![]() |
Project Managers Report |
| PPMS - List of Projects |
|
|
| RT | CO | MP | TRACS | D | PROJNAME | CPSID | TYPE OF WORK | PM | BID READY | BID ADV |
|---|---|---|---|---|---|---|---|---|---|---|
| 8 | YU | 0.0 | H852301D | Y | YUMA PORT OF ENTRY | XT1L | PE PH2 |
MICHAEL DENBLEYKER
602-712-7808 |
Design | Design |
| 8 | YU | 1.0 | H8619CAX | Y | WB OFF RAMP & GISS PARKWAY INTERS | BM1M | INTERSECTION IMPROVEMENTS |
PAUL PATANE
928-317-2115 |
05/01/2014 | 6/2/2014 |
| 8 | YU | 2.0 | Y | 16TH STREET | BN1M | LANDSCAPING |
PAUL PATANE
928-317-2115 |
05/30/2014 | 6/30/2014 | |
| 8 | YU | 7.2 | H810201D | Y | I-8: ARABY ROAD TI RECONSTRUCTIO | HJ1J | DESIGN |
BILLAH KHAN
602-712/8486 |
Design | Design |
| 8 | YU | 13.7 | H815801C | Y | FOOTHILLS BLVD - DOME VALLEY | SV1K | RR (5" TL, 3" PL) & FR |
HALDUN GUVENEN
602-712-7725 |
10/01/2013 | 11/1/2013 |
| 8 | YU | 55.9 | H206001C | Y | MOHAWK REST AREA | FR1C | CONSTRUCT REST AREA |
MICHAEL DENBLEYKER
602-712-7808 |
TBD | TBD |
| 8 | MA | 117.0 | H800001C | Y | I-8 TO GILLESPIE CANAL | KJ1K | REMOVE 3", REPLACE 2.5" & ACFC |
HIREN SHAH
602-712-7794 |
05/28/2013 | 6/14/2013 |
| 8 | YU | 125.0 | H8557CAX | Y | GILA BEND TO I-10 | YG1L | SIGN REHABILITATION |
SUMERA KAYANI
602-712-8527 |
Design | Design |
| 8 | PN | 163.0 | H827001C | T | SANTA ROSA WASH BRIDGES, STR # 10 | CG1L | SCOUR RETROFIT |
MAHMUD HASAN
602-712-6908 |
12/02/2013 | 1/6/2014 |
| 8 | PN | 170.0 | H8171S1D | T | BIANCO ROAD - JCT I-10 | TI1K | RR(5" TL, 3" PL) & AR-ACFC |
QUINN FAROL
602-712-8789 |
10/15/2013 | 11/13/2013 |
| 8 | PN | 172.0 | H8631CAX | T | THORNTON RD TI UP #1196 | JX1M | DESIGN |
DAVID BENTON
602-712-6908 |
Design | Design |
| 10 | MA | 0.0 | E | SKY HARBOR WEST AIRPORT ACCESS | WU1K | CONSTRUCT ACCESS RAMPS |
STEVE BEASLEY
602-712-7645 |
TBD | TBD | |
| 10 | LA | 0.1 | H798701C | Y | I-10 (NORTH SIDE), MP 0.1 - 0.3, | MM1K | DESIGN OF SHARED-USE PATH (SUP) AND FENCING |
GREGORY JOHNSON
602-712-7774 |
TBD | TBD |
| 10 | LA | 1.0 | H800801D | Y | I-10 @ POSTON RD IN EHRENBERG | HC1J | ROUNDABOUT |
ISABELL GARCIA
928-317-2159 |
08/28/2013 | 9/16/2013 |
| 10 | LA | 3 | H616101C | Y | EHRENBERG PORT OF ENTRY | NN1F | RECONSTRUCT EB PORT OF ENTRY |
MICHAEL DENBLEYKER
602-712-7808 |
TBD | TBD |
| 10 | LA | 17.5 | H851701D | Y | I-10 WEST QUARTZSITE TI | XP1L | INTERSECTION IMPROVEMENTS |
PAUL PATANE
928-317-2115 |
TBD | TBD |
| 10 | LA | 42.0 | H851101L | Y | MP 42 TO HOVATTER ROAD | BA1M | RR(4" TL, 3" PL) + AR-ACFC |
ASADUL KARIM
602-712-6799 |
TBD | TBD |
| 10 | LA | 47.0 | H862001C | Y | I-10 BOUSE WASH SECTION - DIKE RE | JO1M | SYSTEM ENHANCEMENT- SAFETY IMPROVEMENT |
JEFFREY MILES
602-712-8336 |
TBD | TBD |
| 10 | MA | 80.0 | H863801C | Y | SALOME ROAD TO SR 85 | JV1M | PAVEMENT PRESERVATION (CRACK SEALING) |
KEVIN ROBERTSON
602-712-3131 |
Design | Design |
| 10 | MA | 105.0 | H775001C | E | SR 85 TO DYSART (VERRADO WAY TO 8 | VX1J | SIGN REHABILITATION |
TOM TORTICE
602-712-7995 |
06/03/2013 | 7/1/2013 |
| 10 | MA | 112.8 | H832701L | E | SR 85 - VERRADO (EB) | IP1L | RR(4"TL, 3" PL) & AR-ACFC |
JULIA MENDOZA
602-712-8060 |
02/13/2014 | 3/5/2014 |
| 10 | MA | 122.0 | H770901C | E | PERRYVILLE ROAD TI | CM1J | CONSTRUCT TI |
ERIC PROSNIER
602-712-8495 |
04/29/2013 A | 5/13/2013 |
| 10 | MA | 129.5 | H847801D | E | DYSART ROAD TO SR 101L (AUGA FRIA | UU1L | LANDSCAPE CONSTRUCTION |
OWEN MILLS
602-712-8695 |
04/29/2013 A | 5/7/2013 |
| 10 | MA | 130.0 | H864201D | E | DYSART TO 83RD AVE | EK1M | DESIGN & CONSTRUCT FMS |
JAMES MARINO
602-712-7803 |
TBD | TBD |
| 10 | MA | 133.0 | H715501C | E | SR 101L (AGUA FRIA) TO I-17 | GH1H | DESIGN UTILITY RELOCATION |
OWEN MILLS
602-712-8695 |
Design | Design |
| 10 | MA | 135.0 | H864601D | E | I-10 WEST AT 67TH AVENUE | NR1M | DESIGN NOISE WALL |
ERIC PROSNIER
602-712-8495 |
Design | Design |
| 10 | MA | 141.7 | HS01301D | E | 35TH AVE - SKY HARBOR BLVD | NH1M | SAFETY STUDY |
OWEN MILLS
602-712-8695 |
Design | Design |
| 10 | MA | 144.9 | H834401D | E | 3RD AVENUE TO 3RD STREET, DECK PA | YD1L | DRAINAGE IMPROVEMENTS |
MONICA BAIZA
602-712-4711 |
TBD | TBD |
| 10 | MA | 145.0 | E | 3RD AVENUE TO 3RD STREET | BR1M | PUMP STATION IMPROVEMENTS |
STEVE BEASLEY
602-712-7645 |
TBD | TBD | |
| 10 | MA | 151.5 | E | 32ND ST - SR202L, SANTAN PHASE 1 | WR1K | CONSTRUCT LOCAL EXPRESS LANES |
STEVE BEASLEY
602-712-7645 |
Design | Design | |
| 10 | MA | 161.2 | H505101C | E | SR 202L (SANTAN) TO RIGGS ROAD | FX1C | CONST HOV & GEN PURPOSE LANE |
DAVID EBERHART
602-712-7196 |
TBD | TBD |
| 10 | MA | 162.0 | H819201D | E | WILD HORSE PASS TO SR 347 (QUEEN | FY1L | ROADWAY WIDENING |
AMY RITZ
602-712-4691 |
TBD | TBD |
| 10 | MA | 164.0 | E | WILD HORSE PASS - RIGGS | BT1M | RR(5" TL - 3" PL) + AR-ACFC |
STEVE BEASLEY
602-712-7645 |
TBD | TBD | |
| 10 | PN | 186.7 | H798401D | T | EARLEY ROAD TO JCT I-8 | JW1K | ROAD WIDENING |
OWEN MILLS
602-712-8695 |
TBD | TBD |
| 10 | PN | 208.8 | H769601C | T | SR 87 TI TO TOWN OF PICACHO | SX1J | CAPACITY ADDITIONS - ENGINEERING |
OWEN MILLS
602-712-8695 |
TBD | TBD |
| 10 | PN | 209.9 | H861401C | T | LA PALMA RD TO PICACHO HWY | HB1M | DESIGN PAVEMENTPRESERVATION PROJECT |
KEVIN ROBERTSON
602-712-3131 |
Design | Design |
| 10 | PM | 236.0 | HX25201D | T | I-10 AT MARANA RD, EXIT 236 | PB1M | STUDY |
ABDULKARIM RASHID
602-712-7602 |
Design | Design |
| 10 | PM | 236.4 | T | MARANA ROAD TO CORTARO ROAD | CO1J | DESIGN (RECONSTRUCT & WIDEN FRONTAGE ROADS) |
ROBIN RAINE
520-388-4264 |
Design | Design | |
| 10 | PM | 247.0 | H758301C | T | INA RD TO RUTHRAUFF RD | QL1J | RECONSTRUCTION FOR WIDENING |
DAVID EBERHART
602-712-7196 |
TBD | TBD |
| 10 | PM | 248.0 | H8479CAX | T | INA ROAD TI | PJ1F | RECONSTRUCT TI & MAINLINE |
STEPHEN WILSON
520-388-4263 |
TBD | TBD |
| 10 | PM | 252.0 | H848001D | T | RUTHRAFF ROAD TI | VH1L | RECONSTRUCTION FOR WIDENING |
DAVID EBERHART
602-712-7196 |
TBD | TBD |
| 10 | PM | 260.3 | H782501L | T | JCT I-19 TO SR90 | AY1K | DCR AND EA |
DAVID BRAUER
520-388-4263 |
Design | Design |
| 10 | PM | 264.0 | T | COUNTRY CLUB ROAD TI | CQ1J | DESIGN TRAFFIC INTERCHANGE (PE PH 1) |
ROBIN RAINE
520-388-4264 |
Design | Design | |
| 10 | PM | 268.0 | HX24901C | T | I-10 AT CRAYCROFT ROAD TI IN TUCS | II1M | DESIGN |
ABDULKARIM RASHID
602-712-7602 |
Design | Design |
| 10 | PM | 268.0 | H855601D | T | I-19 TO CRAYCROFT ROAD IN TUCSON | AZ1M | SIGN REHABILITATION |
ABDULKARIM RASHID
602-712-7602 |
07/01/2013 | 8/30/2013 |
| 10 | PM | 284.4 | H8411B1D | T | DAVIDSON CANYON WB BRIDGE, STR #5 | NA1L | SUPERSTRUCTURE REPLACEMENT |
DAVID BENTON
602-712-6908 |
TBD | TBD |
| 10 | PM | 291.7 | H805201C | T | MARSH STATION - COUNTY LINE | NB1K | MILL AND REPLACE |
STEVE MISHLER
602-712-8678 |
10/18/2013 | 11/15/2013 |
| 10 | CH | 296.0 | T | MESCAL ROAD TO JCT SR 90 | BU1M | RR(5" TL, 3" PL) + AR-ACFC |
STEPHEN WILSON
520-388-4263 |
TBD | TBD | |
| 10 | CH | 306.7 | H8442B1D | S | SAN PEDRO RIVER BRIDGE EB #1530 & | WD1L | DECK REPLACEMENT & SCOUR RETROFIT |
PE-SHEN YANG
602-712-8606 |
TBD | TBD |
| 10 | CH | 309.0 | H854501D | S | ADAMS PEAK WASH BRIDGES EB & WB # | ZF1L | DESIGN |
NICHOLAS FIALA
602-712-7453 |
Design | Design |
| 10 | CH | 320.5 | H821101C | S | TEXAS CANYON REST AREA | YB1K | WATER, STRUCTURAL, MECHANICAL & ELECTRICAL REHAB |
GIOVANNI NABAVI
602-712-7486 |
TBD | TBD |
| 10 | CH | 322.0 | H815101C | S | DRAGOON RD - WEST WILLCOX TI (WB) | SQ1K | PAVEMENT PRESERVATION |
RAED DALBIK
602-712-7715 |
04/01/2013 A | 5/22/2013 |
| 10 | CH | 333.0 | H839601D | S | US 191 TO EAST WILLCOX TI | RC1L | RR (5" TL, 3" PL) & AR-ACFC |
MEHRAN SALEHI
602-712-7637 |
11/29/2013 | 1/2/2014 |
| 10 | CH | 381.0 | H837101C | S | SAN SIMON RIVER BR (STR #1167,116 | KV1L | SCOUR RETROFIT |
NICHOLAS FIALA
602-712-7453 |
05/28/2013 | 3/4/2013 |
| 10 | CH | 383.0 | S | SAN SIMON PORT OF ENTRY | BV1M | PE PH 1 & 2 |
STEPHEN WILSON
520-388-4263 |
Design | Design | |
| 10 | CH | 388.0 | H821601C | S | SAN SIMON REST AREA | YI1K | NEW WELL,WATER PUMPS,STRUC,ELECT,MECH REHAB |
GIOVANNI NABAVI
602-712-7486 |
TBD | TBD |
| 15 | MO | 0.0 | F | NEVADA STATE LINE - MP 13 | BW1M | RR(4" TL, 3" PL) AR-ACFC |
GEORGE WALLACE
928-779-7580 |
TBD | TBD | |
