This map shows the initial corridor being evaluated during the scoping and alternatives development phase of the study process. This corridor was identified during the feasibility study.
This map shows the initial corridor, along with some possible highway alignment options. The large pink dots represent possible interchange locations. These alignment and interchange locations are very preliminary, and will be revised based on comments received from the public and agencies during the scoping process.