Traffic

Signals and Lighting Standard Drawings

Historical

This page provides a PDF copy of the Traffic Engineering Signals and Lighting Historical Standard Drawings. The historical standard drawings are listed first by standard drawing number and then by date signed. The date signed references the date the standard became effective.


SeriesDrawing NumberDrawing NameRevision Date*
Notes 1 LIST OF COMMON NOTES 1 March 2004
Notes 2 LIST OF COMMON NOTES 2 March 2004
TOC
ETOC 1 Sheet # 1 January 2012
ETOC 2 Sheet # 2 January 2012
ETOC 3 Sheet # 3 January 2012
ETSLOGO
ETSLOGO COVER SHEET January 2012
ETSLOGO COVER SHEET March 2004
INDEX SHEETS
ETOC 1 Index Sheet # 1 March 2004
ETOC 2 Index Sheet # 2 March 2004
PLAN SYMBOLS
0-1 PLAN SYMBOLS March 2010
0-1 PLAN SYMBOLS March 2004
0-2 PLAN SYMBOLS March 2004
0-3 PLAN SYMBOLS March 2004
T.S. 1 T.S. 1 - PULL BOXES
1-1 No. 5 Concrete Pull Box March 2004
1-1 (1/2) Light Duty No. 5 and No. 7 Slope Wall Body Pull Box March 2010
1-1 (2/2) Light Duty No. 5 and No. 7 Slope Wall Body Pull Box Details March 2010
1-2 Heavy Duty No. 5 and No. 7 Straight Body Wall Pull Box Details March 2010
1-2 No. 5 Concrete Pull Box Extension March 2004
1-3 Replacement Lid Sizing for Existing No. 5 and No. 7 Pull Boxes March 2010
1-3 No. 7 Concrete Pull Box March 2004
1-4 No. 7 Concrete Pull Box Extension March 2004
1-4 (1/3) Typical Pull Box Installation and Wiring Details March 2010
1-4 (2/3) Typical Pull Box Installation and Wiring Details March 2010
1-4 (3/3) Typical Pull Box Installation Details March 2010
1-5 Polymer Pull Box March 2004
1-5 (1/2) Electrical Conduit Trench Requirements March 2010
1-5 (2/2) Conduit Expansion Couplings March 2010
1-6 Conductor Requirements March 2010
1-6 No. 9 Pull Box March 2004
1-7 No. 9 Pull Box Cover & Lift Handles March 2004
1-8 Typical Pull Box Installation and Wiring Details March 2004
1-8 (1/2) Front of Barrier Junction Box March 2010
1-8 (2/2) Back of Barrier Junction Box March 2010
1-9 Top of Barrier Junction Box Details March 2010
1-9 Barrier Junction Box March 2004
1-10 Top of Barrier Junction Box Details March 2010
1-11 (1/4) Heavy Duty Lighting No. 4 and No. 6 Pull Box September 2011
1-11 (2/4) Heavy Duty Lighting No. 4 and No. 6 Pull Box September 2011
1-11 (3/4) Heavy Duty Lighting No. 4 and No. 6 Pull Box September 2011
1-11 (4/4) Heavy Duty Lighting No. 4 and No. 6 Pull Box Lid September 2011
T.S. 2 T.S. 2 - FOUNDATIONS
2-1 Foundation for Type II Load Center Cabinet March 2004
2-2 Foundation for Type IV Load Center Cabinet March 2004
2-3 Foundation for Type III Control Cabinet March 2004
2-4 Foundation for Type IV, V Control Cabinets March 2004
2-5 Type A Foundation for 340 Controller Cabinets March 2004
2-6 Meter Pedestal Cabinet Foundation and Base March 2004
2-7 UPS Foundation Detail (New Std. Dwg.)(Added) September 2005
T.S. 3 T.S. 3 - CABINETS
3-0 Notes for Type II and IV Load Center Cabinets March 2010
3-1 Type II Load Center Cabinet March 2004
3-2 Type IV Load Center Cabinet March 2004
3-3 Type II Load Center Cabinet Wiring Details 120/240 3W March 2004
3-4 Type II Load Center Cabinet Wiring Details 240/480 3W /Disconnect March 2004
3-5 Type IV Load Center Cabinet Wiring Details 240/480 3W W/Disconnect March 2004
3-5 (2/2) Meter Pedestal Cabinet March 2010
3-6 Type III Control Cabinet March 2004
3-7 Pole Mount for Type III Control Cabinet March 2004
3-8 Pole Mount Details for Type III Control Cabinet March 2004
3-9 Type IV Control Cabinet March 2004