| 15 | MO | 0.0 | F | SCENIC TO STATE LINE | BY1M | PE PH 1 & 2 |
GEORGE WALLACE
928-779-7580 |
Design | Design | |
| 15 | MO | 0.0 | F | I-15 MP 0-29 | QG1M | STUDY |
GEORGE WALLACE
928-779-7580 |
Design | Design | |
| 15 | MO | 1.0 | H858101D | F | NEVADA STATE LINE TO UTAH STATE L | FH1M | SIGN REHAB/REPLACE |
JEROME CHOY
602-712-4386 |
06/01/2016 | 7/1/2016 |
| 15 | MO | 13.0 | H832501C | F | VIRGIN RIVER BRIDGE NO.3 #1615 | IC1L | BRIDGE DECK REHABILITATION |
DAVID BENTON
602-712-6908 |
05/28/2013 | 6/3/2013 |
| 15 | MO | 15.0 | H857401C | F | VIRGIN RIVER BRIDGE #6 (STR #1619 | BH1M | CMAR BRIDGE REHABILITATION CONSTRUCTION |
GEORGE WALLACE
928-779-7580 |
11/08/2013 | 11/8/2013 |
| 15 | MO | 22.0 | H830901C | F | VIRGIN RIVER BRIDGE NO.7 #1236 | HF1L | BRIDGE DECK REHABILITATION |
DAVID BENTON
602-712-6908 |
05/28/2013 | 6/3/2013 |
| 17 | MA | 195.0 | H814601D | E | BUCKEYE RD,GRANT ST,ADAMS ST & JE | VT1K | ELECTRICAL REHABILITATION |
MONICA BAIZA
602-712-4711 |
TBD | TBD |
| 17 | MA | 197.9 | H865401C | E | PHOENIX DURANGO CURVE | OM1M | CONSTRUCTION OF EROSION & SEDIMENTATION MITIGATION |
CARMELO ACEVEDO
602-712-4511 |
05/28/2013 | 6/3/2013 |
| 17 | MA | 198.0 | E | BUCKEYE RD, GRANT,JEFFERSON & ADA | BZ1M | ELECTRICAL REHABILITATION |
STEVE BEASLEY
602-712-7645 |
TBD | TBD | |
| 17 | MA | 202.3 | H8333H1D | E | INDIAN SCHOOL ROAD - PEORIA AVENU | HW1L | SIGN REHABILITATION |
ADAM MCGUIRE
602-712-8403 |
05/30/2014 | 6/27/2014 |
| 17 | MA | 215.0 | H844501C | E | SR 101L (AGUA FRIA) TO ANTHEM WAY | TR1H | CONSTRUCT FMS |
LYDIA WARNICK
602-712-4281 |
07/16/2013 | 5/17/2013 |
| 17 | MA | 216.0 | H7251S1D | E | I-17 @ PEORIA AND UNION HILLS | GQ1J | DRAINAGE GRATE IMPROVEMENTS |
MONICA BAIZA
602-712-4711 |
TBD | TBD |
| 17 | MA | 231.0 | H826801C | E | NEW RIVER BRIDGES, STR # 1290 &12 | CF1L | SCOUR RETROFIT |
NICHOLAS FIALA
602-712-7453 |
12/02/2013 | 1/6/2014 |
| 17 | YV | 232.0 | P | ROCK SPRINGS TO CORDES JUNCTION | CU1J | PE PH2 (WIDEN ROADWAY) |
JOHN DICKSON
602-712-8683 |
Design | Design | |
| 17 | MA | 238.6 | H8454B1D | P | MOORES GULCH BRIDGE SB #339 | RH1L | DESIGN BRIDGE REPLACEMENT |
PE-SHEN YANG
602-712-8606 |
Design | Design |
| 17 | YV | 245.0 | H812101C | P | COLDWATER CANYON RD-CROWN KING RD | RW1K | RR (5" TL, 3" PL) & AR-ACFC |
NAZAR NABATY
602-712-8034 |
05/28/2013 | 5/31/2013 |
| 17 | YV | 269.2 | H813501D | P | DUGAS TI - CHERRY ROAD | SO1K | RR (5" TL, 3" PL) & AR-ACFC |
NAZAR NABATY
602-712-8034 |
11/01/2013 | 12/2/2013 |
| 17 | YV | 279.6 | H860601D | P | SR 169 TO MIDDLE VERDE ROAD | CA1M | RR(5" TL, 3" PL) + AR-ACFC |
VIVIAN LI
602-712-8708 |
TBD | TBD |
| 17 | YV | 287.0 | H8544CAX | P | VERDE RIVER BRIDGES NB & SB #1731 | ZE1L | DESIGN |
MAHMUD HASAN
602-712-6908 |
12/01/2015 | 12/28/2015 |
| 17 | YV | 287.0 | H8623CAX | P | VERDE RIVER BRIDGE NB #1731 | HT1M | DESIGN BRIDGE REHABILITATION |
MOZAFFOR BISWAS
602-712-8013 |
Design | Design |
| 17 | YV | 292.0 | H8627CAX | P | SOUTH OF MCGUIREVILLE | CB1M | ROCKFALL MITIGATION |
VIVIAN LI
602-712-8708 |
TBD | TBD |
| 17 | YV | 293.0 | H8632CAX | P | MCGUIREVILLE TI UP #652 | JY1M | DESIGN |
PE-SHEN YANG
602-712-8606 |
Design | Design |
| 19 | SC | 0.3 | H839501D | T | INTERNATIONAL BORDER - JCT B-19 | MT1L | RR AR-ACFC |
ADAM MCGUIRE
602-712-8403 |
03/28/2014 | 4/25/2014 |
| 19 | SC | 7.0 | H840101L | T | I-19 E. FRONTAGE ROAD \ RUBY RD T | MU1L | PROJECT ASSESSMENT |
TAMI WOLLASTON
602-712-8485 |
Design | Design |
| 19 | SC | 9.0 | T | I-19 FRONTAGE ROAD, NB | CC1M | DRAINAGE REPAIR |
ROBIN RAINE
520-388-4264 |
TBD | TBD | |
| 19 | SC | 16.0 | H815601D | T | PALO PARADO - CHAVEZ SLIDING TI | SU1K | RR (4" TL, 3" PL) + FR |
ADAM MCGUIRE
602-712-8403 |
04/14/2014 | 5/16/2014 |
| 19 | PM | 29.0 | H805101C | T | ARIVACA RD - PIMA MINE RD | NF1K | PAVEMENT PRESERVATION |
ROD COLLINS
602-712-7980 |
TBD | TBD |
| 19 | PM | 47.0 | H722201C | T | SAHUARITA TI | XF1H | CONSTRUCT NEW TI |
DAVID BRAUER
520-388-4263 |
Design | Design |
| 19 | PM | 49.6 | H817801D | T | PIMA MINE TI OP SB#1304 & NB#1303 | EX1L | DESIGN |
DAVID BENTON
602-712-6908 |
Design | Design |
| 19 | PM | 56.8 | H858201D | T | SANTA CRUZ BR SB#1244 & NB#1243 | KA1M | DESIGN |
PE-SHEN YANG
602-712-8606 |
Design | Design |
| 19 | PM | 58.0 | H849301C | T | I-19, VALENCIA ROAD INTERCHANGE | VI1L | MAINLINE WIDENING |
ROBIN RAINE
520-388-4264 |
07/12/2013 | 2/3/2014 |
| 19 | PM | 58.7 | H846701D | T | AJO WAY TI (JCT SR 86) | QK1C | RECONSTRUCT TI |
ROBIN RAINE
520-388-4264 |
06/15/2016 | 9/28/2016 |
| 19 | PM | 59.0 | H771401C | T | SAN XAVIER PEDESTRIAN BRIDGE | WQ1L | PEDESTRIAN BRIDGE IMPROVEMENTS |
NATALIE CLARK
520-388-4252 |
04/29/2014 | 5/30/2014 |
| 19B | SC | 0.1 | H839401D | T | INTERNATIONAL BORDER - MARIPOSA/S | MS1L | RR 2" AC |
ADAM MCGUIRE
602-712-8403 |
03/28/2014 | 4/25/2014 |
| 40 | MO | 3.6 | H852201D | K | TOPOCK PORT OF ENTRY | XS1L | DESIGN NEW PORT OF ENTRY FACILITY |
MICHAEL DENBLEYKER
602-712-7808 |
Design | Design |
| 40 | MO | 40.0 | K | CROOKTON TO TRANSWESTERN | CD1M | SIGN REHABILITATION |
LARRY DOESCHER
602-712-7551 |
TBD | TBD | |
| 40 | MO | 57.0 | H813401D | K | RATTLESNAKE WASH - JCT US 93 | SM1K | RR(5" TL, 3" PL) & AR-ACFC |
NAZAR NABATY
602-712-8034 |
TBD | TBD |
| 40 | MO | 66.5 | H751301D | K | I-40, BLAKE RANCH RD | QP1J | TI IMPROVEMENTS |
LARRY DOESCHER
602-712-7551 |
TBD | TBD |
| 40 | MO | 73.5 | H842301D | K | PEACOCK WASH WB #1251 & BIG SANDY | OL1L | DESIGN |
PE-SHEN YANG
602-712-8606 |
Design | Design |
| 40 | MO | 74.0 | H860401D | K | HWY 141 JCT TO SILVER SPRINGS ROA | CF1M | RR (5"TL, 3" PL) + AR-ACFC + SHOULDERS |
LARRY DOESCHER
602-712-7551 |
TBD | TBD |
| 40 | MO | 81.0 | K | EAST OF US 93 TI | CG1M | ROCKFALL MITIGATION |
LARRY DOESCHER
602-712-7551 |
TBD | TBD | |
| 40 | MO | 83.0 | K | WILLOW SPRINGS | CH1M | ROCKFALL MITIGATION |
LARRY DOESCHER
602-712-7551 |
TBD | TBD | |
| 40 | MO | 83.0 | H8618CAX | K | WILLOW CREEK BRIDGE NO 2 EB (#159 | HV1M | DESIGN BRIDGE REHABILITATION |
MOZAFFOR BISWAS
602-712-8013 |
Design | Design |
| 40 | MO | 83.2 | H8613CAX | K | WILLOW CREEK BRIDGES EB #1, #2, # | JZ1M | DESIGN |
PE-SHEN YANG
602-712-8606 |
Design | Design |
| 40 | MO | 87.0 | H860701D | K | WILLOW RANCH ROAD TO MP 92, EB | CI1M | RR (5" TL, 3" PL) + AR-ACFC WITH SHOULDERS EB |
LARRY DOESCHER
602-712-7551 |
TBD | TBD |
| 40 | YV | 144.0 | H851501D | K | ASHFORK ATSFFR - EAST ASH FORK TI | WT1L | BRIDGE DECK REHABILITATION |
NAVAPHAN VIBOOLMATE
602-712-8478 |
TBD | TBD |
| 40 | CN | 185.0 | F | TRANSWESTERN - LEUPP JCT | CJ1M | PE PH 1 & 2 |
GEORGE WALLACE
928-779-7580 |
Design | Design | |
| 40 | CN | 204.0 | H812501D | F | WALNUT CANYON - TWIN ARROWS | SD1K | RR 3" & 2" AC & AR-ACFC |
CHRIS PULEO
602-712-7992 |
11/18/2013 | 12/19/2014 |
| 40 | CN | 218.7 | H789001C | F | CANYON PADRE BRIDGE, STR #1670 | EV1L | DECK REPLACEMENT |
PE-SHEN YANG
602-712-8606 |
03/03/2014 | 4/1/2014 |
| 40 | CN | 218.7 | H829101D | F | TWIN ARROWS TI, EB OFF-RAMP | KH1L | RAMP REMOVAL, RECONSTR & ACCESS CTRL MODIFICATION |
GEORGE WALLACE
928-779-7580 |
TBD | TBD |
| 40 | SW | 235.0 | H821401C | H | PAINTED CLIFFS & METEOR CRATER RE | YF1K | SYSTEM PRESERVATION - RESTORATION/REHAB/RESURFACE |
GIOVANNI NABAVI
602-712-7486 |
TBD | TBD |
| 40 | NA | 254.6 | H807401D | H | RUBY WASH BRIDGE - E WINSLOW TI O | EE1K | BRIDGE REHABILITATION |
XUEFAN XU
602-712-6264 |
06/03/2013 | 7/1/2013 |
| 40 | NA | 257.0 | H849101D | H | SR 87 TI UP #1598 | XC1L | DESIGN |
SHENG-YUNG HSU
602-712-8613 |
Design | Design |
| 40 | NA | 271.0 | H837201C | H | MANILA WASH BRIDGES STR #851,852 | KW1L | SCOUR RETROFIT |
NICHOLAS FIALA
602-712-7453 |
05/28/2013 | 3/4/2013 |
| 40 | NA | 284.3 | H791801D | H | LEROUX WASH BRIDGE EB #1772 & WB | JL1K | BRIDGE REPAIR |
PE-SHEN YANG
602-712-8606 |
TBD | TBD |
| 40 | NA | 289.0 | H858601D | H | E HOLBROOK TI OP EB#1369 & WB #13 | GT1M | DESIGN BRIDGE REHABILITATION |
SHENG-YUNG HSU
602-712-8613 |
Design | Design |
| 40 | NA | 290.0 | H | HOLBROOK - SUN VALLEY | CL1M | FENCING AND CATTLE GUARDS |
GIULY CACERES
602-712-8654 |
TBD | TBD | |
| 40 | NA | 290.2 | H813101C | H | HOLBROOK - SUN VALLEY | SJ1K | RR (5"TL, 3"PL) & AR-ACFC |
RICHARD GALASKA JR.
