About Valley Freeways



Interstate 10

Interstate 17

US 60

Loop 101

Loop 202

Loop 303

State Route 51

State Route 74

State Route 85

State Route 87

State Route 143

State Route 801

State Route 802



Valley Transportation Program



Regional Contacts



Comments



Valley Freeways Home Page
 az511  az511
Adopt a Highway Program

 Adopt
 a
Highway
Program

US 60 (Grand Avenue)
US 60 (Grand Avenue)
US 60 (Grand Avenue)
US 60 (Grand Avenue)
US 60 (Grand Avenue)
US 60 (Grand Avenue)

Planned Improvements
The Regional Transportation Plan (RTP) includes funding to widen US 60 (Grand Avenue) by one lane in each direction along various segments between Loop 303 and Interstate 17 to create a continuous six-lane arterial by 2011. Other unspecified improvements to improve traffic flow on Grand Avenue are included in later phases of the 20-year transportation plan.

US 60 (Grand Avenue) - 99th to 83rd Avenues

  • Schedule: Phase I (2006-2010)* of the Regional Transportation Plan
  • Length: 2 miles
  • Budget: $10 million for construction
  • Project Summary: Funding is included in the Regional Transportation Plan to add one general-purpose lane in each direction to create a continuous six-lane arterial roadway.

This project is currently in the final design phase. Construction of this section is expected to start in early 2009 and be complete in early 2010.


US 60 (Grand Avenue) - Loop 303 to Loop 101

  I. Loop 303 to 99th Avenue - Widening Project
  • Schedule: Phase I (2006-2010)* of the Regional Transportation Plan
  • Project Summary: Funding is included in the Regional Transportation Plan to widen Grand Avenue by one general-purpose lane in each direction to create a continuous six-lane arterial roadway.

This project is currently in design. Construction of this section is anticipated to begin in early 2009 and be completed in early 2011.

  II. Loop 303 to Loop 101 - Other Improvements *
  • Schedule: Phase II (2011-2015)* of the Regional Transportation Plan
  • Project Summary: Funding is included in the RTP for improvements to traffic flow and other general improvements. Proposed improvements will be identified after completion of a feasibility study, which is expected to be complete in spring 2008.

US 60 (Grand Avenue) - Loop 101 (Agua Fria Freeway) to McDowell Road *

  • Schedule: Phase I (2006-2010)* of the Regional Transportation Plan.
  • Project Summary: Funding is included in the Regional Transportation Plan for improvements to traffic flow and other general improvements, which will be recommended after future studies.


US 60 (Grand Avenue) - Loop 101 (Agua Fria Freeway) to Van Buren Street *

  I. General Improvements
  • Schedule: Phase II (2011-2015)* of the Regional Transportation Plan. Construction funding is allocated in fiscal year 2014.
  • Project Summary: Funding is included in the RTP for measures to improve traffic flow and other general improvements, which will be recommended after future studies.
  II. General Improvements
  • Schedule: Phase IV (2021-2025)* of the Regional Transportation Plan.
  • Project Summary: Funding is included in the Regional Transportation Plan for measures to improve traffic flow and other general improvements.

 

Regional Transportation Plan Phases
Phase I
FY 2006-2010 Phase III FY 2016-2020
Phase II
FY 2011-2015 Phase IV FY 2021-2026

* Project pending outcome of the environmental process.

 

Divider
On The Move Our Valley Freeway System is part of the 2004 voter-approved Regional Transportation Plan. We are working hard with our transit partners to implement the voters’ vision and are committed to quality, safety, open communication with our neighbors, and minimal inconvenience to the traveling public.