Roadway Engineering

Roadway Standards and Guidelines

Construction Standard Drawings

Current Design Construction Standard Drawings

The current Roadway Design Construction Standard Drawings listed below should be used in conjunction with the Roadway Design Memorandums, Roadway Design Guidelines and Guardrail, Barrier and Transition Design Information.

It is the responsibility of users to make sure they are using current design standards

Current Roadway Design Construction Standard Drawings

The Construction Standards Index Sheets are available on the Roadway CADD Standards page under the Construction Standards Index Sheets: 1A, 1B, 1C and 1D section.

Combined set of current Standard Drawings

Drawing Number Drawing Name Revision Date
C-01.10, Sht. 1 Symbol Legend, 1 of 4 May, 2012
C-01.10, Sht. 2 Symbol Legend, 2 of 4 May, 2012
C-01.10, Sht. 3 Symbol Legend, 3 of 4 May, 2012
C-01.10, Sht. 4 Symbol Legend, 4 of 4 May, 2012
C-01.30, Sht. 1 General Abbreviations, 1 of 3 May, 2012
C-01.30, Sht. 2 General Abbreviations, 2 of 3 May, 2012
C-01.30, Sht. 3 General Abbreviations, 3 of 3 May, 2012
C-02.10 Slopes, Rural Divided Highways May, 2012
C-02.20 Slopes, Rural Undivided And Fringe-Urban Highways May, 2012
C-02.30 Slopes, Miscellaneous Roadways May, 2012
C-03.10, Sht. 1 Ditches, Channels, Dikes And Berms, Ditches And Channels, 1 of 5 May, 2012
C-03.10, Sht. 2 Ditches, Channels, Dikes And Berms, Ditches And Channels, 2 of 5 May, 2012
C-03.10, Sht. 3 Ditches, Channels, Dikes And Berms, Ditches And Channels, 3 of 5 May, 2012
C-03.10, Sht. 4 Ditches, Channels, Dikes And Berms, Ditches And Channels, 4 of 5 May, 2012
C-03.10, Sht. 5 Ditches, Channels, Dikes And Berms, Ditches And Channels, 5 of 5 May, 2012
C-04.10, Sht. 1 Spillway, Embankment, Single Inlet, 1 of 2 May, 2012
C-04.10, Sht. 2 Spillway, Embankment, Single Inlet, 2 of 2 May, 2012
C-04.20, Sht. 1 Downdrain, Embankment, Single Inlet, 1 of 2 May, 2012
C-04.20, Sht. 2 Downdrain, Embankment, Single Inlet, 2 of 2 May, 2012
C-04.30 Spillway Length Table May, 2012
C-04.40 Downdrain Length Table May, 2012
C-04.50 Downdrain Energy Dissipator May, 2012
C-05.10 Curb & Gutter, Curb, Gutter May, 2012
C-05.12, Sht. 1 Curb & Gutter Transitions, 1 of 3 May, 2012
C-05.12, Sht. 2 Curb & Gutter Transitions, 2 of 3 May, 2012
C-05.12, Sht. 3 Curb & Gutter Transitions, 3 of 3 May, 2012
C-05.20, Sht. 1 Concrete Driveways & Sidewalks, Driveways, 1 of 2 May, 2012
C-05.20, Sht. 2 Concrete Driveways & Sidewalks, Driveways, 2 of 2 May, 2012
C-05.30, Sht. 1 Sidewalk Ramp, Type A, 1 of 7 May, 2012
C-05.30, Sht. 2 Sidewalk Ramp, Type B, 2 of 7 May, 2012
C-05.30, Sht. 3 Sidewalk Ramp, Type C, 3 of 7 May, 2012
C-05.30, Sht. 4 Sidewalk Ramp, Type D, 4 of 7 May, 2012
C-05.30, Sht. 5 Sidewalk Ramp, Type E, 5 of 7 May, 2012
C-05.30, Sht. 6 Sidewalk Ramp, Type F, 6 of 7 May, 2012
C-05.30, Sht. 7 Sidewalk Ramp, Detectable Warning Strip, 7 of 7 May, 2012
C-05.40 Median Paving And Nose  May, 2012
C-05.50 Concrete Bus Bay  May, 2012
C-06.10, Sht. 1 Driveway & Turnout Layouts, 1 of 2 May, 2012
C-06.10, Sht. 2 Driveway & Turnout Layouts, 2 of 2 May, 2012
C-07.01, Sht. 1  PCCP Joints, 1 of 2 May, 2012
C-07.01, Sht. 2  PCCP Joints, 2 of 2 May, 2012
C-07.02 Load Transfer Dowel Assembly May, 2012
C-07.03, Sht. 1 PCCP Joint Locations, Mainline Skewed Joints, 1 of 8 May, 2012
C-07.03, Sht. 2 PCCP Joint Locations, Mainline Skewed Joints, 2 of 8 May, 2012
C-07.03, Sht. 3 PCCP Joint Locations, Mainline Skewed Joints, 3 of 8 May, 2012
C-07.03, Sht. 4 PCCP Joint Locations, Mainline Skewed Joints, 4 of 8 May, 2012
C-07.03, Sht. 5 PCCP Joint Locations, Mainline Non-Skewed Joints, 5 of 8 May, 2012
C-07.03, Sht. 6 PCCP Joint Locations, Mainline Non-Skewed Joints, 6 of 8 May, 2012