602-712-7989 |
06/03/2013 | 7/1/2013 |
| 40 | NA | 297.0 | H860801D | H | SUN VALLEY ROAD - WASHBOARD ROAD | CN1M | RR (5" TL, 3" PL) + 2"AC + FC |
JAYA VELAGAPUDI
602-712-7653 |
12/01/2014 | 1/2/2015 |
| 40 | NA | 297.0 | H | GOODWATER - YELLOWHORSE | CM1M | PE PH 1 & 2 |
GIULY CACERES
602-712-8654 |
Design | Design | |
| 40 | NA | 298.0 | H859101D | H | MP 298 UTILITY OVERPASS | QD1L | DESIGN OF CBC EXTENSION |
JAYA VELAGAPUDI
602-712-7653 |
12/01/2014 | 1/2/2015 |
| 40 | NA | 303.0 | H803601D | H | ADAMANA TI | QO1L | DRAINAGE IMROVEMENTS |
JAYA VELAGAPUDI
602-712-7653 |
TBD | TBD |
| 40 | AP | 322.0 | H | CHAMBERS PORT OF ENTRY | CP1M | PE PH 1 & 2 |
MICHAEL DENBLEYKER
602-712-7808 |
Design | Design | |
| 40 | AP | 340.0 | H552601C | H | SANDERS PORT OF ENTRY | ZY1D | RECONSTRUCT POE |
MICHAEL DENBLEYKER
602-712-7808 |
TBD | TBD |
| 40 | AP | 357.5 | H | WINDOW ROCK TI | QN1C | PE PH 1 |
GIULY CACERES
602-712-8654 |
Design | Design | |
| 40 | AP | 358.5 | H8141S1D | H | LUPTON TI | QQ1K | DCR AND ENVIRONMENTAL STUDIES |
GIULY CACERES
602-712-8654 |
Design | Design |
| 40F | MO | 47.8 | H8615CAX | K | SOUTH OF KINGMAN | CE1M | ROCKFALL MITIGATION |
CARMELO ACEVEDO
602-712-4511 |
02/11/2014 | 3/12/2014 |
| 60 | MA | 109.9 | HX25001D | P | US 60 @ APACHE STREET IN WICKENBU | IN1M | DESIGN |
STEPHANIE WILHARDT-SMITH
602-712-7396 |
Design | Design |
| 60 | MA | 115.5 | H8418B1D | P | MONARCH WASH BR, STR #204 & 759 | RE1L | SCOUR RETROFIT |
MAHMUD HASAN
602-712-6908 |
12/02/2013 | 12/26/2013 |
| 60 | MA | 134.1 | H865001C | P | JOMAX RD. TO SR303L | NV1M | DESIGN PAVEMENT PRESERVATION |
KEVIN ROBERTSON
602-712-3131 |
Design | Design |
| 60 | MA | 139.0 | H732701L | E | SR 303L TO SR 101L, AGUA FRIA, PH | JJ1H | CONSTRUCT ROADWAY IMPROVEMENTS |
MOHAMMAD A. ZAID
602-712-8467 |
TBD | TBD |
| 60 | MA | 143.0 | H8374C1D | E | US60/THUNDEBIRD ROAD INTERSECTION | NL1L | RECONSTRUCT TI |
MOHAMMAD A. ZAID
602-712-8467 |
TBD | TBD |
| 60 | MA | 144.0 | H8485CAX | E | US 60 / BELL ROAD TI | UV1L | DCR AND ENVIRONMENTAL ASSESSMENT |
MOHAMMAD A. ZAID
602-712-8467 |
TBD | TBD |
| 60 | MA | 148.9 | E | SR 101L, AGUA FRIA TO VAN BUREN S | WX1K | CONSTRUCT ROADWAY IMPROVEMENTS |
MOHAMMAD A. ZAID
602-712-8467 |
TBD | TBD | |
| 60 | MA | 158.0 | H641801C | E | US-60 WB AT 19TH AVE | YY1F | LEFT TURN LANE CAPACITY |
|
IGA | IGA |
| 60 | MA | 189.0 | E | SOSSAMAN - MERIDIAN | CQ1M | DRAINAGE IMPROVEMENTS |
STEVE BEASLEY
602-712-7645 |
TBD | TBD | |
| 60 | MA | 192.0 | E | CRISMON RD - MERIDIAN RD | EN1M | DESIGN HOV/GPL |
AMY RITZ
602-712-4691 |
Design | Design | |
| 60 | MA | 194.0 | H830001D | E | MERIDIAN ROAD. HALF TI | NM1L | CONSTRUCT TI |
AMY RITZ
602-712-4691 |
TBD | TBD |
| 60 | PN | 222.0 | H790001D | G | SILVER KING SECTION & SUPERIOR ST | GS1H | RECONSTRUCT TO 4 LANE RDWY W/CNT TURN LANE |
ORLANDO JEREZ
602-712-7187 |
TBD | TBD |
| 60 | PN | 227.7 | H856601D | G | QUEEN CREEK #406 | ZD1L | DESIGN |
SHENG-YUNG HSU
602-712-8613 |
Design | Design |
| 60 | PN | 228.8 | H855801D | G | EAST OF QUEEN CREEK TUNNEL | ZA1L | ROCKFALL MITIGATION |
ORLANDO JEREZ
602-712-7187 |
TBD | TBD |
| 60 | PN | 230.0 | H581801D | G | OAK FLAT - MIAMI | EX1F | CONSTRUCT PASSING/CLIMBING LANE |
EVELYN MA
602-712-6660 |
01/03/2014 | 2/3/2014 |
| 60 | PN | 232.0 | G | WEST OF PINTO CREEK BRIDGE | CV1M | ROCKFALL MITIGATION |
ORLANDO JEREZ
602-712-7187 |
TBD | TBD | |
| 60 | GI | 290.0 | H808301C | G | MP 290, 296 AND 320 AT HAGEN HIL | OR1K | ROCKFALL CONTAINMENT |
VICKI BEVER
602-712-8161 |
05/28/2013 | 2/1/2013 |
| 60 | GI | 292.0 | H826201C | G | SALT RIVER CANYON REST AREA | BT1L | REPLACE COMPOSTING TOILETS & STRUCTURAL REHAB |
GIOVANNI NABAVI
602-712-7486 |
11/04/2013 | 12/2/2013 |
| 60 | GI | 302.0 | H859901D | G | MP 302 - 311 | CW1M | RR 3" AC + AR-ACFC |
ORLANDO JEREZ
602-712-7187 |
TBD | TBD |
| 60 | GI | 304.8 | H778601C | G | FLYING V CANYON TO SQUAW DRESS RI | XI1J | SLOPE STABILIZATION |
FAKHRADIN HAKARI
602-712-7468 |
06/20/2013 | 6/28/2013 |
| 60 | NA | 341.0 | HX23901C | G | US 60 & 9TH PLACE, SHOW LOW | QJ1L | TRAFFIC SIGNAL |
HASINA LUNA
602-712-7371 |
05/28/2013 | 6/3/2013 |
| 60 | NA | 342.0 | H510701C | G | SHOW LOW TO LITTLE MORMON LAKE | QP1C | WIDEN ROADWAY |
ORLANDO JEREZ
602-712-7187 |
06/02/2014 | 7/2/2014 |
| 64 | CN | 234.5 | H825801C | F | GRAND CANYON AIRPORT- FS RD 328 | BM1L | SHOULDER WIDENING |
JIM REEVES
602-712-8283 |
TBD | TBD |
| 66 | CN | 91.0 | H8622CAX | K | WASH BR #141 & TRUXTON WASH BR #1 | HU1M | DESIGN BRIDGE REHABILITATION |
MOZAFFOR BISWAS
602-712-8013 |
Design | Design |
| 68 | MO | 14.0 | H864701C | K | MP 14 TO VERDE RD. | NF1M | DESIGN PAVEMENT PRESERVATION |
KEVIN ROBERTSON
602-712-3131 |
Design | Design |
| 68 | MO | 20.0 | H860501D | K | MP 19, TURN LANES | CZ1M | DESIGN & CONSTRUCT 3 EB TURN LANES |
LARRY DOESCHER
602-712-7551 |
Design | Design |
| 68 | MO | 21.7 | H864801C | K | VERDE RD. TO TOOMAN RD. | NE1M | DESIGN PAVEMENT PRESERVATION |
KEVIN ROBERTSON
602-712-3131 |
Design | Design |
| 69 | YV | 271.6 | H812201C | P | BIG BUG 4 TO POLAND JCT | RX1K | RR 3" TL, RR AR-ACFC FULL WIDTH |
NAZAR NABATY
602-712-8034 |
05/14/2013 A | 5/22/2013 |
| 69 | YV | 281.1 | HX24201C | P | MP 281.1 - MP 289.7 | BX1M | MODIFY SIGNALS |
RON FOLUCH
602-712-8116 |
06/24/2013 | 6/3/2013 |
| 69 | YV | 292.1 | H854001C | P | SUNRISE BLVD TO PRESCOTT CANYON D | YJ1L | PAVEMENT PRESERVATION (AR-ACFC) |
KEVIN ROBERTSON
602-712-3131 |
04/15/2013 A | 5/15/2013 |
| 69 | YV | 293.8 | P | PRESCOTT CANYON DR - PRESCOTT LAK | QI1M | SCOPING |
BRET ANDERSON
602-712-8144 |
Design | Design | |
| 70 | GI | 259.0 | H835901C | G | GILSON WASH BRIDGE, STR # 464 | KX1L | SCOUR RETOFIT |
NICHOLAS FIALA
602-712-7453 |
TBD | TBD |
| 70 | GH | 295.0 | H763701D | S | BYLAS AREA | GN1J | TWLTL & ROADWAY WIDENING |
STEPHEN WILSON
520-388-4263 |
06/02/2014 | 6/20/2014 |
| 70 | GH | 299.0 | H854701D | S | VARIOUS BRIDGES #394 #513 #514 #5 | ZG1L | DESIGN |
NICHOLAS FIALA
602-712-7453 |
Design | Design |
| 70 | GH | 340.0 | H5109S1D | S | SAFFORD TO SOLOMON | QS1C | PA (WIDEN TO 4 LANES, LEFT TURN LANES) |
STEPHEN WILSON
520-388-4263 |
Design | Design |
| 70 | GH | 347.0 | H853801C | S | HAEKEL RD TO US 191 | YQ1L | PAVEMENT PRESERVATION (MICRO SURFACING) |
MAFIZ MIAN
602-712-4061 |
05/28/2013 | 5/1/2013 |
| 70 | GH | 350.0 | H865101C | S | US 191 TO GRAHAM COUNTY LINE | NW1M | DESIGN PAVEMENT PRESERVATION |
KEVIN ROBERTSON
602-712-3131 |
Design | Design |
| 73 | NA | 342.3 | H6578S1D | G | WHITERIVER TO COAL MINE CANYON | FF1G | 2" AC + FR |
NAZAR NABATY
602-712-8034 |
01/06/2014 | 2/3/2014 |
| 74 | MA | 22.4 | H849501D | E | PICACHO WASH TRAIL TO JCT I-17 | WC1L | RR(5" TL, 3" PL) + AR ACFC |
DOUG SMITH
602-712-8482 |
10/31/2013 | 11/29/2013 |
| 74 | MA | 30.0 | H840301C | E | I-17 AND LAKE PLEASANT PKWY | MW1L | CONSTRUCT DRAINAGE IMPROVEMENTS |
ADAM MCGUIRE
602-712-8403 |
TBD | TBD |
| 75 | GE | 379.1 | H8152S1D | S | DUNCAN BRIDGE - LITTLE SANDS WASH | SR1K | 3" AC & AR-ACFC |
DOUG SMITH
602-712-8482 |
TBD | TBD |
| 75 | GE | 384.0 | H649002D | S | LITTLE SANDS WASH | LX1G | BANK PROTECTION |
DAVID BRAUER
520-388-4263 |
07/01/2013 | 8/1/2013 |
| 75 | GE | 387.0 | H8464B1D | S | VARIOUS BRIDGES (STR #S 861,202,2 | RW1L | SCOUR RETROFIT |
MAHMUD HASAN
602-712-6908 |
12/02/2014 | 12/31/2014 |
| 77 | PM | 82.0 | H669401C | T | TANGERINE RD TO PINAL COUNTY LINE | AY1G | WIDENING TO 6 LANES - CONSTRUCTION |
ROBIN RAINE
520-388-4264 |
05/28/2013 | 6/3/2013 |
| 77 | PN | 100.0 | H739101C | T | ORACLE STATE PARK | CY1J | CONSTRUCT PARKING |
EVELYN MA
602-712-6660 |
Hold | Hold |
| 77 | PN | 105.4 | H826701C | T | POWER LINE - SAN MANUEL ROAD | HM1L | DESIGN SHOULDER WIDENING |
JIM REEVES
602-712-8283 |
Design | Design |
| 77 | PN | 123.5 | H796901C | T | ARAVAIPA CREEK BRIDGE, STR #399 | JG1K | BRIDGE REPLACEMENT |
SHERLY PAUL
602-712-7251 |
11/05/2013 | 8/30/2013 |
| 77 | GI | 147.6 | H832201C | G | DRIPPING SPRING BRIDGE #398 | NH1L | BRIDGE REPLACEMENT |
KEN RUFFENNACH
602-712-8938 |
02/03/2014 | 7/1/2013 |
| 77 | GI | 156.8 | H855901D | G | NEAR SUMMIT | YZ1L | ROCKFALL MITIGATION |
EVELYN MA
602-712-6660 |
12/19/2013 | 1/2/2014 |
| 77 | NA | 362.1 | H771201D | H | NORTH SNOWFLAKE | UB1J | BOX CULVERT EXTENSION |
GEORGE WALLACE
928-779-7580 |
TBD | TBD |
| 77 | NA | 366.2 | H728601C | H | FIVE MILE DRAW BRIDGE #20032 | ZS1H | DESIGN BRIDGE REPLACEMENT |
