, including
those under Section 404. Instruction
to Contractors (file size: 53KB)
* All estimated times shown are for ADOT EPG staff review
only. Some reviews may occur concurrently. Timeframes do not
include timeframes for legally required reviews by other agencies
and/or jurisdictions. |
| |
| Section
4(f)
(estimated review time required*: 10 working days) |
|
Section 4(f) Policy Paper
This paper provides instructional guidance on when and how
to apply the provisions of Section 4(f) of the U.S. Department
of Transportation Act of 1966. It is based on a combination
of the requirements of the 4(f) statute, case law resulting
from litigation, and years of ad hoc decisions on project-by-project
basis.
Section
4(f) Policy Paper (file size: 3.1MB)
Negative Declaration Section 4(f) Statement
for Bikeway and Walkway Projects
This negative declaration covers those independent bikeway
and pedestrian walkway projects which require the use of
recreation and park areas. Its purpose is to reduce processing
time and delays in doing Section 4(f) evaluations.
Section
4(f) Negative Declaration (file size: 506KB)
* All estimated times shown are for ADOT EPG staff review
only. Some reviews may occur concurrently. Timeframes do not
include timeframes for legally required reviews by other agencies
and/or jurisdictions.
|
| |
| Noise
Policy
(estimated review time required*: 10 working days) |
ADOT Noise Abatement Policy
This recently updated policy is based on currently accepted
practices and procedures by federal and state transportation
agencies to assess and mitigate highway-related noise levels.
This updated policy became effective on December 5, 2005,
and supersedes the previous Noise Abatement Policy dated March
31, 2000.
ADOT
Noise Abatement Policy (file size: 346KB)
Flowchart for Noise Process
This handy flowchart shows the steps involved when evaluating
noise impacts for highway improvement projects.
Flowchart
for Noise Process (file size: 98KB)
* All estimated times shown are for ADOT EPG staff review
only. Some reviews may occur concurrently. Timeframes do not
include timeframes for legally required reviews by other agencies
and/or jurisdictions. |
| |
| Air
Quality
(estimated review time required*: 10
working days) |
|
Guidelines for Development of an Air Quality
Report Micro-scale Analysis
This document is to provide uniform guidelines
for the preparation or evaluation of project level air quality
analyses performed on proposed improvements to roadways
in Arizona.
Guidelines
for Development of an Air Quality Report Micro-scale Analysis
(file size: 30KB)
Air Quality Conformity Processes
These federal regulations cover the legal consultation
and methodology requirements on air quality conformity,
and the criteria/procedures for violations.
40
CFR 93.105: Consultation Requirements (file size:
42KB)
40
CFR 93.123: Procedures for Determining Localized CO and
PM10 Concentrations (file size: 42KB)
40
CFR 93.116: Criteria and Procedures for Localized CO and
PM10 Violations (file size: 36KB)
Flowchart for Air Quality Project-Level
Conformity Determination
This handy flowchart (last update 9-21-04) details the project
level components that the Environmental Planning Group has
to address when clearing every highway project. A must for
all practitioners involved in air conformity work for ADOT.
Flowchart
for Air Quality Project-Level Conformity Determination
(file size: 115KB)
FHWA Workshop on Transportation Conformity
This course (held in July 2006) was designed to provide
transportation and air quality planners and other stakeholders
with an introduction to Transportation Conformity. The downloads
below include:
• An overview of the transportation and air quality
planning
processes, and their relationship.
• A review of the major requirements of transportation
conformity.
• Highlights of certain aspects of the conformity
process, such as
interagency coordination and public participation.
Workshop
Handouts (file size: 352KB)
Day
1 - Conformity 101 (file size: 2.6MB)
Day
2 - MOBILE6.2 Emissions Modeling (file size: 3.1MB)
Course
Evaluation Form (file size: 118KB)
Non-Attainment Area Particulate Matter (PM10) Maps
These maps depict non-attainment areas for particulate matter
(PM10) throughout the state. They will assist practitioners
in assessing air quality impacts during their environmental
investigations.