C-07.03, Sht. 7 PCCP Joint Locations, Mainline Non-Skewed Joints, 7 of 8 May, 2012
C-07.03, Sht. 8 PCCP Joint Locations, Mainline Non-Skewed Joints, 8 of 8 May, 2012
C-07.04, Sht. 1 PCCP Joint Locations, Parallel-Type Entrance Ramp With Auxiliary Lane May, 2012
C-07.04, Sht. 2 PCCP Joint Locations, Parallel-Type Exit Ramp With Auxiliary Lane May, 2012
C-07.04, Sht. 3 PCCP Joint Locations, Taper-Type Entrance Ramp May, 2012
C-07.04, Sht. 4 PCCP Joint Locations, Taper-Type Exit Ramp May, 2012
C-07.04, Sht. 5 PCCP Joint Locations, Crossroad And Ramp Termini May, 2012
C-07.06 Trench Backfill And Pavement Replacement May, 2012
C-08.20 Paved Gore Area May, 2012
C-10.00 Guardrail Measurement Limits May, 2012
C-10.01 Guardrail Installation, Type A And Reflector Tab May, 2012
C-10.02 Guardrail Installation, Type B And Reflector Tab May, 2012
C-10.03 W-Beam Guardrail, G4(1W) And G4(2W) Blocked-Out Timber Post May, 2012
C-10.04 W-Beam Guardrail, G4(1S) Blocked-Out Steel Post May, 2012
C-10.05, Sht. 1 W-Beam Guardrail, G4(Modified) With Freeway Curb And Gutter May, 2012
C-10.05, Sht. 2 W-Beam Guardrail, G4(Modified) With Freeway Curb And Gutter May, 2012
C-10.06, Sht. 1 W-Beam Guardrail, Nested, Types 1 And 2 May, 2012
C-10.06, Sht. 2 W-Beam Guardrail, Nested, Type 3 May, 2012
C-10.07, Sht. 1 W-Beam Guardrail, Bolted Anchor May, 2012
C-10.07, Sht. 2 W-Beam Guardrail, Bolted Anchor May, 2012
C-10.08 W-Beam Guardrail, End Anchor May, 2012
C-10.20 Thrie-Beam Guardrail, G9, Blocked-Out Steel Post May, 2012
C-10.30, Sht. 1 Guardrail Transitions, Thrie Beam To Concrete Half Barrier, 32" Type 'F' May, 2012
C-10.30, Sht. 2 Guardrail Transitions, Thrie Beam To Concrete Half Barrier, 32" Type 'F' May, 2012
C-10.40 Concrete Median Barrier, 32" Type 'F', Cast-In-Place May, 2012
C-10.41 Concrete Median Barrier, 42" Type 'F', Cast-In-Place May, 2012
C-10.42, Sht. 1 Glare Screen, Concrete Median Barrier May, 2012
C-10.42, Sht. 2 Glare Screen, Concrete Median Barrier May, 2012
C-10.42, Sht. 3 Glare Screen, Concrete Median Barrier May, 2012
C-10.50, Sht. 1 Concrete Half Barrier, 32" Type 'F', Cast-In-Place May, 2012
C-10.50, Sht. 2 Concrete Half Barrier, 32" Type 'F', Precast May, 2012
C-10.51 Concrete Half Barrier, 32" Type 'F' With Sidewalk May, 2012
C-10.52 Concrete Half Barrier, 32" Type 'F' With Gutter May, 2012
C-10.53 Concrete Half Barrier, 42" Type 'F' With Gutter May, 2012
C-10.54, Sht. 1 Concrete Half Barrier, 32" Type 'F' At Piers, Cast-In-Place May, 2012
C-10.54, Sht. 2 Concrete Half Barrier, 32" Type 'F' At Piers, Precast May, 2012
C-10.54, Sht. 3 Concrete Half Barrier, 32" Type 'F' At Piers, Layout May, 2012
C-10.55, Sht. 1 Concrete Half Barrier, 42" Type 'F' At Piers, Cast-In-Place May, 2012
C-10.55, Sht. 2 Concrete Half Barrier, 42" Type 'F' At Piers, Precast May, 2012
C-10.55, Sht. 3 Concrete Half Barrier, 42" Type 'F' At Piers, Layout May, 2012
C-10.70, Sht. 1 Concrete Half-Barrier Transition To Vertical, 32" Type 'F' With Caissons May, 2012
C-10.70, Sht. 2 Concrete Half-Barrier Transition To Vertical, 32" Type 'F' With Caissons May, 2012
C-10.70, Sht. 3 Concrete Half-Barrier Transition To Vertical, 32" Type 'F' With Caissons May, 2012
C-10.71, Sht. 1 Concrete Half-Barrier Transition To Vertical, 32" Type 'F' With Curb & Gutter May, 2012
C-10.71, Sht. 2 Concrete Half-Barrier Transition To Vertical, 32" Type 'F' With Curb & Gutter May, 2012
C-10.72, Sht. 1 Concrete Half-Barrier Transition, 42" To 32" Type 'F' With Caissons May, 2012
C-10.72, Sht. 2 Concrete Half-Barrier Transition To Vertical, 42" To 32" Type 'F' With Caissons May, 2012
C-10.72, Sht. 3 Concrete Half-Barrier Transition To Vertical, 42" To 32" Type 'F' With Caissons May, 2012