PE-SHEN YANG
602-712-8606 |
TBD | TBD |
| 77 | NA | 384.0 | H | 5 MILE WASH - JCT 377 | DC1M | CBC EXTENSION |
GIULY CACERES
602-712-8654 |
TBD | TBD | |
| 79 | PN | 101.8 | H807501C | T | CORONADO WASH BRIDGE STRUCTURE #2 | NY1K | BRIDGE REPLACEMENT |
WILLIAM DOWNES
602-712-7115 |
05/28/2013 | 6/21/2013 |
| 79 | PN | 122.5 | T | MP 122.5 | DD1M | EXTEND PIPES AND CULVERTS |
ROBIN RAINE
520-388-4264 |
TBD | TBD | |
| 79 | PN | 134.3 | HX24301D | T | SR 79 AT DIVERSION DAM ROAD IN FL | XM1L | DESIGN TRAFFIC SIGNAL SYSTEM |
ABDULKARIM RASHID
602-712-7602 |
Design | Design |
| 80 | CH | 316.5 | H800402C | S | TOMBSTONE, MP 316.5 TO MP 318.0 | WH1K | LIGHTING AND SIDEWALKS |
KOHINOOR KAR
602-712-6857 |
02/26/2015 | 3/26/2015 |
| 80 | CH | 364.0 | H854901D | S | WHITE WATER DRAW BRIDGE #1626 | ZI1L | DESIGN |
MAHMUD HASAN
602-712-6908 |
12/02/2015 | 12/28/2015 |
| 82 | SC | 20.0 | H718201C | T | PATAGONIA LAKE (SONOITA CREEK) | AR1E | CONSTRUCT ROAD |
EVELYN MA
602-712-6660 |
Hold | Hold |
| 82 | SC | 36.5 | H661801D | T | SR-82, MP 36.5 - 36.9 | GR1G | EXTEND 2 CBC'S AND ELIMINATE GUARDRAIL |
ROBIN RAINE
520-388-4264 |
TBD | TBD |
| 82 | SC | 39.0 | H6620S1D | T | ELGIN TURNOFF | GQ1G | EXTEND CMP'S, FLATTEN SLOPE & ELIMINATE GUARDRAIL |
ROBIN RAINE
520-388-4264 |
TBD | TBD |
| 82 | SC | 40.5 | H6619S1D | T | SR-82 AT MP 40.6 | GP1G | EXTEND CBC & ELIMINATE GUARDRAIL |
ROBIN RAINE
520-388-4264 |
TBD | TBD |
| 83 | SC | 12.0 | H850101C | T | MP 12 - MP 14 | DF1M | MILL AND PAVE |
DAVID BRAUER
520-388-4263 |
06/10/2013 | 6/28/2013 |
| 83 | PM | 46.5 | H806701C | T | I-10 - COUNTY LINE | NG1K | PAVEMENT PRESERVATION |
ROD COLLINS
602-712-7980 |
TBD | TBD |
| 85 | PM | 41.1 | H841301C | T | WELCOME ST. TO ESTRELLA | NK1L | PAVEMENT PRESERVATION (MILL & REPLACE) |
KEVIN ROBERTSON
602-712-3131 |
05/28/2013 | 6/3/2013 |
| 85 | MA | 153.2 | H800601C | E | WARNER STREET BRIDGE | ZN1J | CONSTRUCT NEW BRIDGE |
VELVET MATHEW
602-712-3062 |
TBD | TBD |
| 86 | PM | 80.0 | H804801C | T | MP 80 - 105.3 | MZ1K | SYSTEM PRESERVATION - ENGINEERING |
ROD COLLINS
602-712-7980 |
TBD | TBD |
| 86 | PM | 92.3 | H715001D | T | INDIAN ROUTE 15 INTERSECTION | GF1J | DESIGN INTERSECTION IMPROVEMENTS |
JEFF STINE
520-388-4260 |
Design | Design |
| 86 | PM | 114.7 | H828501D | T | TOWN OF SELLS PEDESTRIAN BRIDGES | GU1M | CONSTRUCT PEDESTRIAN BRIDGE |
NATALIE CLARK
520-388-4252 |
TBD | TBD |
| 86 | PM | 115.8 | H834801D | T | TOWN OF SELLS TO FRESNAL | KI1L | WIDEN SHOULDERS AND CULVERT EXTENSIONS |
DAVID BRAUER
520-388-4263 |
TBD | TBD |
| 86 | PM | 120.6 | H846901D | T | FRESNAL TO MP 123.9 | GX1M | DESIGN |
DAVID BRAUER
520-388-4263 |
Design | Design |
| 86 | PM | 125.0 | H8468CAX | T | SAN ISIDRO SECTION | UN1L | DRAINAGE IMPROVEMENTS AND SHOULDER WIDENING |
DAVID BRAUER
520-388-4263 |
Design | Design |
| 86 | PM | 159.5 | H680601C | T | VALENCIA RD - KINNEY RD | AZ1G | CONSTRUCT ROADWAY WIDENING TO 4 LANES |
DAVID BRAUER
520-388-4263 |
TBD | TBD |
| 87 | PN | 148.0 | H8465B1D | T | GILA RIVER BRIDGE, STR #635 | SG1L | SCOUR RETROFIT |
MAHMUD HASAN
602-712-6908 |
12/02/2014 | 12/26/2014 |
| 87 | MA | 177.8 | HX24401D | E | SR87 @ MCDOWELL RD | FO1M | DESIGN SIGNAL IMPROVEMENT |
TAMMY MIVSHEK
602-712-7220 |
Design | Design |
| 87 | GI | 226.0 | H820701C | P | SLATE CREEK | XT1K | ROAD REPAIR |
RON FOLUCH
602-712-8116 |
TBD | TBD |
| 87 | GI | 235.6 | H812301C | P | JUNCTION 188 - RYE | SB1K | RR 3" TL & AR-ACFC FULL WIDTH |
YUMI SHAPIRO
602-712-7983 |
05/28/2013 | 5/31/2013 |
| 87 | GI | 252.3 | H840901D | P | JCT OF SR 87 AND SR 260 | GG1M | DESIGN FOR INTERSECTION IMPROVEMENT |
VIVIAN LI
602-712-8708 |
Design | Design |
| 87 | GI | 263.0 | H718301C | P | TONTO NATURAL BRIDGE STATE PARK | TQ1H | CONSTRUCT NEW ROAD |
EVELYN MA
602-712-6660 |
TBD | TBD |
| 87 | CN | 268.1 | H8508CAX | P | MP 268.1 - MP 278 | DH1M | PE PH 1 & 2 |
JOHN DICKSON
602-712-8683 |
Design | Design |
| 87 | CN | 323.9 | H807701C | H | LIMESTONE WASH BRIDGE # | VM1K | BRIDGE REPLACEMENT |
KEN RUFFENNACH
602-712-8938 |
06/03/2013 | 7/1/2013 |
| 87 | CN | 324.0 | P | CLOVER CREEK | DI1M | ROCKFALL MITIGATION |
JOHN DICKSON
602-712-8683 |
TBD | TBD | |
| 87 | NA | 346.0 | H717901C | H | HOMOLOVI RUINS STATE PARK | A6SP | CONSTRUCT ROAD |
EVELYN MA
602-712-6660 |
Hold | Hold |
| 87 | NA | 346.0 | H | I-40 TO JCT SR 264 | DJ1M | CBC EXTENSIONS |
GIULY CACERES
602-712-8654 |
TBD | TBD | |
| 88 | PN | 196.0 | H830801C | E | SUPERSTITION BLVD | JD1L | CONSTRUCT ROUNDABOUT |
JIM REEVES
602-712-8283 |
05/30/2014 | 6/30/2014 |
| 88 | MA | 203.4 | H700501C | E | SR88, APACHE TRAIL GOLDFIELD TO C | NC1H | SPOT SAFETY IMPROVEMENTS |
JIM REEVES
602-712-8283 |
05/07/2014 | 6/4/2014 |
| 88 | MA | 204.0 | H811201D | E | APACHE JCT - TORTILLA FLATS | RN1K | MILL 2" & 3" AC & CHIP SEAL |
MONIR ZAMAN
602-712-7302 |
12/27/2013 | 1/31/2014 |
| 89 | YV | 258.3 | H8136S1D | P | JCT US 93 - JCT SR 71 | SP1K | RR 3" & AR-ACFC |
ASZITA MANSOR
602-712-6961 |
TBD | TBD |
| 89 | YV | 272 | H8498H1D | P | YARNELL HILL | WH1L | DESIGN |
RON FOLUCH
602-712-8116 |
Design | Design |
| 89 | YV | 288 | H543501C | P | SR-89 @ KIRKLAND JCT / WAGNER RD | EE1E | CONSTRUCT RIGHT & LEFT TURN LANES, SHOULDER |
EVELYN MA
602-712-6660 |
Hold | Hold |
| 89 | YV | 289.0 | H773201C | P | SR 89 EXTENSION OF DRAINAGE FACIL | VB1J | SYSTEM ENHANCEMENT - ENGINEERING |
EVELYN MA
602-712-6660 |
Hold | Hold |
| 89 | YV | 307.6 | H864901C | P | S. PONDEROSA PARK RD. TO PETERSON | NU1M | DESIGN PAVEMENT PRESERVATION |
KEVIN ROBERTSON
602-712-3131 |
Design | Design |
| 89 | YV | 319.0 | H851801C | P | JCT SR 89A TO DEEPWELL RANCH ROAD | CZ1J | WIDEN THE SR 89 CORRIDOR |
FAKHRADIN HAKARI
602-712-7468 |
TBD | TBD |
| 89 | YV | 320.4 | H803901C | P | DEEP WELL RANCH ROAD TO SOUTH CHI | TE1J | CONSTRUCT ROADWAY WIDENING |
FAKHRADIN HAKARI
602-712-7468 |
10/03/2013 | 7/1/2013 |
| 89 | YV | 327.0 | HX24701D | P | SR 89 @ ROAD 1 NORTH IN CHINO VAL | FS1M | DESIGN |
STEPHANIE WILHARDT-SMITH
602-712-7396 |
Design | Design |
| 89 | YV | 328.0 | H833001C | P | PERKINSVILLE RD ROUNDABOUT | JE1L | SYSTEM ENHANCEMENT - ENGINEERING |
FAKHRADIN HAKARI
602-712-7468 |
Design | Design |
| 89 | YV | 330.0 | H827801C | P | ROAD 4 NORTH | HS1L | CONSTRUCT ROUNDABOUT |
FAKHRADIN HAKARI
602-712-7468 |
03/03/2014 | 4/1/2014 |
| 89 | YV | 345.0 | H8514CAX | K | HELL CANYON BRIDGE #483 | XA1L | REPLACEMENT & WIENING |
NAVAPHAN VIBOOLMATE
602-712-8478 |
TBD | TBD |
| 89 | YV | 349.0 | P | JCT SR 260 (COTTONWOOD) | DM1M | CONSTRUCT DUAL RIGHT TURN LANES |
MIKE ANDAZOLA
602-712-7629 |
TBD | TBD | |
| 89 | CN | 385.1 | H741801C | F | OAK CREEK CANYON | IS1J | CREEK BANK PROTECTION |
GEORGE WALLACE
928-779-7580 |
TBD | TBD |
| 89 | CN | 403.0 | H8399CAX | F | JCT SR 89A / PLAZA WAY (FLAGSTAFF | HO1L | DRAINAGE IMPROVEMENTS |
GEORGE WALLACE
928-779-7580 |
TBD | TBD |
| 89 | CN | 420.0 | F | FLAGSTAFF CITY LIMITS - LENOX PAR | DN1M | FEASIBILITY REPORT FOR ACCESS MGT PLANNING |
GEORGE WALLACE
928-779-7580 |
Design | Design | |
| 89 | CN | 452.6 | H705601C | F | SOUTH OF GRAY MOUNTAIN | QQ1H | PASSING LANES (NB AND SB) |
GEORGE WALLACE
928-779-7580 |
TBD | TBD |
| 89 | CN | 463.5 | H791501C | F | SR-64 TO LITTLE COLORADO RIVER | DA1J | CONSTRUCT 4-LANE URBAN, SR64 INTERSECTION & BRIDGE |
DAVID BENTON
602-712-6908 |
05/30/2013 | 6/20/2013 |
| 89 | CN | 476.6 | H811601C | F | MOENKOPI WASH - HIDDEN SPRINGS | RR1K | 2.5" AC OVERLAY AND 1/2" AR-ACFC |
CHRIS PULEO
602-712-7992 |
09/30/2013 | 11/1/2013 |
| 89 | CN | 510.0 | H7866S1D | F | GRAY SPOT WASH - NORTH RED HILL | AH1K | 3" AC + FR |
HALDUN GUVENEN
602-712-7725 |
10/15/2013 | 11/15/2013 |
| 89 | CN | 523.9 | H803801D | F | BITTER SPRINGS | FD1L | INSTALL INTERSECTION LIGHTING |
GEORGE WALLACE
928-779-7580 |
TBD | TBD |
| 89 | CN | 525.0 | F | JCT US 89A - BIG CUT | FP1L | EP (PIPE) DROP-OFF MITIGATION |
GEORGE WALLACE
928-779-7580 |
TBD | TBD | |
| 89 | CN | 526.0 | H864101C | F | MP 526 - MP 527 SOUTH OF PAGE | KE1M | GEOTECHNICAL INVESTIGATION |
MIKE ANDAZOLA
602-712-7629 |
Design | Design |
| 89 | CN | 546.8 | H845601D | F | US 89 & HAUL RD IN PAGE | YH1L | DESIGN |
GEORGE WALLACE
928-779-7580 |
Design | Design |
| 89 | CN | 549.6 | H792001C | F | GLEN CANYON BRIDGE #537 | GF1K | DESIGN |
DAVID BENTON
602-712-6908 |
Design | Design |