Non-Attainment
Area PM10 Map for Ajo (file size: 31KB)
Non-Attainment
Area PM10 Map for Douglas (file size: 30KB)
Non-Attainment
Area PM10 Map for Hayden (file size: 50KB)
Non-Attainment
Area PM10 Map for Nogales (file size: 38KB)
Non-Attainment
Area PM10 Map for Paul-Spur (file size: 29KB)
Non-Attainment
Area PM10 Map for Phoenix (file size: 70KB)
Non-Attainment
Area PM10 Map for Rillito (file size: 29KB)
Non-Attainment
Area PM10 Map for Yuma (file size: 39KB)
Non-Attainment Area Ozone Map
This map depicts the non-attainment area for the eight-hour
ozone for the Phoenix metropolitan area. It will assist
practitioners in assessing air quality impacts during their
environmental investigations.
Non-Attainment
Area for Eight-Hour Ozone for Phoenix (file size: 347KB)
Maintenance Area Particulate Matter (PM10) Maps
These maps depict maintenance areas for particulate matter
(PM10) for Bullhead City and Payson. They will assist practitioners
in assessing air quality impacts during their environmental
investigations.
Maintenance
Area PM 10 Map for Bullhead City (file size: 32KB)
Maintenance
Area PM 10 Map for Payson (file size: 37KB)
Maintenance Area Carbon Monoxide (CO) Map
This map depicts the maintenance area for carbon monoxide
(CO) for the Tucson and Phoenix metropolitan areas. It will
assist practitioners in assessing air quality impacts during
their environmental investigations.
Maintenance
Area CO Map for Phoenix (file size: 64KB)
Maintenance Area CO Map for Tucson (file size: 40KB)
Maintenance Area Ozone Map
This map depicts the maintenance area for the one-hour
ozone for the Phoenix metropolitan area. It will assist
practitioners in assessing air quality impacts during their
environmental investigations.
Maintenance
Area for One-Hour Ozone for Phoenix (file size: 64KB)
Statewide Air Quality Map - Nonattainment and Maintenance
Areas
This map summarizes the nonattainment and maintenance areas
for carbon monoxide (CO), ozone, and particulate matter
(PM10) for the entire state. This handy map will be useful
for practitioners in assessing air quality impacts during
their environmental investigations.
Statewide Air Quality Map - Nonattainment and Maintenance
Areas (file size: 876KB)
Project Exemption List
This list consist of projects that are exempt from conformity
to transportation plans and TIPs.
Project
Exemption List (file size: 88KB)
Mobile Source Air Toxics Guidance
This guidance helps the practitioner evaluate the
mobile source air toxics on ADOT's highway improvement projects.
Included in the guidance is an instruction memo, and text
for Level 1 projects and Level 2 projects.
Mobile
Source Air Toxics Guidance Memo (file size: 101KB)
Level
1 Text (file size: 20KB)
Level
2 Text (file size: 488KB)
* All estimated times shown are for ADOT EPG staff review
only. Some reviews may occur concurrently. Timeframes do
not include timeframes for legally required reviews
by other agencies and/or jurisdictions.
|
| |
| Hazardous
Materials
(estimated review time required*: 10 working days) |
Draft Preliminary Initial Site Assessment
Form
This two-page form will assist practitioners in documenting
their findings for Preliminary Initial Site Assessments
(PISAs).
Draft
PISA form (file size: 54KB)
Asbestos Assessment Request Form
This one-page form is required to process an asbestos assessment
for upcoming ADOT projects.
Asbestos
Assessment Request Form (file size: 56KB)
Hazmat & Asbestos Process Flowchart
This flowchart details the project-level components that
ADOT EPG must address when clearing highway improvement
projects. A must for practitioners involved in hazardous
materials and asbestos work for ADOT.
