Arizona Department of Transportation
Arizona Department of Transportation
Intermodal Transportation Division
Arizona @ Your Service

Keyword Search   Go
ITD - Highways Home Page
Site Map

EPG's FTP Site



Planning

Material Sources

Air Quality

Noise

Hazardous Materials

Biology/Water Quality

Cultural Resources



Environmental Documents

Guidance

Videos

Public Meeting Notices

Brown Bag Schedule

Links



Quiet Roads

Contact Information



Environmental Planning Group Home Page
 az511  az511
Adopt a Highway Program

 Adopt
 a
Highway
Program


Local Government

  
Categorical Exclusion (CE) Checklist

This checklist is used to document the CE reporting process. The downloads consist of the actual checklist working document, checklist guidelines (to assist with the completion of the checklist document), and clearance memo templates.
The clearance memo templates include a Group One Categorical Exclusion and a Group Two Categorical Exclusion. Please use the appropriate template and submit it with the Categorical Exclusion Checklist.

 Categorical Exclusion Checklist
 Checklist Guidelines

 Clearance Memo Templates for Local Government Projects

Categorical Exclusion Checklist Example
This document is an example of a completed and approved Categorical Exclusion Checklist for a local government project (approved by EPG on June 14, 2006).

 Categorical Exclusion Checklist Example


Guidance for Categorical Exclusion Groups One and Two Projects
This guidance lists the type of projects and required documentation for Group One and Group Two projects that are processed as Categorical Exclusions.

 Guidance for Categorical Exclusion Group One and Two Projects
 
Project Data Sheet for Local Governments
This form is to be submitted by the local government entity when they do their preliminary environmental investigation on newly assigned projects.

purple arrow Project Data Sheet for Local Governments

Local Government Environmental Process 
This guidance highlights the important environmental activities of local government projects beginning with the Initial Design Concept Report or Initial Project Assessment and ending with the Final Environmental Determination.

purple arrow Local Government Environmental Process

 
Documents are posted as they become available in PDF format, which requires Adobe Reader to view.

 

Privacy Statement | Contact ADOT
© Copyright Arizona Department of Transportation All Rights Reserved