| 89 | CN | 551.0 | H829001D | F | PAGE MAINTENANCE YARD | HG1L | WIDENING FOR TURN LANES |
GEORGE WALLACE
928-779-7580 |
TBD | TBD |
| 89A | YV | 343.0 | P | SOUTH OF JEROME | DL1M | ROCKFALL MITIGATION |
JOHN DICKSON
602-712-8683 |
TBD | TBD | |
| 89A | YV | 353.5 | H830101D | P | SR 89A AT SR 260 INTERSECTION | WI1L | DESIGN |
MIKE ANDAZOLA
602-712-7629 |
07/09/2013 | 7/23/2013 |
| 89A | YV | 365.0 | F | RED ROCK STATE PARK | NSSP | DESIGN |
EVELYN MA
602-712-6660 |
Hold | Hold | |
| 89A | CN | 386.6 | H812601C | F | PUMPHOUSE WASH - OVERLOOK | SE1K | RR (3"AC, 2.5" AC + AR-ACFC) FULL WIDTH |
RAY LEON
602-712-7712 |
11/01/2013 | 12/2/2013 |
| 89A | CN | 390.0 | H703201L | F | OVERLOOK TO J W POWELL BLVD | SF1H | DESIGN |
GEORGE WALLACE
928-779-7580 |
Design | Design |
| 89A | CN | 399.0 | H413401C | F | SR 89A JW POWELL BLVD | IV1A | CONSTRUCT INTERSECTION IMPROVEMENTS |
ASZITA MANSOR
602-712-6961 |
08/01/2013 | 9/10/2013 |
| 89A | CN | 525.0 | F | JCT US 89 - COLORADO RIVER | UZ1J | EXTEND PIPES AND CULVERTS |
GEORGE WALLACE
928-779-7580 |
TBD | TBD | |
| 89A | CN | 538.0 | H777501L | F | COLORADO RIVER TO HOUSE ROCK (PHA | LP1K | EXTEND PIPES AND CULVERTS |
GEORGE WALLACE
928-779-7580 |
TBD | TBD |
| 89T | CN | 0.0 | H864501C | F | US 89 EMERGENCY DETOUR (N 20, US | LX1M | CONSTRUCT ROADWAY |
MIKE ANDAZOLA
602-712-7629 |
TBD | TBD |
| 90 | CH | 321.0 | H849701C | S | SR 92 - GIULIO CESARE AVENUE | VY1L | LIGHTING |
RON FOLUCH
602-712-8116 |
12/09/2013 | 3/3/2014 |
| 90 | CH | 323.5 | H655501C | S | CENTRAL AVE TO MOSON RD, E OF SIE | DJ1G | WIDEN TO 5 LANES |
STEPHEN WILSON
520-388-4263 |
TBD | TBD |
| 92 | CH | 322.1 | H826501C | S | SR 92 @ FOOTHILLS DR | HL1L | INTERSECTION IMPROVEMENTS |
JIM REEVES
602-712-8283 |
02/13/2014 | 3/13/2014 |
| 92 | CH | 324.3 | H716701C | S | BUFFALO SOLDIER TRAIL TO KACHINA | LC1J | RAISED MEDIAN |
AKRAM FRIEKH
602-712-8553 |
05/28/2013 | 6/3/2013 |
| 92 | CH | 340.5 | H832301D | S | SAN PEDRO RIVER BRIDGE #449 | JR1L | BRIDGE REPLACEMENT |
PE-SHEN YANG
602-712-8606 |
TBD | TBD |
| 92 | CH | 351.0 | S | MELODY LANE - NACO RD | FF1M | WIDEN TO 3 LANES |
STEPHEN WILSON
520-388-4263 |
TBD | TBD | |
| 93 | MO | 17.4 | H7905S1D | K | MP 17.4 - MP 58.4 | IP1K | PE PH 1 & 2 |
LARRY DOESCHER
602-712-7551 |
Design | Design |
| 93 | MO | 101.8 | H738801C | K | ANTELOPE WASH | LE1G | CONSTRUCT 4-LANE DIVIDED HIGHWAY |
LARRY DOESCHER
602-712-7551 |
05/28/2013 | 4/1/2013 |
| 93 | MO | 109.0 | K | CANE SPRINGS | DO1M | PE PH 1 & 2 |
LARRY DOESCHER
602-712-7551 |
Design | Design | |
| 93 | MO | 116.0 | H8232S1D | K | CARROW TO STEPHENS | TC1J | CONSTRUCT 4-LANE DIVIDED HIGHWAY |
LARRY DOESCHER
602-712-7551 |
TBD | TBD |
| 93 | MO | 125.0 | H859501D | K | MEDLIN CROSSOVER | DP1M | DESIGN AND CONSTRUCT NEW CROSSOVER |
LARRY DOESCHER
602-712-7551 |
Design | Design |
| 93 | MO | 139.0 | H835401D | K | US 93, SB BURRO CREEK BRIDGE | KK1L | SYSTEM PRESERVATION - ENGINEERING |
LARRY DOESCHER
602-712-7551 |
11/18/2013 | |
| 93 | YV | 185.3 | H858301D | P | SOUTH OF SR71 - NORTH OF SR89 | FK1M | DESIGN ROADWAY WIDENING |
VIVIAN LI
602-712-8708 |
05/15/2014 | 8/14/2015 |
| 95 | YU | 0.0 | H800301C | Y | INTERNATIONAL BORDER - JUAN SANCH | KM1K | INFRASTRUCTURE IMPROVEMENTS |
PAUL PATANE
928-317-2115 |
TBD | TBD |
| 95 | YU | 32.0 | H459901C | Y | AVE 9E TO FORTUNA WASH BRIDGE | NW1L | WIDEN ROADWAY AND CONSTRUCT NEW BRIDGE |
FAKHRADIN HAKARI
602-712-7468 |
06/29/2015 | 6/30/2015 |
| 95 | LA | 142.0 | H848901D | Y | SR 95 AT MOHAVE ROAD | WY1L | DESIGN |
JIM REEVES
602-712-8283 |
Design | Design |
| 95 | LA | 149.2 | H8492H1D | Y | CIENEGA SPRINGS RD | XL1L | SB LEFT TURN LANE |
JIM REEVES
602-712-8283 |
03/31/2014 | 4/30/2014 |
| 95 | YU | 154.9 | H851301D | Y | BUCKSKIN MOUNTAIN STATE PARK | XY1L | DESIGN |
MIKE ANDAZOLA
602-712-7629 |
Design | Design |
| 95 | MO | 182.0 | H851201D | K | LAKE HAVASU STATE PARK (CONTACT P | XH1L | DESIGN STATE PARK ACCESS ROAD |
MIKE ANDAZOLA
602-712-7629 |
Design | Design |
| 95 | MO | 182.0 | K | LAKE HAVASU STATE PARK (CONTACT P | XQ1L | DESIGN PARKING |
MIKE ANDAZOLA
602-712-7629 |
Design | Design | |
| 95 | MO | 184.0 | H819301C | K | LAKE HAVASU STATE PARK | WE1K | DESIGN PARKING LOT & BOAT LAUNCH RAMPS |
MIKE ANDAZOLA
602-712-7629 |
Design | Design |
| 95 | MO | 190.0 | H846301D | K | SR 95, MP 190 TO MP 200 | SK1L | FENCING |
MIKE ANDAZOLA
602-712-7629 |
Design | Design |
| 95 | MO | 190.0 | H451101C | K | LAKE HAVASU TO I-40 | QN1F | DESIGN CLIMBING LANE |
MIKE ANDAZOLA
602-712-7629 |
Design | Design |
| 95 | MO | 239.0 | H8616CAX | K | SR 95 @ VALENCIA ROAD | HH1M | DESIGN |
JOHN HOANG
602-712-6694 |
Design | Design |
| 95 | MO | 239.5 | HX23701D | K | SR 95 @ STERLING RD | SL1L | DESIGN NEW TRAFFIC SIGNAL |
JOHN HOANG
602-712-6694 |
Design | Design |
| 95 | MO | 250.0 | H859801D | K | AVIATION WAY - BULLHEAD CITY PARK | EJ1L | PE PH 1 & 2 TO CONSTRUCT CONCRETE MEDIAN ISLAND |
LARRY DOESCHER
602-712-7551 |
Design | Design |
| 101L | MA | 1.0 | H858801C | E | I-10 TO I-17 | EP1M | CONSTRUCT FMS |
LYDIA WARNICK
602-712-4281 |
TBD | TBD |
| 101L | MA | 23.0 | H829701L | E | SR 101L PIMA (I-17-PRINCESS DR) G | OP1L | CAPACITY ADDITIONS - ENGINEERING |
RON MCCALLY
602-712-7646 |
TBD | TBD |
| 101L | MA | 23.5 | E | I-17 TO TATUM BLVD | DD1J | DESIGN HOV LANE |
RON MCCALLY
602-712-7646 |
Design | Design | |
| 101L | MA | 41.0 | H848401C | E | SHEA BLVD TO CHAPARRAL ROAD | WY1K | CONSTRUCT GPL |
RON MCCALLY
602-712-7646 |
02/03/2014 | 4/4/2014 |
| 101L | MA | 46.0 | H849901D | E | SR101L, CHAPARRAL ROAD TO SR202L | VX1L | GP LANES |
RON MCCALLY
602-712-7646 |
01/06/2014 | 2/10/2014 |
| 101L | MA | 50.7 | H8341CAX | E | RED MOUNTAIN - CHANDLER BLVD | TL1L | SIGN REHABILITATION |
TOM TORTICE
602-712-7995 |
TBD | TBD |
| 143 | MA | 3.8 | HX21001C | E | SR 143, 48TH STREET - MCDOWELL R | VD1J | SIGN REPLACEMENT |
AHMADSHAH SHIR
602-712-7497 |
IGA | IGA |
| 160 | CN | 343.4 | H803701D | F | TONALEA | FN1L | INSTALL INTERSECTION LIGHTING |
GEORGE WALLACE
928-779-7580 |
TBD | TBD |
| 160 | NA | 375.2 | H512001C | H | JCT SR 564 - TSEGI, PH I | RJ1C | CONSTRUCT DUAL PASSING LANES |
GEORGE WALLACE
928-779-7580 |
05/28/2013 | 2/28/2013 |
| 160 | AP | 429.0 | H849001D | H | CHINLE WASH BRIDGE #746 | XB1L | DESIGN |
SHENG-YUNG HSU
602-712-8613 |
Design | Design |
| 163 | NA | 396.1 | H845501D | H | LAGUNA WASH BRIDGE #25 | RF1L | DESIGN |
SHENG-YUNG HSU
602-712-8613 |
Design | Design |
| 169 | MA | 4.5 | H857201D | P | SR 169 AT CHERRY/ORME ROAD | DR1M | DESIGN FOR INTERSECTION IMPROVEMENT |
VIVIAN LI
602-712-8708 |
TBD | TBD |
| 169 | YV | 9.3 | H851601D | P | SR 169 CHERRY CREEK / OLD CHERRY | DS1M | DESIGN INTERSECTION IMPROVEMENT |
VIVIAN LI
602-712-8708 |
TBD | TBD |
| 180 | CN | 216.1 | H7774S1D | F | NAVAJO RD - FLAGSTAFF CITY LIMITS | KZ1K | WIDENING, C&G & DRAINAGE IMPROVEMENTS |
GEORGE WALLACE
928-779-7580 |
TBD | TBD |
| 180 | CN | 216.2 | H811801C | F | COLUMBUS AVENUE - SNOW BOWL | RT1K | RR 3" & AR-ACFC & TURN LANES |
HIREN SHAH
602-712-7794 |
10/31/2013 | 11/29/2013 |
| 180 | AP | 338.0 | H752001C | G | BEAVER DAM - RANCH (EB & WB) | MQ1J | 3" CIPR & FR |
YUMI SHAPIRO
602-712-7983 |
07/31/2013 | 1/10/2014 |
| 180 | AP | 386.3 | H8127S1D | G | GENERATING STATION ROAD - JCT US | SF1K | RR 3" & CHIP SEAL |
ORRIN SHAW
602-712-8541 |
TBD | TBD |
| 180 | AP | 402.0 | H717201D | G | JCT SR 260 / US 180 & RODEO GROUN | XT1H | REALIGN INTERSECTION |
EVELYN MA
602-712-6660 |
Hold | Hold |
| 180 | AP | 403.5 | H842701D | G | EAGAR - ALPINE | GQ1M | DESIGN FENCE REPLACEMENT |
EVELYN MA
602-712-6660 |
Design | Design |
| 180 | AP | 407.0 | H8128S1D | G | JUAN CARILLO - FH275 | SG1K | RR 3" AC & AR-ACFC |
ORRIN SHAW
602-712-8541 |
TBD | TBD |
| 186 | CH | 328.2 | H815701D | S | WILLCOX TO KANSAS SETTLEMENT | ST1K | R & R 3" AC & CHIP SEAL |
MEHRAN SALEHI
602-712-7637 |
01/03/2014 | 3/3/2014 |
| 188 | GI | 240.0 | H859601D | G | WINDY HILL | DT1M | INSTALL DRAINAGE FACILITY CBC |
EVELYN MA
602-712-6660 |
08/01/2013 | 9/6/2013 |
| 188 | GI | 254.1 | H620101D | G | ROOSEVELT - PUNKIN CENTER | OT1F | DRAINAGE REPAIR AND PAVEMENT PRESERVATION |
MIKE ANDAZOLA
602-712-7629 |
TBD | TBD |
| 191 | CH | 25.5 | H865201C | S | W. GLEESON RD. TO E. SUNIZONA DR. | NX1M | DESIGN PAVEMENT PRESERVATION |
KEVIN ROBERTSON
602-712-3131 |
Design | Design |
| 191 | CH | 38.2 | H812401C | S | JCT SR 181 - PEARCE ROAD | SC1K | 3" AC & AR-ACFC & SHOULDER WIDENING |