Hazmat
& Asbestos Process Flowchart (file size: 122KB)
* All estimated times shown are for ADOT EPG staff review
only. Some reviews may occur concurrently. Timeframes do not
include timeframes for legally required reviews by other agencies
and/or jurisdictions.
|
| |
| Environmental
Justice
(estimated review time required*: 10 working days) |
Guidance on Title VI and Environmental Justice
This report will assist practitioners in documenting whether
highway improvement projects would have a disproportionate
high and adverse effects on minority and low-income populations.
This guidance is to be used for Environmental Assessments,
Environmental Impact Statements, and for projects requiring
a significant amount of new right-of-way.
Environmental
Justice Guidance (file size: 4.6MB)
Environmental Justice Flowchart
This handy flowchart outlines the process in determining
level of documentation for Environmental Justice.
Environmental
Justice Flowchart (file size: 260KB)
* All estimated times shown are for ADOT EPG staff review
only. Some reviews may occur concurrently. Timeframes do not
include timeframes for legally required reviews by other agencies
and/or jurisdictions.
|
| |
| Cultural
Resources
(estimated review time required*: 10 working days)
|
|
Historic Preservation Handbook
This valuable document serves as a process, procedures,
policy, and training manual for the cultural resource process
for ADOT projects. It is a must-have resource for archaeologists,
historic preservation specialists, and planning practitioners
This handbook will help these and related disciplines to
understand the what, why, who, when, where and how of the
EPG Historic Preservation Team's (HPT) operations, and how
these operations fit into their own processes.
Note: After the Handbook downloads, a pop-up
window may appear stating that "This document contains
macros." Click the button 'Yes' to continue. You may
be prompt to enter a password. Instead of entering a password,
click the 'Read Only' button on the lower right-corner of
the password window. After that, the document will open.
Historic
Preservation Handbook (file size: 7.8MB)
Report Reviewing Checklist
The Report Reviewing Checklist is used to ensure the adequacy
of cultural resource reports submitted to HPT. The Checklist
is a compilation of the Arizona State Museum's Reporting
Standards, the Arizona State Historic Preservation Administrative
Procedures, and the Guidelines for Report Production Standards
for ADOT Consultants.
Report
Reviewing Checklist (file size: 672KB)
State Historic Preservation Office Administrative Procedures
These procedures will assist the archaeologist in preparing
cultural resource survey reports for consultation with the
State Historic Preservation Office (SHPO). These procedures
are downloaded as a pdf file, and is to be viewed
using Adobe Reader.
SHPO
Administrative Procedures (file size: 785KB)
Historic Preservation Team Flowchart
This handy flowchart details the project level components
that the Environmental Planning Group has to address when
clearing every highway project.
Historic
Preservation Team Flowchart (file size: 212KB)
* All estimated times shown are for ADOT EPG staff review
only. Some reviews may occur concurrently. Timeframes do not
include timeframes for legally required reviews by other agencies
and/or jurisdictions.
|
| |
| Public
Meeting Guidance
(estimated review time required*: 5 working days) |
|
EPG Public Involvement Guidelines & Requirements
This comprehensive manual contains guidance
on planning, organizing, and implementing public meetings
and hearings for ADOT's highway development projects. This
is a must resource for the highway development practitioner.
The manual can be downloaded as a complete document (104
pages), or as individual chapters and appendices.
Download complete manual:
Complete
Public Involvement Guidelines & Requirements
(file size: 5.9MB)
Download individual chapters and appendices:
Cover
sheet and Table of Contents (file size: 84KB)
Chapter
1: Public Involvement Guidelines (file size: 2.1MB)
Chapter
2: How to Organize a Public Meeting (file size: 513KB)
Appendix
A: Public Involvement Checklist (file size: 74KB)
Appendix
B: Team Preparation Meeting; Set Meeting Date & Time;
Meeting Location/Contract (file size: 237KB)
Appendix
B: Insurance (file size: 269KB)
Appendix
B: Prepare Notices (file size: 701KB)
Appendix
B: Public Notice Distribution; Public Notice to Newspapers;
Distribution of DEA/DEIS (file size: 771KB)
Appendix
B: Meetings Materials; Special Arrangements (file size:
1.3MB)
Appendix
C: Checklist of Items to bring to the Meeting (file
size: 61KB)
* All estimated times shown are for ADOT EPG staff review
only. Some reviews may occur concurrently. Timeframes do not
include timeframes for legally required reviews by other agencies
and/or jurisdictions.
