ITD - Highways Home Page Home Page 
 







 

Interstate 10: Earley Road to Interstate 8 Improvement Project

   

The Arizona Department of Transportation is designing improvements to Interstate 10, between Earley Road and Interstate 8 near Casa Grande. The purpose of the project is to increase capacity, improve traffic flow and enhance safety on this segment of I-10. Construction is not funded at this time.

Planned improvements include:

  • Widening I-10 from two lanes to three lanes in each direction
  • Rubberized asphalt paving
  • Florence Boulevard ramp upgrades
  • Adding a new traffic interchange at Selma Highway
  • Removing existing traffic interchange at Jimmie Kerr Boulevard
  • New U-turn at Jimmie Kerr Boulevard
  • Two new I-10 bridges over Jimmie Kerr Boulevard and the Union Pacific Railroad
  • New one-way frontage roads between Selma Highway and Jimmie Kerr Boulevard
  • Increasing Selma Highway from one lane to two lanes in each direction at its intersection with I-10
  • Paving Hacienda Road between Earley Road and Selma Highway

Your thoughts, opinions and ideas are important to ADOT. We encourage public participation and look forward to hearing from you by phone or email.

projects@azdot.gov

Project Hotline: 855.712.8530

 

    Arizona Department of Transportation    
   Disclaimer & Privacy Statement  |   Contact ADOT