HIREN SHAH
602-712-7794 |
05/28/2013 | 5/24/2013 |
| 191 | CH | 61.5 | H788301C | S | COCHISE POWER PLANT - JCT I-10 | AI1K | RR 2" AC + 3" AC + FR |
YUMI SHAPIRO
602-712-7983 |
TBD | TBD |
| 191 | GH | 100.7 | S | SR 266 TO ARTESIA | MG1E | DESIGN PARALLEL ROADWAY |
STEPHEN WILSON
520-388-4263 |
Design | Design | |
| 191 | GH | 101.0 | S | MP 100.7 TO SR 266 | DU1M | DESIGN PARALLEL ROADWAY |
STEPHEN WILSON
520-388-4263 |
Design | Design | |
| 191 | GH | 104.0 | S | SR 266 TO US 70 (REALIGNMENT) | DV1M | SCOPING |
STEPHEN WILSON
520-388-4263 |
Design | Design | |
| 191 | GH | 120.3 | H832401L | S | RELATION ST TO JCT US70 | IS1L | INTERSECTION IMPROVEMENT |
STEPHEN WILSON
520-388-4263 |
TBD | TBD |
| 191 | GE | 184.5 | H841201C | S | GREY PEAK TO JUAN MILLER ROAD | NF1L | PAVEMENT PRESERVATION (DOUBLE CHIP SEAL) |
KEVIN ROBERTSON
602-712-3131 |
03/22/2013 A | 4/22/2013 |
| 191 | GE | 226 | H843901C | G | US-191, GLOBE DISTRICT, WALLOW FI | GA1M | SYSTEM PRESERVATION (RESTORATION/REHAB/RESURFACE) |
ORLANDO JEREZ
602-712-7187 |
Design | Design |
| 191 | AP | 247.8 | H842501D | G | ALPINE AREA | GP1M | DESIGN FENCE REPLACEMENT |
EVELYN MA
602-712-6660 |
Design | Design |
| 191 | CH | 331.0 | H853401D | S | I-10/ US 191 TI AT MP 331 | ZA1J | CONSTRUCT IMPROVEMENTS |
STEPHEN WILSON
520-388-4263 |
TBD | TBD |
| 191 | AP | 345.0 | H | SANDERS - WITCH WELLS | DW1M | FENCING & CATTLE GUARDS |
GIULY CACERES
602-712-8654 |
TBD | TBD | |
| 191 | AP | 418.0 | H | BURNSIDE - CHINLE | DX1M | FENCING & CATTLE GUARDS |
GIULY CACERES
602-712-8654 |
TBD | TBD | |
| 191 | AP | 446.4 | H543801C | H | CHINLE - SOUTH | EB1E | ROADWAY WIDENING |
GEORGE WALLACE
928-779-7580 |
03/22/2013 A | 4/24/2013 |
| 191 | AP | 462.5 | H8592CAX | H | MANY FARMS - APACHE CO. RD 508 | DY1M | FENCING WIDENING |
JAYA VELAGAPUDI
602-712-7653 |
05/01/2014 | 6/2/2014 |
| 191 | AP | 477.9 | H8593CAX | H | JCT N12 TO JCT US-160 | QC1L | REPLACE FENCE AND CATTLE GUARDS |
JAYA VELAGAPUDI
602-712-7653 |
05/01/2014 | 6/2/2014 |
| 191 | AP | 482.0 | H813201C | H | ROUND ROCK - JCT. US 160 | SK1K | 3" AC & AR-ACFC |
YUMI SHAPIRO
602-712-7983 |
01/02/2014 | 2/3/2014 |
| 202L | MA | 0.0 | E | 24TH ST - 17TH AVE, SEGMENT 2 | EQ1M | DESIGN NEW FREEWAY |
STEVE BEASLEY
602-712-7645 |
Design | Design | |
| 202L | MA | 0.0 | E | I-10 PAPAGO/ SR202L SYSTEM INTERC | ET1M | DESIGN NEW SYSTEM TI |
CHAUN HILL
602-712-6268 |
Design | Design | |
| 202L | MA | 0.0 | E | ELLIOT RD - BASELINE RD, SEGMENT | ER1M | DESIGN NEW FREEWAY |
CHAUN HILL
602-712-6268 |
Design | Design | |
| 202L | MA | 0.0 | E | BASELINE - SALT RIVER, SEGMENT 6 | NX1L | CONSTRUCT NEW FREEWAY |
CHAUN HILL
602-712-6268 |
TBD | TBD | |
| 202L | MA | 0.0 | E | PUMP STATION | FG1M | FLOOD EROSION CONTROL |
STEVE BEASLEY
602-712-7645 |
TBD | TBD | |
| 202L | MA | 0.0 | E | I-10 MARICOPA - 24TH ST, SEGMENT | ES1M | CONSTRUCT NEW FREEWAY |
CHAUN HILL
602-712-6268 |
TBD | TBD | |
| 202L | MA | 0.0 | E | I-10 EAST/SANTAN TI TO 51ST AVE | TY1H | DESIGN ROADWAY |
CHAUN HILL
602-712-6268 |
TBD | TBD | |
| 202L | MA | 0.0 | E | SALT RIVER BRIDGE, SEGMENT 7 | WW1K | CONSTRUCT NEW FREEWAY |
CHAUN HILL
602-712-6268 |
TBD | TBD | |
| 202L | MA | 0.0 | E | 17TH AVE TO 51ST AVE, SEGMENT 3 | WZ1K | CONSTRUCT NEW FREEWAY |
CHAUN HILL
602-712-6268 |
TBD | TBD | |
| 202L | MA | 9.0 | H8169S1D | E | SR 101 TO GILBERT ROAD | YR1K | DESIGN GENERAL PURPOSE LANES |
RON MCCALLY
602-712-7646 |
Design | Design |
| 202L | MA | 9.0 | H854301C | E | L101 TO MCDOWELL ROAD | YM1L | SYSTEM PRESERVATION (RESTORATION/REHAB/RESURFACE) |
MAFIZ MIAN
602-712-4061 |
05/28/2013 | 6/3/2013 |
| 202L | MA | 9.0 | H854201C | E | L101 TO MCDOWELL RD - EB | YL1L | PAVEMENT PRESERVATION (AR-ACFC) |
KEVIN ROBERTSON
602-712-3131 |
05/28/2013 | 6/3/2013 |
| 202L | MA | 43.0 | E | VAL VISTA DR. - DOBSON RD | XC1K | CONSTRUCT FMS |
FARZANA YASMIN
602-712-8328 |
TBD | TBD | |
| 202L | MA | 44.0 | E | LINDSAY ROAD TO GILBERT ROAD | ST1H | DESIGN & CONST MULTI-USE PATH |
AMY RITZ
602-712-4691 |
TBD | TBD | |
| 202L | MA | 47.8 | H860001D | E | DOBSON ROAD TO I-10, MARICOPA | TX1H | CONSTRUCT FMS |
JON LOVELL
602-712-7754 |
TBD | TBD |
| 202L | MA | 54.0 | E | SALT RIVER - BUCKEYE ROAD SEGMENT | UF1H | CONSTRUCT NEW FREEWAY |
CHAUN HILL
602-712-6268 |
TBD | TBD | |
| 210 | PM | 1.0 | H8554CAX | T | AVIATION CORRIDOR IN TUCSON | CX1M | SIGN REHABILITATION |
ABDULKARIM RASHID
602-712-7602 |
TBD | TBD |
| 260 | YV | 211.2 | H8410CAX | P | THOUSAND TRAILS ROAD | DZ1M | NEW TAPERS TO STANDARD |
VIVIAN LI
602-712-8708 |
TBD | TBD |
| 260 | YV | 218.5 | H804601D | P | THOUSAND TRAILS TO I-17 | XD1K | CONSTRUCT INTERIM IMPROVEMENTS |
JOHN DICKSON
602-712-8683 |
TBD | TBD |
| 260 | YV | 218.7 | H8625CAX | P | SR 260 AT INDUSTRIAL DRIVE IN CAM | EA1M | ROUNDABOUT |
VIVIAN LI
602-712-8708 |
11/03/2014 | 12/1/2014 |
| 260 | YV | 218.9 | HX240T1D | P | SR 260; INDUSTRIAL DR - HOMESTEAD | BK1M | DESIGN |
VIVIAN LI
602-712-8708 |
Design | Design |
| 260 | GI | 258.0 | P | LION SPRINGS SECTION | LY1C | RECONSTRUCT TO A 4-LANE DIVIDED |
JOHN DICKSON
602-712-8683 |
TBD | TBD | |
| 260 | GI | 268.3 | H863701C | P | TONTO CREEEK BRIDGE TO WILDLIFE U | EB1M | REPAIR APPROACH SLAB |
VIVIAN LI
602-712-8708 |
06/03/2013 | 6/28/2013 |
| 260 | NA | 282.5 | H824501D | P | RIM RD TO GIBSON RD, SEGMENTS 1, | MQ1L | SHOULDER WIDENING PROGRAM, PE PH 1 & 2 |
RON FOLUCH
602-712-8116 |
Design | Design |
| 260 | NA | 321.4 | H812901D | G | COTTONWOOD WASH - SHOW LOW | SH1K | RR 3" AC & AR-ACFC |
MEHRAN SALEHI
602-712-7637 |
01/15/2014 | 3/10/2014 |
| 260 | NA | 328.0 | H854801D | G | MORTENSEN WASH BRIDGE #1641 | ZH1L | DESIGN |
NICHOLAS FIALA
602-712-7453 |
Design | Design |
| 260 | AP | 385.5 | H842401D | G | EAGAR AREA | GO1M | DESIGN FENCE REPLACEMENT |
EVELYN MA
602-712-6660 |
Design | Design |
| 260 | AP | 394.0 | H826901C | G | LITTLE COLORADO RIVER BR (STR # 4 | CD1L | SYSTEM PRESERVATION - MINOR BRIDGE REHABILITATION |
PE-SHEN YANG
602-712-8606 |
TBD | TBD |
| 264 | NA | 361.0 | H856801C | H | EAST OF COCONINO & NAVAJO COUNTY | ZR1L | PAVEMENT PRESERVATION (CHIP SEAL) |
KEVIN ROBERTSON
602-712-3131 |
Design | Design |
| 264 | NA | 402.0 | H647401C | H | KEAMS CANYON TRADING POST | BX1G | DESIGN |
GIULY CACERES
602-712-8654 |
Design | Design |
| 264 | AP | 441.0 | H | BURNSIDE - SUMMIT | ED1M | FENCE & CATTLE GUARD |
GIULY CACERES
602-712-8654 |
TBD | TBD | |
| 264 | AP | 441.1 | H824601C | H | BURNSIDE TO FISH WASH | HR1L | DESIGN |
GIULY CACERES
602-712-8654 |
Design | Design |
| 264 | AP | 446.0 | H676801D | H | GANADO WASH BRIDGE #1046 | XX1G | DESIGN BRIDGE REPLACEMENT |
KEN RUFFENNACH
602-712-8938 |
Design | Design |
| 264 | AP | 446.0 | H | GANADO SECTION | EE1M | WIDENING TO 3 LANES & TL |
KEN RUFFENNACH
602-712-8938 |
TBD | TBD | |
| 264 | AP | 450.0 | H8133S1D | H | FISH WASH - CROSS CANYON | SL1K | 2" AC & AR-ACFC |
GIULY CACERES
602-712-8654 |
TBD | TBD |
| 264 | AP | 459.0 | H786301C | H | CROSS CANYON - SUMMIT | AE1K | 2" AC & AR-ACFC |
GIULY CACERES
602-712-8654 |
TBD | TBD |
| 266 | GH | 104.0 | H862101C | S | JCT 191 - BONITA | EF1M | CONSTRUCT CHIP SEAL & GR RENEWAL |
STEPHEN WILSON
520-388-4263 |
05/28/2013 | 6/14/2013 |
| 277 | NA | 334.0 | H671701C | G | SR 277 CULVERTS | TB1C | CONST OF CONCRETE BOX CULVERTS |
LYNN SUGIYAMA
602-712-6883 |
IGA | IGA |
| 286 | PM | 20.0 | H690701C | T | SR 286 (SASABE - ROBLES RANCH HWY | JC1H | REPAIR HEADCUTTING PROBLEMS AT LW WATER CROSSINGS |
ROBIN RAINE
520-388-4264 |
TBD | TBD |
| 288 | GI | 260 | H859701D | G | ROOSEVELT - YOUNG | EG1M | CBC EXTENSION |
EVELYN MA
602-712-6660 |
02/14/2014 | 3/10/2014 |
| 288 | GI | 288.8 | H861701D | G | SOUTH OF YOUNG | EH1M | ROCKFALL MITIGATION |
CARMELO ACEVEDO
602-712-4511 |
02/17/2015 | 3/17/2015 |
| 303L | MA | 0.0 | E | US 60 GRAND AVE / SR 303L TI, INT | EW1M | LANDSCAPE CONSTRUCTION |
JOE SALAZAR
602-712-7357 |
TBD | TBD | |
| 303L | MA | 0.0 | E | I-10/303L TI, PHASE I (I-10 REALI | NU1L | CONSTRUCT LANDSCAPE |
JOE SALAZAR
602-712-7357 |
TBD | TBD | |
| 303L | MA | 3.8 | H7194S1D | E | SR 303L, RIGGS RD - SR 801 | IZ1K | SYSTEM ENHANCEMENT-ENGINEERING |
BHARAT KANDEL
602-712-8736 |
TBD | TBD |
| 303L | MA | 5.0 | H687001L | E | I-10, MC 85 TO I-10 | MZ1H | NEW 303 EXTENSION SOUTH |
BHARAT KANDEL
602-712-8736 |
TBD | TBD |