|
| |
| Contractor-Furnished
Material Sources
(estimated review time required*: 10 working days) |
|
The Environmental Planning Group oversees the preparation
of environmental documents for all material sources. These
documents insure that all relevant environmental factors
are appropriately addressed and mitigated. For
contractor-furnished material sources, the primary document
includes:
Material Source Environmental Analysis Application
The Contractor-Furnished Material Source (including Commercial
and Project-Specific) application process is now handled
directly by Environmental Planning Group (EPG). Please submit
all applications and updates to:
Angela Roach
Environmental Planning Group
Arizona Department of Transportation
1221 S. 2nd Ave., MD T100
Tucson, AZ 85713
Telephone: 1.520.388.4253
Email: Angela Roach
Please direct any questions concerning the application
process, forms, current status, approval, and other related
materials source issues to Angela Roach through the above
contact information.
All applicants must use the new Material Source Environmental
Analysis Application form to complete the ADOT Environmental
Analysis process in accordance with the 2000 edition of
Standard Specifications for Road and Bridge Construction
Section 104.12. As a reminder, state, vicinity, and site
maps are required with each application. Be sure to indicate
the haul road on the vicinity and site maps. Please note
the cultural survey and other questions, such as the one
pertaining to Threatened & Endangered Species, must
also cover the haul road, in addition to proposed material
source area.
Material
Source Environmental Analysis Application (file size:
130KB)
Material Source Tips
This document lists the most common mistakes that may delay
the environmental approval process and how they can be avoided.
Material
Source Tips (file size: 86KB)
State Historic Preservation Office Administrative Procedures
These procedures will assist the archaeologist in preparing
cultural resource survey reports for consultation with the
State Historic Preservation Office (SHPO). These procedures
are downloaded as a pdf file, and is to be viewed
using Adobe Reader.
SHPO
Administrative Procedures (file size: 785KB)
ADOT Standard Specification 104.12
This is the official reference for preparing Environmental
Analysis documents for Contractor-Furnished Material Sources.
Specification
104.12 (file size: 300KB)
ADOT Standard Specification 1001
This is the official reference for guidelines for material
sources conducting business with ADOT.
Specification
1001 (file size: 140KB)
ADOT List of Material Sources That Have Completed the
Environmental Analysis Process
This report lists those material sources (not ADOT
supplied) meeting the requirements of ADOT Standard
Specifications Section 104.12.
Material
Sources List (file size: 809KB)
* All estimated times shown are for ADOT EPG staff review
only. Some reviews may occur concurrently. Timeframes do
not include timeframes for legally required reviews
by other agencies and/or jurisdictions.
|
| |
| Geotechnical
Clearance Process
(estimated review time required*: 5 working days) |
Geotechnical Clearance Process
EPG has produced a streamlined electronic documentation process
for geotechnical clearance. The links below provide guidance
and required documentation to process geotechnical clearance
for ADOT projects.
Geotechnical
Clearance Process (file size: 24KB)
Geotechnical
Compliance Form (file size: 61KB)
Draft
Preliminary Initial Site Assessment (PISA) form (file
size: 53KB)
Geotechnical Investigation Biological Clearance Form
This form is a biological compliance checklist for ADOT geotechnical
activities. The biologist consultant submits the completed
form to the EPG regional biologist for review, and followed
by incorporation into the overall geotechnical compliance
document.
Geotechnical
Investigation Biological Clearance Form (file size:
1.2MB)
* All estimated times shown are for ADOT EPG staff review
only. Some reviews may occur concurrently. Timeframes do not
include timeframes for legally required reviews by other agencies
and/or jurisdictions. |
>> Privately Funded
Projects Index Page
Documents are posted as they become available in PDF format,
which requires Adobe Reader to view.
|