3-10 Type V Control Cabinet March 2004
3-11 Control Cabinet Mounted Service Enclosure May 2005
3-12 Jack Mounted Components March 2004
3-13 Meter Pedestal Cabinet March 2004
3-14 Elevator Base for Type IV Control Cabinet March 2004
3-15 Traffic Signals & Lighting Model 345 Cabinet Details March 2004
3-16 Traffic Signals & Lighting Model 345 Cabinet Cage Detail March 2004
3-17 125 AMP, 120/240 or 240/480 Volt, Single Phase Socket and Service Disconnect Details March 2004
3-18 125 AMP, 120/240 or 240/480 Volt, Single Phase Utility Pull Section and Service Disconnect Details March 2004
3-19 Meter Pedestal Cabinet Wiring Diagrams May 2005
T.S. 4 T.S. 4 - POLES & POSTS
4-1 Type A Pole March 2010
4-1 Type A Pole March 2004
4-2 Type E Pole and Mast Arm March 2010
4-2 Type "E" Pole and Mast Arm March 2004
4-3 Type F Pole and Mast Arms March 2010
4-3 Type "F" Pole and Mast Arms March 2004
4-4 Type G Pole and Mast Arms March 2010
4-4 Type "G" Pole and Mast Arms November 2004
4-5 Aluminum Type G Pole and Mast Arms March 2010
4-5 Aluminum Type "G" Pole and Mast Arms July 2004
4-6 Aluminum Type H Pole and Mast Arm March 2010
4-6 Aluminum Type "H" Pole and Mast Arm March 2004
4-7 Aluminum Type I Pole and Mast Arm March 2010
4-7 Aluminum Type "I" Pole and Mast Arm March 2004
4-8 Type J Pole and Mast Arm March 2010
4-8 Type "J" Pole and Mast Arm March 2004
4-9 Type "K" Pole March 2010
4-9 Type "K" Pole and Mast Arms September 2006
4-9 (1/2) Type "K" Pole and Mast Arms March 2009
4-9 (1/2) Type "K" Pole and Mast Arms October 2003
4-9 (2/2) Type "K-65" Pole and Mast Arms March 2009
4-10 Type Q Pole and Mast Arms March 2010
4-10 Type "Q" Pole and Mast Arms March 2004
4-11 Type "R" Pole March 2010
4-11 Type "R" Pole and Mast Arms December 2005
4-11 (1/2) Type "R" Pole and Mast Arms March 2009
4-11 (2/2) Type "R-65" Pole and Mast Arms March 2009
4-12 Type S Pole March 2010
4-12 Type "S" Pole March 2004
4-13 Aluminum Type S Pole March 2010
4-13 Aluminum Type "S" Pole March 2004
4-14 Type "T" Pole and Luminaire Mounting Bracket March 2004
4-14 (1/2) Type T Pole March 2010
4-14 (2/2) Type "S" and "T" Steel Twin Luminaire Mounting Bracket and Extensions March 2010
4-15 Aluminum Type T Pole March 2010
4-15 Aluminum Type "T" Pole March 2004
4-16 Type U Pole Elliptical Base and Details March 2010
4-16 Type "U" Pole Elliptical Base and Details March 2004
4-17 Type "U" Pole Round Base March 2004
4-17 (1/6) Type U Pole Round Base March 2010
4-17 (2/6) Type "U" Pole Round Pole / Square Base March 2010
4-17 (4/6) Type "U" Pole Round Pole / Square Base March 2010
4-17 (5/6) Type "U" Pole Round Pole / Square Base March 2010
4-17 (6/6) Type "U" Pole Round Pole / Square Base March 2010
4-18 Type U Pole Foundation Details March 2010
4-18 Type "U" Pole Foundation Details March 2004
4-19 Type U Pole Connection Details March 2010
4-19 Type "U" Pole Connection Details March 2004
4-20 Pole Hand Hole Detail March 2004
4-21 Pole Drilling Detail March 2004
4-22 Pedestrian Push Button Post December 2012
4-22 Pedestrian Push Button Post March 2004
4-23 Anchor Bolts March 2010
4-23 Anchor Bolts July 2004
4-32 Typical Highway Lighting Offsets in Cut and Fill Sections March 2010
T.S. 5 T.S. 5 - POLE BASES - SPECIAL
5-0 Type 2 and 3 Cast Aluminum Break-Away Bases March 2010
5-1 Type 2 Breakaway Base for 30 Foot Pole March 2010
5-1 Type 2 Breakaway Base for 30 Foot Pole September 2004
5-2 Type 3 Breakaway Base for 40 Foot Pole and Above March 2010
5-2 Type 3 Breakaway Base for 40 Foot Pole and Above September 2004