| 303L | MA | 103.2 | H857701D | E | I-10/303L TI, PHASE II | EV1M | CONSTRUCT NEW FREEWAY |
ERIC PROSNIER
602-712-8495 |
TBD | TBD |
| 303L | MA | 105.0 | H850401C | E | THOMAS ROAD TO CAMELBACK ROAD | OE1L | CONSTRUCT LANDSCAPE |
AMY RITZ
602-712-4691 |
TBD | TBD |
| 303L | MA | 107.0 | H860201D | E | CAMELBACK ROAD TO GLENDALE AVENUE | OB1L | CONSTRUCT LANDSCAPE |
BHARAT KANDEL
602-712-8736 |
05/01/2014 | 6/2/2014 |
| 303L | MA | 109.0 | H860301C | E | GLENDALE AVE TO PEORIA AVE | OC1L | CONSTRUCT LANDSCAPE |
RON MCCALLY
602-712-7646 |
05/01/2014 | 6/2/2014 |
| 303L | MA | 112.0 | H833101D | E | PEORIA AVE - WADDELL RD | WB1L | LANDSCAPE CONSTRUCTION |
JOE SALAZAR
602-712-7357 |
05/28/2013 | 6/7/2013 |
| 303L | MA | 114.0 | H833201D | E | WADDELL ROAD TO MOUNTAIN VEIW ROA | OF1L | CONSTRUCT LANDSCAPE |
JOE SALAZAR
602-712-7357 |
04/29/2013 A | 6/28/2013 |
| 303L | MA | 118.0 | H814501C | E | US 60 GRAND AVE / SR 303L TI, INT | XE1K | CONSTRUCT INTERIM TI |
BHARAT KANDEL
602-712-8736 |
11/30/2012 A | 12/6/2012 |
| 303L | MA | 120.0 | H857601D | E | EL MIRAGE RD | EU1M | DESIGN TI |
MOHAMMAD A. ZAID
602-712-8467 |
Design | Design |
| 347 | PN | 172.0 | HX24601D | T | ALTERRA TO CASA BLANCA RD, CITY O | CY1M | DESIGN |
ABDULKARIM RASHID
602-712-7602 |
Design | Design |
| 387 | PN | 0.0 | H810901C | T | JCT SR 84 / SR 287 TO SANTA CRUZ | QE1K | RR 4" TL, 3" PL & FOG COAT |
RAY LEON
602-712-7712 |
05/28/2013 | 6/28/2013 |
| 387 | PN | 0.7 | H855501C | T | SR 387 AT SAN CARLOS TRAIL, SCHOO | ZJ1L | CONSTRUCT PEDESTRIAN HYBRID BEACON |
PHILIP SCHAFFER
602-712-6845 |
05/28/2013 | 6/3/2013 |
| 801 | MA | 0.0 | H7216S1D | E | SR 801, SR 85 TO SR 303L | YH1H | NEW ROADWAY CONSTRUCTION |
OWEN MILLS
602-712-8695 |
TBD | TBD |
| 801 | MA | 0.0 | H687601L | E | SR 303L TO SR 202L | JG1H | STUDY |
OWEN MILLS
602-712-8695 |
TBD | TBD |
| 888 | MA | 0.0 | H813801C | E | VARIOUS LOCATIONS ON SR 101L AND | VX1K | PUMP STATION IMPROVEMENTS |
MONICA BAIZA
602-712-4711 |
04/23/2013 A | 5/23/2013 |
| 940 | MA | 0.0 | SR19201C | E | 5TH ST (TEMPE) 741-560-C | WL1L | AT-GRADE RAILROAD CROSSING DESIGN |
ROBERT TRAVIS
602-712-6193 |
05/28/2013 | 6/17/2013 |
| 940 | MA | 0.0 | SR19101C | E | UNIVERSITY DR (TEMPE) 741-561J | WK1L | AT-GRADE RAILROAD CROSSING DESIGN |
ARMANDO LOPEZ
602-712-8747 |
09/27/2013 | 2/19/2014 |
| 999 | SW | 0.0 | H8510H1D | P | STATEWIDE FLEXIBLE DELINEATORS & | ZB1L | DESIGN FLEXIBLE DELINEATORS & MILE POST SIGNS |
RON FOLUCH
602-712-8116 |
Design | Design |
| 999 | SW | 0.0 | STATEWIDE EROISION CONTROL | YV1L | DESIGN EROSION AND SEDIMENT CONTROL |
MICHAEL DENBLEYKER
602-712-7808 |
Design | Design | ||
| 999 | SW | 0.0 | H862401L | ROADWAY DEPARTURE IMPLEMENTATION | NI1M | SCOPING |
RON FOLUCH
602-712-8116 |
Design | Design | |
| 999 | SW | 0.0 | H858901C | E | STATEWIDE DYNAMIC MESSAGE SIGN (D | FN1M | SYSTEM ENHANCEMENT (TRAFFIC MGMT AND ENGINEERING) |
JON LOVELL
602-712-7754 |
05/28/2013 | 5/31/2013 |
| 999 | PN | 0.0 | H745401L | T | NORTH - SOUTH CORRIDOR STUDY | PN1J | DCR PLUS EIS |
ASADUL KARIM
602-712-6799 |
Design | Design |
| 999 | MA | 0.0 | H828101C | E | ALMERIA RD FROM 30TH AVE & 40TH A | MN1L | SYSTEM ENHANCEMENT - OTHER ENHANCEMENTS |
PHIL JESELNIK
602-712-6685 |
08/02/2013 | 8/12/2013 |
| 999 | SW | 0.0 | H821701C | Y | BURNT WELL AND EHRENBURG REST ARE | YJ1K | WATER,STRUCTURAL,MECH & ELECTRICAL REHAB |
GIOVANNI NABAVI
602-712-7486 |
10/31/2013 | 11/1/2013 |
| 999 | MA | 0.0 | H8320CAX | E | VARIOUS LOCATIONS | QH1L | DRAINAGE TUNNEL IMPROVEMENTS |
MONICA BAIZA
602-712-4711 |
TBD | TBD |
| 999 | SW | 0.0 | H821301C | T | SACATON & CANOA RANCH REST AREAS | YC1K | WATER/WASTEWATER, STRUC & ELECTICAL REHAB |
GIOVANNI NABAVI
602-712-7486 |
TBD | TBD |
| 999 | SW | 0.0 | H853001D | E | STATEWIDE DYNAMIC MESSAGE SIGN PH | XX1L | CONSTRUCT DYNAMIC MESSAGE SIGNS |
JON LOVELL
602-712-7754 |
TBD | TBD |
| 999 | SW | 0.0 | H826301C | K | HAVILAND & MARBLE CANYON REST ARE | BU1L | STRUCTURAL REHABILITATION |
GIOVANNI NABAVI
602-712-7486 |
TBD | TBD |
| 999 | SW | 0.0 | H8531CAX | X | STATEWIDE DYNAMIC MESSAGE SIGN PH | EJ1M | CONSTRUCT DYNAMIC MESSAGE SIGNS |
JON LOVELL
602-712-7754 |
TBD | TBD |
| 999 | SW | 0.0 | H8459CAX | X | STATEWIDE | EI1M | GUARDRAIL DELINEATORS |
RON FOLUCH
602-712-8116 |
TBD | TBD |
| 999 | SW | 0.0 | H820601C | E | STATEWIDE TREE THINNING | XV1K | TREE REMOVAL FROM CLEAR ZONE, PE PH 1 & 2 |
RON FOLUCH
602-712-8116 |
Design | Design |
| 999 | SW | 0.0 | H829801C | Y | STATEWIDE/YUMA | FX1L | SYSTEM PRESERVATION - ENGINEERING |
MARWAN AOUAD
602-712-7949 |
Design | Design |
| 999 | SW | 32.9 | H846601D | X | CANOA RANCH, SACATON & MCGUIREVIL | SN1L | DESIGN ELECTRONIC SCREENING EQUIPMENT |
MICHAEL DENBLEYKER
602-712-7808 |
Design | Design |
| 0000 | YU | 0.0 | SL64401C | Y | US 96 BETWEEN SOMERTON AND BINGHA | HS1K | SYSTEM ENHANCEMENT-OTHER ENHANCEMENTS |
GREGORY JOHNSON
602-712-7774 |
TBD | TBD |
| 0000 | MA | 0.0 | SR23201C | E | DOBSON ROAD, AAR/DOT NO. 741-649- | WJ1L | SYSTEM ENHANCEMENT-SAFETY IMPROVEMENTS |
ROBERT TRAVIS
602-712-6193 |
06/28/2013 | 8/26/2013 |
| 0000 | PN | APJ | SH57601C | M | IRONWOOD DRIVE, BASELINE - ELLIIO | LL1M | DESIGN SAFETY PULLOUTS |
JIM REEVES
602-712-8283 |
Design | Design |
| 0000 | MA | BKY | SZ00101C | E | PAVE UNPAVED RD 7TH ST. NORTON DR | RX1L | PAVE UNPAVED ROAD |
TRENT KELSO
602-712-4368 |
06/27/2013 | 6/28/2013 |
| 0000 | CN | CCN | SH52801C | F | LEUPP ROAD,TOWNSEND-WINONA ROAD T | HN1M | DESIGN SAFETY IMPROVEMENTS |
RON FOLUCH
602-712-8116 |
Design | Design |
| 0000 | CN | CCN | SS94201C | F | LAKE MARY RD TREE REMOVAL CLEAR Z | AU1L | TREE REMOVAL |
JIM REEVES
602-712-8283 |
05/28/2013 | 6/3/2013 |
| 0000 | MA | CHN | SS93201C | E | CONSOLIDATED CANAL MULTI-USE PATH | XX1K | PATHWAY/TRAIN IMPROVEMENTS |
SUSAN ANDERSON
602-712-7607 |
TBD | TBD |
| 0000 | MO | CLC | SS87801C | F | JOHNSON AVENUE | OD1K | PAVEMENT PRESERVATION |
PAUL PATANE
928-317-2115 |
06/18/2013 | 5/31/2013 |
| 0000 | PN | CLG | SS87301C | T | COOLIDGE AVENUE | MB1K | DESIGN / RECONSTRUCTION |
JEFFREY DAVIDSON
602-712-8534 |
03/12/2014 | 4/9/2014 |
| 0000 | YV | CWD | SH58701C | P | CITY OF COTTONWOOD PAVEMENT MARKI | NN1M | UPGRADE PAVEMENT MARKINGS |
TRENT THATCHER
602-712-4544 |
05/28/2013 | 6/3/2013 |
| 0000 | YV | CYM | SH47601C | P | CENTRAL YAV METRO ORGZ--CYMPO VAR | LT1L | SIGN REPLACEMENT |
JIM REEVES
602-712-8283 |
05/28/2013 | 6/3/2013 |
| 0000 | CH | DGS | SS87401C | S | CHINO ROAD | YS1K | NEW FACILITIES - CONSTRUCTION OF NEW ROADS |
STEPHEN WILSON
520-388-4263 |
05/29/2014 | 6/2/2014 |
| 0000 | MA | ELM | SH54801C | E | CITY OF EL MIRAGE SIGN UPGRADE | JS1M | REPLACE SIGNS |
JIM REEVES
602-712-8283 |
05/28/2013 | 6/3/2013 |
| 0000 | CN | FLA | SH50801C | F | BEULAH BLVD, CITY OF FLAGSTAFF | LZ1M | DESIGN BIKE LANES |
KAVEH BEHBAHANI
602-712-8895 |
Design | Design |
| 0000 | MA | GDY | SS89601C | E | TRAFFIC SIGNAL SYSTEM | PK1K | ITS BACKBONE & COMMUNICATION |
JEFFREY DAVIDSON
602-712-8534 |
05/31/2013 | 6/28/2013 |
| 0000 | MA | GDY | SS54401C | E | YUMA RD @ BULLARD WASH | ZQ1F | CONST BOX CULVERTS |
JEFFREY DAVIDSON
602-712-8534 |
TBD | TBD |
| 0000 | GI | GGI | SS98101C | G | GILA COUNTY VARIOUS ROADS: THERMO | LN1L | PAVEMENT MARKING |
SUSAN ANDERSON
602-712-7607 |
03/22/2013 A | 4/22/2013 |
| 0000 | GI | GGI | SS71803D | G | TONTO CREEK BRIDGE | VK1J | DESIGN BRIDGE APPROACHES |
JEFFREY DAVIDSON
602-712-8534 |
05/31/2013 | 6/28/2013 |
| 0000 | GI | GGI | SH48601C | G | GILA COUNTY VARIOUS RUAL ROADS PA | LM1L | PAVEMENT MARKING |
SETH CHALMERS
602-712-7874 |
03/22/2013 A | 4/22/2013 |
| 0000 | MA | GLN | SS84601C | E | NEW RIVER (EAST BANK) - MULTI-USE | JR1K | MULTI-USE PATH IMPROVEMENTS |
ROBERT KNIGHTEN
602-712-7615 |
05/30/2013 | 6/3/2013 |
| 0000 | GI | ISC | SH57501C | S | BIA ROUTE 6, US70-SR170 ON SAN CA | NK1M | DESIGN ROADWAY SAFETY IMPROVEMENTS |
KAVEH BEHBAHANI
602-712-8895 |
Design | Design |
| 0000 | LA | LLA | SS96201C | K | ALAMO ROAD MP 9 - MP 10.3 | HD1L | CONSTRUCT NEW GUARDRAIL |
PAUL PATANE
928-317-2115 |
06/13/2013 | 6/3/2013 |
| 0000 | MA | MES | SS89101C | E | ITS TRAFFIC SIGNAL CONVERSIONS - | PI1K | FIBER-OPTIC COMMUNICATIONS NET |
JEFFREY DAVIDSON
602-712-8534 |
TBD | TBD |
| 0000 | MA | MES | SS87701C | E | LOCAL AGENCY WIDE - FIBER-OPTIC C | OC1K | FIBER OPTICS |
JEFFREY DAVIDSON
602-712-8534 |
