I-10 Tangerine Road to Ina Road Study

   

The Arizona Department of Transportation and Federal Highway Administration are beginning an engineering and environmental study of Interstate 10 between Tangerine Road and Ina Road. The goal for this study is to develop a long-range plan for providing an improved roadway for general traffic, commuters and truck traffic traveling along this portion of the I-10 corridor. To support that goal, the study will:

  • Develop and evaluate possible alternatives for widening I-10.
  • Develop and evaluate possible alternatives for reconstructing the Cortaro Road and Avra Valley Road interchanges to provide grade-separated crossings with the Union Pacific Railroad (UPRR).
  • Look at potential improvements to frontage roads in the study area.

The study will include:

  • An Alternative Selection Report (ASR) to identify and assess possible alternatives, including the consequences of not making any improvements along this corridor (no-build alternative).
  • A Design Concept Report (DCR) to document the preferred alternative.
  • An Environmental Assessment (EA) to document public and agency outreach and the potential impacts to the social, economic and natural environments.
  • A Corridor Implementation Plan for recommended improvements.

Update

May 2013
Interstate 10 Tangerine Road to Ina Road Study

The Arizona Department of Transportation and Federal Highway Administration will be concluding an engineering and environmental study of Interstate 10 between Tangerine Road and Ina Road later this year. The goal of the study is to develop a long-range plan for an improved roadway along this portion of the I-10 corridor. A summary of the study's outcomes will be provided online in late summer or early fall. In addition, the following documents will be available for the public's review and comment.

  • Alternative Selection Report
  • Design Concept Report

Next Steps- Design and Construction

Further phases of this project beyond this initial study are currently unfunded in the Statewide Transportation Program. Once funding is identified, an environmental document can be finalized and design and construction phases can begin.

For More Information

Website: www.azdot.gov/tangerine2ina.
Email: projects@azdot.gov
Phone: 1.855.712.8530

ADOT Project No. 10 PM 240 H7960 01L Federal Aid No. 010-D (209)

Your thoughts, opinions and ideas are important to ADOT. We encourage public participation and look forward to hearing from you by phone or email.

Project Information

1.855.712.8530

Subscribe to receive future project updates  Keep informed about this project, subscribe to receive future project updates by email.

    Arizona Department of Transportation    
   Disclaimer & Privacy Statement  |   Contact ADOT