skip navigation
Arizona Department of Transportation
 
ITD - Highways Home Page Home Page :: Site Index
 
Overview

Timeline

Maps

Team

Public Meetings

Public Notices and Publications

Public Feedback

FAQ

Glossary

Links



SR 95 Realignment Study Home Page
Arizona Travel Information Travel Info AZ511.gov
Adopt a Highway Program Adopt a Highway Program
U.S. 2010 Census - 2010.census.gov
State Route 95 Realignment Study
 
SR 95 Realignment Study: I-40 to SR 68

Location/Design Concept Report and Environmental Impact Statement

Feasibility Study Maps and Primary Exhibits

  Study Area Map
  Corridor A Corridor Concept
  Corridor B Corridor Concept
  Corridor C Corridor Concept
  Corridor D Corridor Concept
  All Corridors Considered
  Feasible Consolidated Corridors
  Biological Resources
  General Project Issues
 

Divider
 

Location / Design Concept Report Maps and Primary Exhibits

State Location Map

Study Location Map

Initial Corridor Map (Based on Feasibility Study)

This map shows the initial corridor being evaluated during the scoping and alternatives development phase of the study process. This corridor was identified during the feasibility study.

Project Vicinity & Initial Alternatives Map

This map shows the initial corridor, along with some possible highway alignment options. The large pink dots represent possible interchange locations. These alignment and interchange locations are very preliminary, and will be revised based on comments received from the public and agencies during the scoping process.

 

Divider
 

Privacy Statement | Contact ADOT
© Copyright Arizona Department of Transportation. All Rights Reserved