The work includes widening 15 miles of roadway, replacing two bridges and widening 10 others, and constructing approximately eight miles of flex lanes.
The Arizona Department of Transportation completed this project in June 2023. The project installed a high-speed fiber optic backbone along Interstate 17 from Van Buren Avenue to Anthem Way, connecting existing Intelligent Transportation System (ITS) devices with new ITS improvements. This system connects Dynamic Message Signs (DMS) that provide drivers with real-time, traffic-related information, ramp metering and CCTV cameras along the corridor.
As the primary route from the city of Maricopa to the Phoenix area, State Route 347 (SR 347) has become a highly traveled corridor. In spring 2023, ADOT completed a safety study on SR 347 between I-10 and the northern city limits of Maricopa. The Road Safety Assessment (RSA) identified
The Arizona Department of Transportation completed a study in 2023 that evaluated improvements to the Loop 101 (Agua Fria Freeway) and Interstate 10 system interchange in the West Valley.
This project is in partnership with the Maricopa Association of Governments, and in cooperation
The work will include upgrading the stormwater pump stations: replacing the existing pumps, gear drives, engines, and improving the electrical and control system. Upgrading and replacing the existing pump stations will allow the Deck Park Tunnel to continue operating efficiently, to remove water from the tunnel and the sub-grade roadway.
The Arizona Department of Transportation (ADOT), in cooperation with the Federal Highway Administration (FHWA), initiated an interim improvement project on Interstate 17 from the I-10/I-17 "Split" Interchange to 19th Avenue. Growing traffic demand has caused the I-17 corridor from the
The Arizona Department of Transportation, in association with the Maricopa Association of Governments, and in coordination with the Federal Highway Administration and the city of Phoenix, has completed an environmental study and Design Concept Report (DCR) for a project to improve traffic flow and safety at Interstate 17 and Indian School Road in Phoenix.
The Arizona Department of Transportation (ADOT) advises drivers to plan for ongoing lane and turn restrictions on SR 347/John Wayne Parkway, between the northern Maricopa limits and Smith Enke Road (SR 238) for a project to widen and repave the roadway. Drivers should be prepared to slow
The Arizona Department of Transportation, in partnership with the town of Gilbert, completed a new interchange on the Loop 202 Santan Freeway Lindsay Road in September 2022.
The Arizona Department of Transportation, in cooperation with the cities of Glendale, Phoenix and Peoria, the Federal Highway Administration and the Maricopa Association of Governments, has initiated a project to widen and make other improvements to the Loop 101 (Agua Fria Freeway)