skip navigation
Arizona Department of Transportation
 
ITD - Highways Home Page Home Page :: Site Index
 
Cordes Junction Interchange

Interstate 17

Roundabout Sign Options

State Route 87

State Route 89 and State Route 89A Corridors

State Route 169

State Route 260 Little Green Valley

Wickenburg



Additional Planned Projects

Completed Projects



Prescott District Projects Home Page
az511 az511
Adopt a Highway Program Adopt a Highway Program

State Route 87

bullet SR 87 and Airport Road    

Payson to Pine Safety Improvements

The Arizona Department of Transportation has started a project to improve State Route 87 between Payson and Pine which has been funded by the American Recovery and Reinvestment Act. Crews are working on safety improvements and resurfacing the roadway with rubberized asphalt. Roadway safety enhancements will include upgraded guardrails, widened shoulders, widened roadway for turn lanes, extended box culverts for improved drainage and improved signage. Work began in June and is expected to be complete by early 2010.

SR 87 Payson to Pine

This project includes two different segments where work is being conducted.  Segment 1 is located near Payson between mileposts (MP) 254.62 and 255.94 and segment 2 is located near Pine between MP 265.61 and 266.69.

Current Activities on Segment 1

Work hours are between 6:30 a.m. and 3:00 p.m., Tuesday through Thursday. The roadway will be reduced to one lane as crews continue excavation in Segment 1. During work hours, a flagger will hold traffic until a pilot car can guide motorists safely through the route. In addition to pilot cars, message boards and temporary signage will be in place to assist in directing traffic. Delays can be expected of up to 30 minutes during peak travel hours. Please allow additional time to reach your destination.

Current Activities on Segment 2

Milling of the Shoulder

Crews will begin to remove a layer of existing asphalt from the shoulder of the southbound lane in Segment 2 the week of October 12 in preparation for paving operations. Although there are no lane closures or restrictions scheduled for Segment 2 the week of October 12, drivers are asked to use extra caution and anticipate brief delays through the work zone. Flaggers may be present to safely allow trucks and machinery to access the work zone.

Seeding Begins

Seeding of the east side of Segment 2 will begin on Tuesday, October 13. Seeding of shoulder areas limits the impacts of noxious weeds and invasive non-native plants, while restoring the landscape within and along the right-of-way.

Bradshaw Road Closed

Bradshaw Road is closed to traffic and is anticipated to open once construction on SR 87 is complete.  Crews are excavating Bradshaw Road in order to align the new road with SR 87. This will accommodate the new turn lanes at Bradshaw Road. A clearly marked detour is in place to direct motorists to Old County Road just north of Bradshaw Road for access to businesses and residential properties.

SR 87 Safety Improvements Bradshaw Road

Stay Informed Throughout Construction

ADOT strives to keep the public informed about construction projects, lanes restrictions, and closures.  An electronic construction update is available for this project.


SR 87 and Airport Road

The Arizona Department of Transportation (ADOT), working together with the town of Payson, is planning a modern roundabout at State Route (SR) 87 and Airport Road.

ADOT is in the very early stages of design and has presented this information to the elected leaders in Payson and residents of Payson.

The final design won’t be complete until late 2008; environmental clearances will be done in late 2008; right of way acquisition will be complete in early 2009; with construction beginning in summer of 2009 and completed by fall of 2009. The town and ADOT are sharing the cost of the roundabout.

Project Details

Select a map below to view a larger version.

State Route 87 Existing Conditions            State Route 87 Proposed Right of Way
                    

State Route 87 Proposed Roundabout

                                          

 
 

Contact Information

1.877.521.1118
or
Contact
Prescott District Updates


Sign up for Construction Updates!

First Name

Last Name

Email

Zip Code



I would like to be on the mailing list
for the following projects:

   State Route 89
   State Route 69
   State Route 169
      (Dewey-Humboldt)
   State Route 260 - Verde Valley
   State Route 260 - Rim Country
   State Route 87
      (SR 87 Payson to Pine)
   I-17 Black Canyon Hill
   I-17 McGuireville TI
      (Verde Valley)

 
Privacy Statement | Contact ADOT
© Copyright Arizona Department of Transportation. All Rights Reserved