Section 404 - 401 Procedures, Applications and Permits
Section 404 Procedures Manual
This manual provides guidance on the preparation of jurisdictional
delineations, Nationwide Permit preconstruction notification submittals,
and Individual Permit applications. This manual is divided into
5 easy-to-follow steps beginning with jurisdictional delineations
and ending with Section 401 certification. This is a must resource
for all practitioners involved with Section 404 permitting.
Note: This Manual was completely updated in November
2007 to reflect the new Nationwide Permits and to update submittal
requirements for the Corps and ADEQ. Please refer to the Revision
Chart for subsequent updates.
Notification Forms
These three forms consist of Certification of Compliance, Notification
of Commencement of Work, and Notification of Completion of Work.
Certification
of Compliance with Department of the Army Nationwide Permit
Notification
of Commencement of Work
Notification
of Completion of Work
Instruction to Contractors
These two downloads include: 1) a one-page document emphasizing
the need for contractor to follow mitigation measures on ADOT
projects, including those under Section 404, and 2) a checklist
for contractors to follow on the Section 404 requirements.
Environmental
Protection on ADOT Projects - Instruction to Contractors
Checklist
for Environmental Compliance
Stand-Alone Nationwide Permits for Arizona
These downloads contain all of the terms and conditions of stand-alone
Section 404 Nationwide Permits, effective March 19, 2007. Each
download is a Word document; the file size varies between 130KB
- 200KB.
Documents are posted as they become available in PDF format,
which requires Adobe
Reader to view.
|