State Route 801 East
State Route 801 East

State Route 801 East ~ Loop 303 to Loop 202

Study Planning - Detailed Project Overview

The goal of the planning stage is to establish the projects feasibility. Feasibility is studied from both an engineering and environmental perspective. Both studies are conducted simultaneously and collaberatively. The planning stage establishes the general location and basic characteristics (number of lanes, interchanges, etc.) of a roadway. Accompanying this are environmental studies (noise, etc.), identification and evaluation of alternatives, general cost estimates, and the determination of feasibility to move to the design phase.

Studies

The engineering studies evaluate each possible alternative and narrow the choices to a final selection. Visit the Engineering Studies page for a detail description of this study.

Developed in conjunction with the engineering studies, the environmental studies evaluate the study area and the proposed alignment alternatives. A detailed description of the environmental studies are also available.

• Draft Environmental Assessment – Spring 2008
• Public Hearing - Spring 2008
• Final Environmental Assessment - Fall 2008
• Environmental Determination – Late 2008

Divider

On The Move Our Valley Freeway System is part of the 2004 voter-approved Regional Transportation Plan. We are working hard with our transit partners to implement the voters’ vision and are committed to quality, safety, open communication with our neighbors, and minimal inconvenience to the traveling public.