Project MapProject Map of FMS Phase 6B

Ramp Meter Project

Loop 101 Price Freeway: Baseline Rd to Chandler Blvd in Chandler, Mesa, and Tempe, AZ.

This ramp meter project included the installation of eight new ramp meters on Loop 101 (Price) from Loop 202 (Red Mountain) to US 60 (Superstition).  The project cost $700,000 for design and construction.  The designer was Kimley-Horn and Associates.  The contractor was CS Construction, Inc.  Design began in January 2009.  Construction was completed in February 2011.

Ramp Meter

Ramp Meter Controller Cabinet

Project Map Legend