05/31/2013 | 6/28/2013 |
| 0000 | MA | MMA | SS97201C | E | UPGRADE RADS | JN1L | REGIONWIDE SYSTEM UPGRADE |
SUSAN ANDERSON
602-712-7607 |
05/31/2013 | 6/28/2013 |
| 0000 | MA | MMA | SR24901C | E | AVONDALE AVE @ UNION PACIFIC RR S | QH1M | DESIGN RAILROAD CROSSING IMPROVEMENT |
ROBERT TRAVIS
602-712-6193 |
Design | Design |
| 0000 | MA | MMA | SS89901C | E | 87TH AVENUE | PL1K | PAVING DIRT ROAD |
SUSAN ANDERSON
602-712-7607 |
TBD | TBD |
| 0000 | MA | MMA | SS97401C | E | ATIS ENHANCEMENTS | JP1L | REGIONWIDE ARTERIAL ATIS |
SUSAN ANDERSON
602-712-7607 |
05/28/2013 | 6/3/2013 |
| 0000 | MA | MMA | SS95701C | E | 88TH AVE: DEER VALLEY TO WILLIAMS | CC1L | PAVE UNPAVED ROAD |
SUSAN ANDERSON
602-712-7607 |
TBD | TBD |
| 0000 | MA | MMA | SS60503D | E | RIGGS RD,ELLSWORTH TO MERIDIAN | KQ1H | CONSTRUCT NEW ROADWAY |
SUSAN ANDERSON
602-712-7607 |
TBD | TBD |
| 0000 | MA | MMA | SS97301C | E | WEST VALLEY DMS | JO1L | INSTALL ARTERIAL DMS |
SUSAN ANDERSON
602-712-7607 |
05/28/2013 | 4/1/2013 |
| 0000 | MA | MMA | SS83001C | E | OLIVE AVE: LITCHFIELD ROAD TO LOO | BB1L | INSTALL FIBER OPTIC CONDUIT |
SUSAN ANDERSON
602-712-7607 |
TBD | TBD |
| 0000 | MA | MMA | SS89301C | E | DOBSON ROAD BRIDGE | PH1K | CONSTRUCT BRIDGE OVER THE SALT RIVER |
SUSAN ANDERSON
602-712-7607 |
TBD | TBD |
| 0000 | MA | MMA | SS87901C | E | GILBERT ROAD BRIDGE OVER THE SALT | OA1K | CONSTRUCT BRIDGE |
SUSAN ANDERSON
602-712-7607 |
TBD | TBD |
| 0000 | MA | MMA | SS88101C | E | MCKELLIPS ROAD - SR101L TO ALMA S | OB1K | ROADWAY RECONSTRUCTION |
SUSAN ANDERSON
602-712-7607 |
TBD | TBD |
| 0000 | MA | MMA | SS89401C | E | MCKELLIPS ROAD BRIDGE | PG1K | CONSTRUCT BRIDGE OVER THE SALT RIVER |
SUSAN ANDERSON
602-712-7607 |
TBD | TBD |
| 0000 | PM | MRN | SB41301C | T | INA BRIDGE OVER SANTA CRUZ | CX1G | BRIDGE REPLACEMENT |
JEFFREY DAVIDSON
602-712-8534 |
05/28/2013 | 6/20/2013 |
| 0000 | NA | NNA | SL52101C | H | CHEVELON CREEK BRIDGE REHAB | PA1G | CONSTRUCT BRIDGE REPAIRS |
JEFFREY DAVIDSON
602-712-8534 |
5/21/2013 | |
| 0000 | GI | PAY | SH58001C | P | TOWN OF PAYSON PAVEMENT MARKING U | ME1M | PAVEMENT MARKINGS |
TRENT THATCHER
602-712-4544 |
05/28/2013 | 6/3/2013 |
| 0000 | MA | PEO | SH50101C | E | CITY OF PEORIA INTERSECTION TRAFF | LV1L | PURCHASE/INSTALL SIGNAL HEADS |
TRENT THATCHER
602-712-4544 |
04/08/2013 A | 5/8/2013 |
| 0000 | MA | PHX | SS71501C | E | SALT RIVER PATHWAY - 24TH ST TO I | ZS1J | PATHWAY IMPROVEMENTS |
SUSAN ANDERSON
602-712-7607 |
05/28/2013 | 2/28/2013 |
| 0000 | MA | PHX | SS97901D | E | BLACK MOUNTAIN BLVD, SR 51/SR 101 | NG1L | NEW ROADWAY |
RON MCCALLY
602-712-7646 |
TBD | TBD |
| 0000 | NA | PLS | SS86401C | G | BILLY CREEK BRIDGE @ PORTER MOUNT | MD1K | CAPACITY ADDITIONS - MAJOR WIDENING |
JEFFREY DAVIDSON
602-712-8534 |
05/31/2013 | 6/28/2013 |
| 0000 | PM | PPM | SH58901C | T | LAMBERT LANE ANDTHORNYDALE RD, PI | OY1M | DESIGN |
IRENE HIGGS
602-712-7581 |
Design | Design |
| 0000 | PM | PPM | SS97501C | T | VALENCIA ROAD: WADE RD TO MARK RD | JM1L | WIDEN ROADWAY |
SUSAN ANDERSON
602-712-7607 |
06/25/2013 | 6/24/2013 |
| 0000 | PN | PPN | SS91901D | T | HUNT HIGHWAY - | UK1K | SYSTEM PRESERVATION - ENGINEERING |
JEFFREY DAVIDSON
602-712-8534 |
04/10/2013 A | 5/10/2013 |
| 0000 | PN | PPN | SB41001C | G | KELVIN BRIDGE - #8441 | ZN1E | BRIDGE REPLACEMENT |
JEFFREY DAVIDSON
602-712-8534 |
05/29/2013 | 6/20/2013 |
| 0000 | YV | PRS | SF02701C | P | GURLEY ST AT ALARCON ST AND PLEAS | RB1M | SYSTEM ENHANCEMENT (OTHER ENHANCEMENTS) |
THOMAS JENSEN
602-712-7109 |
TBD | TBD |
| 0000 | YV | PRS | SF03001C | P | CAMPBELL AVE AND MILLER VALLEY RD | RE1M | SYSTEM ENHANCEMENT (OTHER ENHANCEMENTS) |
THOMAS JENSEN
602-712-7109 |
TBD | TBD |
| 0000 | YV | PRS | SF02901C | P | PARK AVE AT AZTEC ST, PRESCOTT | RD1M | SYSTEM ENHANCEMENT (OTHER ENHANCEMENTS) |
THOMAS JENSEN
602-712-7109 |
TBD | TBD |
| 0000 | YV | PRS | SF02801C | P | GRANITE ST AT CARLETON ST AND AUB | RC1M | SYSTEM ENHANCEMENT (OTHER ENHANCEMENTS) |
THOMAS JENSEN
602-712-7109 |
TBD | TBD |
| 0000 | MA | QCR | SS87601C | E | TOWNWIDE - ITS DEVELOPMENT | XY1K | SYSTEM ENHANCEMENT - TRAFFIC MGMT AND ENGINEERING |
SUSAN ANDERSON
602-712-7607 |
05/28/2013 | 2/28/2013 |
| 0000 | GH | SAF | SH47501C | S | CITY OF SAFFORD | JG1L | MAIN STREET TRAFFIC SIGNAL DESIGN AND INSTALLATION |
RON FOLUCH
602-712-8116 |
TBD | TBD |
| 0000 | MA | SCT | SS96701C | E | PAVEMENT PRESERVATION PHASE 3 | HZ1L | PAVEMENT PRESERVATION |
SUSAN ANDERSON
602-712-7607 |
06/28/2013 | 4/1/2013 |
| 0000 | YU | SLS | SZ01601D | Y | WIDENING AVE E FROM COUNTY 25TH S | ZV1L | SYSTEM ENHANCEMENT (ENGINEERING) |
PAUL PATANE
928-317-2115 |
11/25/2013 | 12/26/2013 |
| 0000 | YU | SLS | SZ01801D | Y | JUAN SANCHEZ BLVD IMPROVEMENTS FR | YN1L | ROAD & PEDSTRIAN IMPROVEMENTS, DRAINAGE |
PAUL PATANE
928-317-2115 |
Design | Design |
| 0000 | YU | SOM | SL68601D | Y | SOMERTON CANAL MUP:US95 TO COUNTY | XZ1K | SYSTEM ENHANCEMENT - ENGINEERING |
GREGORY JOHNSON
602-712-7774 |
TBD | TBD |
| 0000 | MA | SUR | SS95801C | E | DOVE VALLEY ROAD,18TH AVE-203RD A | JQ1L | ROADWAY IMPROVEMENTS |
ROBERT KNIGHTEN
602-712-7615 |
TBD | TBD |
| 0000 | MA | SUR | SS85401C | E | BELL RD-US 60 TO 114TH AVE | ZJ1K | CONSTRUCT MULTI-USE PATH |
ROBERT KNIGHTEN
602-712-7615 |
11/20/2014 | 7/31/2013 |
| 0000 | MA | TMP | SS95301C | E | SALT RIVER MUP: I-10/TEMPE DRAIN | BX1L | PATHWAY IMPROVEMENTS |
SUSAN ANDERSON
602-712-7607 |
06/11/2013 | 4/18/2013 |
| 0000 | MA | TMP | SS73401C | E | BROADWAY ROAD: RURAL TO MILL AVEN | LK1K | PEDESTRIAN IMPROVEMENTS |
SUSAN ANDERSON
602-712-7607 |
07/31/2014 | 8/29/2014 |
| 0000 | MA | TMP | SS96401C | E | VARIOUS LOCATIONS:WIRELESS COMMUN | HP1L | PROCUREMENT AND INSTALLATION |
SUSAN ANDERSON
602-712-7607 |
05/28/2013 | 6/28/2013 |
| 0000 | PM | TUC | SS73601C | T | TUCSON BOULEVARD MULTI-USE PATH | EP1K | MULTI-USE PATH |
SUSAN ANDERSON
602-712-7607 |
06/25/2013 | 6/28/2013 |
| 0000 | PM | TUC | SS63201C | T | CAMPBELL AVE - MAIN STREET | PW1H | MAIN STREET REVITALIZATION |
NATALIE CLARK
520-388-4252 |
05/28/2013 | 6/28/2013 |
| 0000 | PM | TUC | SS73001C | T | PANTANO BOULEVARD | WU1J | PAVEMENT RECONSTRUCTION |
SUSAN ANDERSON
602-712-7607 |
TBD | TBD |
| 0000 | PM | TUC | SS87503D | T | SPEEDWAY BLVD UNDERPASS @ UPRR | UU1K | ROADWAY RECONSTRUCTION |
SUSAN ANDERSON
602-712-7607 |
07/25/2013 | 6/3/2013 |
| 0000 | PM | TUC | SS86501C | T | KOLB ROAD CONNECTION TO SABINO CA | PU1K | ROADWAY AND SIDEWALK IMPROVEMENTS |
SUSAN ANDERSON
602-712-7607 |
05/16/2014 | 6/20/2014 |
| 0000 | PM | TUC | SS93703D | T | HOUGHTON RD: UPRR TO I-10 - WIDEN | GZ1L | ROADWAY WIDENING |
SUSAN ANDERSON
602-712-7607 |
12/02/2015 | 1/4/2016 |
| 0000 | PM | TUC | SS62403D | T | HOUGHTON ROAD WIDENING @ UPRR | BP1J | ROAD WIDENING OVER RAILROAD BRIDGE |
SUSAN ANDERSON
602-712-7607 |
TBD | TBD |
| 0000 | MA | WBG | SL69001C | P | 1962 HASSAYAMPA RIVER BRIDGE | HV1L | PEDESTRIAN/BICYCLE IMPROVEMENT |
PHIL JESELNIK
602-712-6685 |
05/29/2013 | 6/27/2013 |
| 0000 | NA | WIN | SL71101C | H | THE STATION AT LA POSADA | GA1L | REHAB OF STATION AND LANDSCAPE |
PHIL JESELNIK
602-712-6685 |
09/06/2013 | 10/7/2013 |
| 0000 | YU | YUM | SH58501C | Y | CITY OF YUMA VARIOUS LOCATIONS | JU1M | UPGRADE SIGNAL HEADS |
TRENT THATCHER
602-712-4544 |
05/28/2013 | 6/3/2013 |
| 0000 | YU | YYU | SB44501C | Y | BRIDGE REHABILITATION OLD HWY 80 | XD1L | BRIDGE REHABILITATION |
PAUL PATANE
928-317-2115 |
12/02/2013 | 1/2/2014 |
| 0000 | YU | YYU | SB43701C | Y | COUNTY 19TH ST BRIDGE OVER MAIN D | BA1L | BRIDGE REPLACEMENT |
PAUL PATANE
928-317-2115 |
06/27/2013 | 6/28/2013 |
| 0000 | YU | YYU | SS86101C | Y | S. FRONTAGE ROAD - AVENUE 9E TO A | ZP1K | PAVEMENT PRESERVATION |
PAUL PATANE
928-317-2115 |
05/28/2013 | 12/13/2013 |
| 0000 | YU | YYU | SH58603D | Y | SOMERTON AVENUE & COUNTY 18TH STR | NJ1M | DESIGN INTERSECTION IMPROVEMENTS |
ISABELL GARCIA
928-317-2159 |
Design | Design |
| 5013 | MA | 0.0 | SR14401C | E | 32ND ST ( PHX) #741-536-B | WM1L | SYSTEM PRESERVATION-MINOR BRIDGE REHABILITATION |
ARMANDO LOPEZ
602-712-8747 |
11/18/2013 | 11/19/2013 |
| 7018 | MA | 0.0 | SR09701C | E | 40TH ST PHOENIX 741-539-W | WN1L | SYSTEM PRESERVATION-MINOR BRIDGE REHABILITATION |
ARMANDO LOPEZ
602-712-8747 |
09/13/2013 | 1/24/2014 |
|
Privacy Statement | Contact ADOT
© Copyright Arizona Department of Transportation All Rights Reserved |