C-10.73, Sht. 1 Concrete Half-Barrier Transition To Vertical, 42" Type 'F' With Gutter May, 2012
C-10.73, Sht. 2 Concrete Half-Barrier Transition To Vertical, 42" Type 'F' With Gutter May, 2012
C-10.74 Concrete Half-Barrier Transition, 42" To 32" Type 'F' May, 2012
C-10.75, Sht. 1 Concrete Half-Barrier Transition, Type 'F', Tangent Departure Type 1 May, 2012
C-10.75, Sht. 2 Concrete Half-Barrier Transition, Type 'F', Tangent Departure Type 2 May, 2012
C-10.76 Concrete Half-Barrier Transition, Type 'F' At Radius, 32" To 0" May, 2012
C-10.77 Concrete Half-Barrier Transition, End Terminal, Curb And Gutter May, 2012
C-11.10, Sht. 1 Roadway Cattle Guard May, 2012
C-11.10, Sht. 2 Roadway Cattle Guard May, 2012
C-11.10, Sht. 3 Roadway Cattle Guard May, 2012
C-11.10, Sht. 4 Roadway Cattle Guard May, 2012
C-11.20 Cattle Guard, Drainage May, 2012
C-12.10, Sht. 1 Fence, Woven Wire May, 2012
C-12.10, Sht. 2 Fence, Barbed Wire May, 2012
C-12.10, Sht. 3 Fence, Type 1 And 2 Gates, Flood Gate May, 2012
C-12.10, Sht. 4 Fence, Flood Gate Installation May, 2012
C-12.10, Sht. 5 Fence, Miscellaneous Details May, 2012
C-12.20, Sht. 1 Fence, Chain Link, Type 1  May, 2012
C-12.20, Sht. 2 Fence, Chain Link, Type 2  May, 2012
C-12.20, Sht. 3 Fence, Chain Link, Gates   May, 2012
C-12.30, Sht. 1 Fence, Chain Link Cable Barrier  May, 2012
C-12.30, Sht. 2 Fence, Chain Link Cable Barrier  May, 2012
C-12.30, Sht. 3 Fence, Chain Link Cable Barrier  May, 2012
C-13.10, Sht. 1 Pipe Culvert Installation  May, 2012
C-13.10, Sht. 2 Pipe Culvert Installation  May, 2012
C-13.15 Typical Pipe Installation  May, 2012
C-13.20 Pipe, Reinforced Concrete End Section  May, 2012
C-13.25 Pipe, Corrugated Metal End Section  May, 2012
C-13.30 Pipe And Pipe Arch, Corrugated Metal, Concrete Invert Paving  May, 2012
C-13.55 Pipe, Cattle/Vehicle Pass, Mitered End Treatment  May, 2012
C-13.60 Slotted Drain Details  May, 2012
C-13.65 Slotted Drain Installation Details  May, 2012
C-13.70 Storm Drain Connection Details  May, 2012
C-13.75 Storm Drain Outlet Barrier Gate   May, 2012
C-13.76 Storm Drain Outlet And Storm Drain Plug  May, 2012
C-13.80 Pipe Collar Details  May, 2012
C-15.10 Catch Basin, Type 1  May, 2012
C-15.20, Sht. 1 Catch Basin, Type 3  May, 2012
C-15.20, Sht. 2 Catch Basin, Type 3  May, 2012
C-15.20, Sht. 3 Catch Basin Access Frame And Cover Details  May, 2012
C-15.30 Catch Basin, Type 4  May, 2012
C-15.40, Sht. 1 Catch Basin, Type 5  May, 2012
C-15.40, Sht. 2 Catch Basin, Type 5  May, 2012
C-15.50 Catch Basin, Frame And Grate  May, 2012
C-15.70, Sht. 1 Catch Basin, Miscellaneous Details  May, 2012
C-15.70, Sht. 2 Catch Basin, Miscellaneous Details  May, 2012
C-15.75 Catch Basin, Drop Inlet  May, 2012
C-15.80 Catch Basin, Flush  May, 2012
C-15.81 Catch Basin, Side Slope  May, 2012
C-15.90 Catch Basin, Median Dike, Precast  May, 2012
C-15.91, Sht. 1 Freeway Catch Basin Details  May, 2012
C-15.91, Sht. 2 Freeway Catch Basin Details  May, 2012
C-15.92, Sht. 1 Catch Basin With Type 'F' Concrete Half Barrier  May, 2012
C-15.92, Sht. 2 Catch Basin With Type 'F' Concrete Half Barrier  May, 2012
C-16.40 Irrigation Sleeves  May, 2012
C-17.10 Rail Bank Protection For Drainageways, Types 1, 2 & 3  May, 2012
C-17.15 Rail Bank Protection At Abutments, Types 4, 5 & 6  May, 2012
C-17.20 Rail Bank Protection For Drainageways, Types 7, 8 & 9  May, 2012
C-18.10, Sht. 1 Manhole Riser  May, 2012
C-18.10, Sht. 2 Manhole Base Details, Normal Installation   May, 2012
C-18.10, Sht. 3 Manhole Frame And Cover Details   May, 2012
C-19.10, Sht. 1 Ford Concrete Walls  May, 2012
C-19.10, Sht. 2 Ford, Types 1 And 2  May, 2012
C-21.10 Survey Monument Frame And Cover  May, 2012
C-21.20 Survey Marker  May, 2012

