Traffic

Signing and Marking Standard Drawings

Current

This page provides a PDF copy of the Traffic Engineering Signing and Marking Standard Drawings. The issue date is provided to assist the user in determining the most recent revision (but is not the official release date of the Standard). It is the responsibility of the user to make sure they are using the most recent revision. Signed drawings are on file in the Traffic Engineering Office. Drawing numbers and content change periodically.

A history of changes is available on the SMS Drawing Change List.

This page was last updated June 2014.


SeriesDrawing NumberDrawing NameDate
C
C-1 Sand Barrel Crash Cushion June 2014
C
C-2 Sand Barrel Crash Cushion Typical Installations June 2014
C
C-3 (1/2) Temporary Concrete Barrier June 2014
C
C-3 (2/2) Temporary Concrete Barrier June 2014
C
C-4 (1/2) Typical End Treatment For Detours Using Temporary Concrete Barrier (TCB) June 2014
C
C-4 (2/2) Typical End Treatment For Detours Using Temporary Concrete Barrier (TCB) June 2014
C
C-5 (1/2) Approach Plate Transition Section For Temporary Concrete Barrier June 2014
C
C-5 (2/2) Approach Plate Transition Section For Temporary Concrete Barrier June 2014
M
M-1 Curb Markings For Raised Median and Islands June 2014
M
M-2 (1/3) Intersection Striping June 2014
M
M-2 (2/3) Intersection Striping (Two-Lane Rural) June 2014
M
M-2 (3/3) Centerline Reverse Curve Details June 2014
M
M-3 Striping and Delineation for Freeway Terminals June 2014
M
M-4 Passing Lane Striping Details June 2014
M
M-5 Railroad Pavement Markings June 2014
M
M-6 Word Markings June 2014
M
M-7 Pavement Letters June 2014
M
M-8 Pavement Letters June 2014
M
M-9 Pavement Numbers June 2014
M
M-10 (1/2) Pavement Marking Symbols June 2014
M
M-10 (2/2) Pavement Marking Symbols June 2014
M
M-11 Turn Lane Pavement Markings June 2014
M
M-12 Wrong-Way Arrows June 2014
M
M-13 Preferential Lane Pavement Markings June 2014
M
M-14 Striping and Delineation for Truck Escape Ramps June 2014
M
M-15 (1/4) Pavement Marking for Freeway Entrance Ramp Tapered Acceleration Lane June 2014
M
M-15 (2/4) Pavement Marking For One-Lane Parallel Freeway Entrance Ramp June 2014
M
M-15 (3/4) Pavement Marking For Two-Lane Parallel Freeway Entrance Ramp June 2014
M
M-15 (4/4) Pavement Marking For Freeway Parallel Acceleration Lane June 2014
M
M-16 (1/2) Pavement Marking for Freeway Exit Ramp Tapered Deceleration Lane June 2014
M
M-16 (2/2) Pavement Marking for Freeway Exit Ramp Parallel Deceleration Lane June 2014
M
M-17 Freeway Lane Drop Pavement Markings June 2014
M
M-18 Recessed Pavement Markers Details June 2014
M
M-19 (1/9) Raised Pavement Marker Plan Legend June 2014
M
M-19 (2/9) Non-Reflective Raised Pavement Marker Details June 2014
M
M-19 (3/9) Retroreflective Raised Pavement Marker Details June 2014
M
M-19 (4/9) Retroreflective Raised Pavement Marker Details June 2014
M
M-19 (5/9) Pavement Marking Details for Undivided Highways June 2014
M
M-19 (6/9) Retroreflective Pavement Markers (RPM) For Undivided Highways June 2014
M
M-19 (7/9) Freeway And Divided Highway Edge Line And Lane Striping June 2014
M
M-19 (8/9) Lane Drop Marking And Ramp Or Intersection Guide Striping June 2014
M
M-19 (9/9) Pavement Marking Cross-Section Details For Highways And Freeways June 2014
M
M-20 (1/2) Chip Seal Marker Usage for Temporary Markings June 2014
M
M-20 (2/2) Chip Seal Marker Usage for Temporary Markings June 2014
M
M-21 Transverse Rumble Strip Details June 2014
M
M-22 (1/3) Longitudinal Rumble Strip Groove, Pattern and Location Details June 2014
M
M-22 (2/3) Longitudinal Rumble Strip Exception Details June 2014
M
M-22 (3/3) Centerline Rumble Strip Groove, Pattern, And Location Details June 2014
M
M-23 Object Marker Details June 2014
M
M-24 Object Marker Placement Details June 2014
