skip navigation
Arizona Department of Transportation
 
ITD - Highways Home Page Home Page :: Site Index
 
Site Map

EPG's FTP Site



Planning

Material Sources

Air Quality

Noise

Hazardous Materials

Biology/Water Quality

Cultural Resources



Environmental Documents

Guidance

Videos

Public Notices

Links



Quiet Roads

Contact EPG



Environmental Planning Group Home Page
Arizona Travel Information Travel Info AZ511.gov
Adopt a Highway Program Adopt a Highway Program
U.S. 2010 Census - 2010.census.gov

  
Contractor-Furnished Material Sources

Overview of the Application Process
Contractor-Furnished Material Sources must go through a multiple-step process in order to obtain environmental clearance for use on ADOT projects. First, the material source owner or operator must submit an initial Material Source Environmental Analysis Application, with cultural survey and reports, to the Environmental Planning Group. Upon receipt of a completed application, the Environmental Planning Group will initiate a cultural consultation process. When this process is successfully completed, the material source will receive a tracking number and may be included on the list at the bottom of this page. For any use of the material source thereafter, an Environmental Analysis Update must be completed and submitted to the project Resident Engineer for approval.

Please note that any changes to the location of a material source or haul road, or expansion of boundaries will require additional cultural consultation. In some cases, the contractor’s proposed activities may differ than those approved previously and may require additional review and approval. Additionally, changes in ownership require that a new application be completed. Please contact the Environmental Planning Group for more information.

Environmental Planning Group Contact Information
The initial Environmental Analysis for a Contractor-Furnished Material Source is handled by the Environmental Planning Group. Please note that the review and cultural consultation process takes 45 days from the receipt of a complete application. Submit initial applications, ownership changes, and any revisions to site use or boundaries to:

Angela Roach
Environmental Planning Group
Arizona Department of Transportation
1221 S. 2nd Ave., MD T100
Tucson, AZ  85713

Telephone: 1.520.388.4253
Fax: 1.520.388.4255
Email: aroach@azdot.gov
Please direct any questions concerning the application process, forms, current status, approval, and other related material source issues to Angela Roach through the above contact information.

Material Source Environmental Analysis Application
All applicants shall use this Material Source Environmental Analysis Application form to initiate the ADOT Environmental Analysis process in accordance with the ADOT specifications. As a reminder, state, vicinity, and site maps are required with each application. Be sure to illustrate the haul road on the vicinity and site maps. Please note that the cultural survey and other questions, such as the ones pertaining to Threatened & Endangered Species or Clean Water Act Permitting, require that the haul road and the entire proposed material source area be included in the evaluations and surveys. (ADOT defines a haul road as a road leading from a government-maintained road to the material source.)

 Material Source Environmental Analysis Application

Material Source Environmental Analysis Update
For each project, the ADOT contractor electing to provide material from a contractor-furnished source must submit the Material Source Environmental Analysis Update form to the project Resident Engineer. In so doing, the Contractor agrees to the compliance measures, including any and all mitigation measures, stipulated in the original Environmental Analysis. Additional requirements regarding supplying material to ADOT for a project are included in the bid package and the ADOT specifications (link below). Copies of the original Environmental Analysis and information on mitigation measures may be obtained by contacting the Environmental Planning Group at the address given above.

 Material Source Environmental Analysis Update

State Historic Preservation Office Administrative Procedures
The attached documents outline the qualifications for archaeologists and procedures to assist the archaeologist in preparing cultural resource survey reports for consultation with the State Historic Preservation Office (SHPO). These documents are downloaded as a pdf file and are to be viewed using Adobe Reader. Note: the application is not considered complete until all copies of the report are provided.

 Qualifications for Archaeologists
 SHPO Administrative Procedures

ADOT Specification 104.12
This is the official reference for preparing Environmental Analysis documents for Contractor-Furnished Material Sources.

 Specification 104.12

ADOT Specification 1001
This is the official reference for guidelines for electing to provide material to ADOT.

 Specification 1001

List of Contractor-Furnished Material Sources That Have Completed the Environmental Analysis and Cultural Consultation Process
This report lists those contractor-furnished material sources that have previously completed an Environmental Analysis including the cultural consultation process. Being on this list does not guarantee that the material source will be available for all projects. The Resident Engineer has final approval.

 Contractor Furnished Material Sources List

Documents are posted as they become available in PDF format, which requires Adobe Reader to view.

 

Privacy Statement | Contact ADOT
© Copyright Arizona Department of Transportation. All Rights Reserved