Change List

Updates to the Construction Standard Drawings

  • May 2012 Updated the following drawings:
  • C-01.10, Sheet 3 of 4,
  • C-01.10, Sheet 4 of 4,
  • C-01.30, Sheet 3 of 3,
  • C-03.10, Sheet 5 of 5,
  • C-04.10, Sheet 2 of 2,
  • C-04.20, Sheet 1 of 2,
  • C-04.20, Sheet 2 of 2,
  • C-05.10,
  • C-05.12,
  • C-05.12,
  • C-05.12, Sheet 3 of 3,
  • C-05.30,
  • C-07.01,
  • C-10.05,
  • C-10.20,
  • C-10.40,
  • C-10.41,
  • C-10.50,
  • C-10.55,
  • C-10.77,
  • C-12.10,
  • C-12.10,
  • C-12.10,
  • C-12.10,
  • C-12.10,
  • C-12.20,
  • C-12.20,
  • C-12.20, Sheet 3 of 3,
  • C-15.91, Sheet 1 of 2,
  • C-15.91, Sheet 2 of 2,
  • C-17.10,
  • C-17.15,
  • C-17.20,
  • C-18.10, Sheet 3 of 3.
  • Updates to the May, 2007 Construction Standard Drawings
  • Date Revised: Drawing(s) Revised:
  • November 1, 2007 Revised Standard Drawings C-07.02, C-21.10 and C-21.20.
  • November 2, 2009Revised Standard Drawings C-10.06, Sheets 1 and 2 of 2.
  • April 14, 2010Revised Standard Drawing C-02.30.
  • May 24, 2010Revised Standard Drawing C-07.04, Sheet 5 of 5.
  • May 24, 2010Revised Standard Drawing C-08.20.

Historical Construction Standard Drawing Memos

2007
2006
2005
2004
Civil RightsTitle VI of the Civil Rights Act of 1964, and the Americans with Disabilities Act (ADA)

Pursuant to Title VI of the Civil Rights Act of 1964, and the Americans with Disabilities Act (ADA), ADOT does not discriminate on the basis of race, color, national origin, age, sex or disability. Persons that require a reasonable accommodation based on language or disability should contact ADOT’s Civil Rights Office at [email protected]. Requests should be made as early as possible to ensure the State has an opportunity to address the accommodation.

De acuerdo con el título VI de la Ley de Derechos Civiles de 1964 y la Ley de Estadounidenses con Discapacidades (ADA por sus siglas en inglés), el Departamento de Transporte de Arizona (ADOT por sus siglas en inglés) no discrimina por raza, color, nacionalidad, edad, género o discapacidad.  Personas que requieren asistencia (dentro de lo razonable) ya sea por el idioma o por discapacidad deben ponerse en contacto con la Oficina de Derechos Civiles en [email protected]. Las solicitudes deben hacerse lo más pronto posible para asegurar que el equipo encargado del proyecto tenga la oportunidad de hacer los arreglos necesarios.