M
M-26 (1/5) Delineator Placement and Spacing June 2014
M
M-26 (2/5) Delineator Placement and Spacing June 2014
M
M-26 (3/5) Flexible Delineator Assemblies June 2014
M
M-26 (4/5) Square Steel Post Delineator June 2014
M
M-26 (5/5) Delineator Foundation Details June 2014
M
M-27 Delineation Details for Median Crossovers June 2014
M
M-29 Off-Mainline Reference Marker Location Details June 2014
M
M-30 Off-Mainline Reference Marker Details June 2014
M
M-32 Bridge and Barrier Marker Details June 2014
M
M-33 Bridge and Barrier Marker Placement and Installation Details June 2014
M
M-34 Guardrail End Terminal Delineation Details June 2014
M
M-35 Object Marker for Sand Barrel Crash Cushion June 2014
S
S-1 General Signing Notes June 2014
S
S-2 (1/2) S & W Breakaway Post Selection Chart June 2014 
S
S-2 (2/2) S & W Breakaway Post Installation Details June 2014 
S
S-3 (1/16) Flat Sheet Signs Square Tube Post General Notes June 2014 
S
S-3 (2/16) Single Post Flat Sheet Rectangular Sign Assembly - 12, 18, and 24 Inch Widths June 2014 
S
S-3 (3/16) Single Post Flat Sheet Rectangular Sign Assembly - 30, 36, 42, and 54 Inch Widths June 2014 
S
S-3 (4/16) Two Post Flat Sheet Rectangular Sign Assembly - 36, 42, and 48 Inch Widths June 2014 
S
S-3 (5/16) Two Post Flat Sheet Rectangular Sign Assembly - 54, 60, and 72 Inch Widths June 2014
S
S-3 (6/16) Two Post Flat Sheet Rectangular Sign Assembly - 84-144 Inch Widths June 2014
S
S-3 (7/16) Three Post Flat Sheet Rectangular Sign Assembly - 48, 60, and 72 Inch Widths June 2014
S
S-3 (8/16) Three Post Flat Sheet Rectangular Sign Assembly - 84-144 Inch Widths June 2014
S
S-3 (9/16) Warning Sign Assembly - Single Post June 2014
S
S-3 (10/16) Warning Sign Assembly - Two Post June 2014
S
S-3 (11/16) Warning Sign Assembly - Three Post June 2014
S
S-3 (12/16) Multiple Route Marker Assemblies June 2014
S
S-3 (13/16) Special Sign Assemblies June 2014
S
S-3 (14/16) Stringer Details for Square Tube Posts June 2014
S
S-3 (15/16) Square Tube Sign Post Foundation June 2014
S
S-3 (16/16) Square Tube Post Slip Base Details June 2014
S
S-4 W Shape Breakaway Post Fuse Plate and Hinge Details June 2014
S
S-5 W Shape Breakaway Post Details June 2014
S
S-6 S4x7.7 Breakaway Post Details June 2014
S
S-7 (1/3) Aluminum Extrusion Sign Panel Details June 2014
S
S-7 (2/3) Aluminum Extrusion Auxiliary Sign Installation Details June 2014
S
S-7 (3/3) Aluminum Extrusion Exit Panel Installation Detail June 2014
S
S-8 (1/2) Flat Sheet Aluminum Panel on Breakaway Posts Installation Detail June 2014
S
S-8 (2/2) Aluminum Extrusion Sign to Perforated Posts Installation Detail June 2014
S
S-9 (1/3) Sign Installation on Pole June 2014
S
S-9 (2/3) Sign Installation on Signal Pole June 2014
S
S-9 (3/3) Sign Installation on Pole Band-Type Clamp June 2014
S
S-10 Milepost and Reference Location Signs June 2014
S
S-11 (1/4) Tapered Tube Sign Structure Cantilever June 2014
S
S-11 (2/4) Tapered Tube Sign Structure Cantilever Post and Mast Arm Details June 2014
S
S-11 (3/4) Tapered Tube Sign Structure Single Beam June 2014
S
S-11 (4/4) Tapered Tube Sign Structure Single Beam Post and Beam Details June 2014
S
S-12 (1/3) Type A, B, and Down Arrows June 2014
S
S-12 (2/3) Type C and D Arrows June 2014
S
S-12 (3/3) C2 Arrow Detail June 2014
S
S-13 Sign Identification Details June 2014
S
S-14 (1/3) Rotating Open / Closed Sign June 2014
S
S-14 (2/3) Rotating Open / Closed Sign Details June 2014
S
S-14 (3/3) Rotating Open/ Closed Sign Mounting Details June 2014
S
S-15 (1/3) Rectangular Folding Sign Assembly June 2014
S
S-15 (2/3) Rectangular Folding Sign Operation June 2014
S
S-15 (3/3) Diamond Folding Sign Assembly June 2014
S
S-16 (1/2) Temporary Wood Posts June 2014
S
S-16 (2/2) Temporary Wood Post Selection Chart June 2014
S
S-17 End of Road Barricade June 2014