5-3 Installation Details for Pole Foundations with Type 2 and 3 Break-Away Bases March 2010
T.S. 6 T.S. 6 - LIGHTING POLE OFFSETS / HIGHWAY TRAFFIC DATA DETECTORS
6-1 Highway Lighting Offsets in Cut and Fill Sections March 2004
6-3 Piezoelectric Weight Sensor and Loop Lane Layout March 2010
6-4 (1/5) Detector Loops and Piezoelectric Sensor Details March 2010
6-4 (2/5) Detector Loops and Piezoelectric Sensor Details March 2010
6-4 (3/5) Detail A Piezoelectric Sensor Details March 2010
6-4 (4/5) Detail B Detector Loop Details March 2010
6-4 (5/5) Detector Loops and Piezoelectric Sensor Details March 2010
T.S. 7 T.S. 7 - DETECTORS
7-1 Loop Detector Location and Installation Details March 2004
7-2 Detector Loops for Traffic Counters November 2009
7-3 (1/3) Detector Loops for Speed/Vehicle Class November 2009
7-3 (2/2) Detector Loops for Speed/Vehicle Class November 2009
7-4 ATR Cabinet Detail November 2009
7-5 Pre-Formed Loop Detectors for FMS/Ramp Metering/Count March 2004
7-6 Pre-Formed Loop Detectors in Bridge March 2004
7-7 Pre-Formed Loop Detectors in PCCP March 2004
7-8 Pre-Formed Loop Detectors Stub-Out Detail March 2004
7-9 Microloops for Speed/Vehicle Class December 2008
7-10 (1/3) Piezoelectric Weight Sensor and Loop Lane Layout March 2009
7-10 (2/3) Piezoelectric Weight Sensor and Loop Lane Layout March 2009
7-10 (3/3) Piezoelectric Weight Sensor and Loop Lane Layout March 2009
7-11 (1/2) Quartz Piezoelectric Weight Sensor and Loop Lane Layout December 2008
7-11 (1/2) Quartz Piezoelectric Weight Sensor and Loop Lane Layout December 2008
T.S. 8 T.S. 8 - SIGNAL ASSEMBLIES
8-1 Signal Faces with Backplates March 2004
8-2 Signal Faces with Backplates March 2004
8-3 Signal Faces with Backplates March 2004
8-4 Visors for 8 and 12 Signals March 2004
8-4 (1/4) 12-Inch Vehicle Traffic Signal Housing/Section March 2010
T.S. 9 T.S. 9 - MOUNTING ASSEMBLIES - SIGNAL
9-1 Type I & II Mounting Assemblies March 2004
9-2 Type III & IV Mounting Assemblies March 2004
9-3 Type V Mounting Assembly March 2010
9-3 Type V Mounting Assembly March 2004
9-4 Type VI Mounting Assembly March 2004
9-5 Type VII Mounting Assembly March 2004
9-6 Type VIII Mounting Assembly March 2004
9-7 Type IX Mounting Assembly March 2004
9-8 Type X Mounting Assembly March 2004
9-9 Type XI Mounting Assembly March 2004
T.S. 10 T.S. 10 - MOUNTING CASTINGS - SIGNAL
10-1 Miscellaneous Signal Mounting Parts March 2004
10-2 Mast Arm Plumbizer March 2004
10-3 Pole Plate Detail March 2004
10-4 Terminal Compartment, Side Mounted and Pole top Mounted March 2004
T.S. 11 T.S. 11 - PEDESTRIAN DETAILS
11-1 Type I Pedestrian Push Button March 2004
11-2 Type II Pedestrian Push Button March 2004
11-3 Signs for Pedestrian Push Buttons March 2004
11-4 Signs for International Symbol Push Button March 2004
T.S. 12 T.S. 12 - FLASHERS
12-1 Advance Warning Flasher Pole Detail March 2004
T.S. 13 T.S. 13 - ILLUMINATION - SIGNS
13-1 Sign Lighting Detail for Tubular Sign Structures November 2004
13-2 Sign Lighting Details for Truss Type Signs November 2004
13-3 Fuse Panel Details for Sign Lighting November 2004
13-4 Sign Lighting Detail for Median Mtg. Sign November 2004
13-5 Placement of Lighting Fixtures for Overhead Signs November 2004
T.S. 14 T.S. 14 - ILLUMINATION - SPECIAL
14-1 Pedestrian Bridge Lighting Details March 2004
14-2 Pedestrian Bridge Lighting Details March 2004
T.S. 15 T.S. 15 - SERVICE
15-1 Photo Electric Cell Mounting Details March 2004
15-2 Temp. Signals & Lighting Typ. Span Wire Details March 2004